X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0275072409000

Well Details

Well ID: 0275072409000
Loading map...
Location: 00/09-24-027-07W5/0
Location Alias: 00/09-24-27-07 W5M
Location Alias 2: 00/09-24-027-07 W5/00
Country: Canada
Province: Alberta
Township: 027
Meridian: 5
Range: 07
Section: 24
County/Municipality: Municipal District of Bighorn No. 8
Well Name: Canlin WCATH 9-24-27-7
Operator Name: Canlin Energy Corporation
License Number: 0287925
License Date: 2003-06-03
License Status: Abandoned
Spud Date: 2003-07-11
Final Drill Date: 2003-08-04
Well Total Depth: 2615.00 m
Surface Hole Latitude: 51.318225
Surface Hole Longitude: -114.852116

For data sources see[1][2]

Well History

Date Event
2003-06-03 Obtained License
2003-07-12 Direction Drilling Operation Performed - Deviate
2003-07-16 Surface Casing Operation Performed
2003-07-29 Well Log Performed
2003-08-04 Finished Drilling
2003-08-04 Well Log Performed
2003-08-04 Well Mode changed to Drilled and Cased
2003-08-05 Well Log Performed
2003-08-07 Production Casing Operation Performed
2003-08-07 Rig Released
2003-09-05 Well Log Performed
2003-09-10 Perforation Treatment Performed - Jet Perforation
2003-09-18 Perforation Treatment Performed - Fractured
2003-09-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-09-20 Perforation Treatment Performed - Jet Perforation
2003-09-20 Plug Back Performed
2003-09-20 Well Mode changed to Abandoned Zone
2003-09-23 Perforation Treatment Performed - Fractured
2003-09-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-09-28 Perforation Treatment Performed - Jet Perforation
2003-09-28 Plug Back Performed
2004-01-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-01-22 Perforation Treatment Performed - Jet Perforation
2004-01-22 Plug Back Performed
2004-01-23 Perforation Treatment Performed - Cement Plug
2004-01-23 Perforation Treatment Performed - Remedial Casing
2004-01-24 Perforation Treatment Performed - Cement Plug
2004-01-24 Perforation Treatment Performed - Jet Perforation
2004-01-24 Perforation Treatment Performed - Remedial Casing
2004-01-26 Perforation Treatment Performed - Cement Plug
2004-01-26 Perforation Treatment Performed - Jet Perforation
2004-01-26 Perforation Treatment Performed - Remedial Casing
2004-01-26 Well Log Performed
2004-01-29 Perforation Treatment Performed - Abrasa-Jet Perforation
2004-01-30 Perforation Treatment Performed - Cement Plug
2004-01-30 Perforation Treatment Performed - Remedial Casing
2004-02-05 Perforation Treatment Performed - Jet Perforation
2004-02-06 Perforation Treatment Performed - Cement Plug
2004-02-06 Perforation Treatment Performed - Remedial Casing
2004-05-02 Well Log Performed
2004-06-19 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2003-07-12 42.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2003-09-10 Perforation 2483.00 2486.00 17
2004-01-23 Remedial Casing Cementing 1271.00 1274.00 0
2004-01-23 Cement Plug 1164.60 1271.00 0
2004-01-24 Perforation 674.50 677.50 17
2004-01-24 Remedial Casing Cementing 674.50 677.50 0
2004-01-24 Cement Plug 641.30 674.50 0
2004-01-26 Perforation 552.00 555.00 17
2004-01-26 Remedial Casing Cementing 552.00 555.00 0
2004-01-26 Cement Plug 507.00 552.00 0
2004-01-29 Hydra Jet Perforation 494.50 498.50 1
2004-01-30 Remedial Casing Cementing 494.50 498.50 0
2003-09-18 Fracture 2483.00 2486.00 0
2004-01-30 Cement Plug 490.00 494.50 0
2004-02-05 Perforation 473.00 475.00 13
2004-02-05 Perforation 482.00 484.00 13
2004-02-06 Remedial Casing Cementing 482.00 484.00 0
2004-02-06 Remedial Casing Cementing 473.00 475.00 0
2004-02-06 Cement Plug 413.70 473.00 0
2003-09-20 Packing Device Capped w/Cement 2464.00 2472.00 0
2003-09-20 Perforation 2278.00 2282.00 17
2003-09-23 Fracture 2278.00 2282.00 0
2003-09-28 Packing Device Capped w/Cement 2260.00 2268.00 0
2003-09-28 Perforation 2163.00 2166.00 17
2004-01-22 Packing Device Capped w/Cement 2147.00 2155.00 0
2004-01-22 Perforation 1271.00 1274.00 13

For data sources see[5]



References