X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0164293608000"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0164293608000
 
| Well ID: 0164293608000
| style="height=100%; align=center" rowspan="14" | {{#display_map: 50.388969, -113.855962 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 50.388969, -113.855962 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/08-36-016-29W4/0
 
| Location: 00/08-36-016-29W4/0
Line 10: Line 10:
 
|-
 
|-
 
| Location Alias 2: 00/08-36-016-29 W4/00
 
| Location Alias 2: 00/08-36-016-29 W4/00
 +
|-
 +
| Country: Canada
 
|-
 
|-
 
| Province: Alberta
 
| Province: Alberta
 +
|-
 +
| Township: 016
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 29
 +
|-
 +
| Section: 36
 
|-
 
|-
 
| County/Municipality: [[Municipal District of Willow Creek No. 26,_Alberta|Municipal District of Willow Creek No. 26]]
 
| County/Municipality: [[Municipal District of Willow Creek No. 26,_Alberta|Municipal District of Willow Creek No. 26]]
Line 17: Line 27:
 
| Well Name: ESSO NANTON 8-36-16-29
 
| Well Name: ESSO NANTON 8-36-16-29
 
|-
 
|-
| Operator Name:  
+
| Operator Name: [[Imperial Oil Resources Limited]]
 
|-
 
|-
 
| License Number: 0084971
 
| License Number: 0084971
Line 29: Line 39:
 
| Final Drill Date: 1980-10-11
 
| Final Drill Date: 1980-10-11
 
|-
 
|-
| Well Total Depth: 2665 m
+
| Well Total Depth: 2665.00 m
 
|-
 
|-
 
| Surface Hole Latitude: 50.388969
 
| Surface Hole Latitude: 50.388969
Line 38: Line 48:
 
  | title = General Well Data File - Licensing Data
 
  | title = General Well Data File - Licensing Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref><ref>{{cite web
+
  | accessdate = 2020-05-07 }}</ref><ref>{{cite web
 
  | title = General Well Data File - Drilling Data
 
  | title = General Well Data File - Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1909-09-09
 +
| Well Log Performed
 +
|-
 +
| 1980-08-15
 +
| Obtained License
 +
|-
 +
| 1980-10-07
 +
| Well Log Performed
 +
|-
 +
| 1980-10-11
 +
| Finished Drilling
 +
|-
 +
| 1980-10-12
 +
| Well Log Performed
 +
|-
 +
| 1980-10-14
 +
| Production Casing Operation Performed
 +
|-
 +
| 1980-11-30
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1980-12-01
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1980-12-01
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 1980-12-06
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1980-12-07
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1980-12-09
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1980-12-10
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1980-12-11
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1980-12-12
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1980-12-15
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1980-12-20
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1981-01-16
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1981-01-17
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1981-01-23
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1981-02-19
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1981-02-21
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1981-02-27
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1981-02-27
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1981-03-02
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1981-03-07
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1981-03-10
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 1981-07-24
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1981-07-26
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1981-07-31
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1981-07-31
 +
| Well Abandoned
 +
|-
 +
| 1981-07-31
 +
| Well Mode changed to Abandoned and Re-entered
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-04-29 }}</ref>
 
<!--== Spud Table ==
 
<!--== Spud Table ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 74: Line 192:
 
| 1980-11-30
 
| 1980-11-30
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2590
+
| style="text-align: right;" | 2590.00
| style="text-align: right;" | 2596
+
| style="text-align: right;" | 2596.00
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
 
|-
 
|-
 
| 1980-12-01
 
| 1980-12-01
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 2590
+
| style="text-align: right;" | 2590.00
| style="text-align: right;" | 2596
+
| style="text-align: right;" | 2596.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1980-12-01
 
| 1980-12-01
| Fracture  
+
| Fracture
| style="text-align: right;" | 2590
+
| style="text-align: right;" | 2590.00
| style="text-align: right;" | 2596
+
| style="text-align: right;" | 2596.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1980-12-06
 
| 1980-12-06
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 2572
+
| style="text-align: right;" | 2572.00
| style="text-align: right;" | 2580
+
| style="text-align: right;" | 2580.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1980-12-07
 
| 1980-12-07
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2558
+
| style="text-align: right;" | 2558.00
| style="text-align: right;" | 2562
+
| style="text-align: right;" | 2562.00
 
| style="text-align: right;" | 6
 
| style="text-align: right;" | 6
 
|-
 
|-
 
| 1980-12-09
 
| 1980-12-09
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 2552.5
+
| style="text-align: right;" | 2552.50
| style="text-align: right;" | 2556.5
+
| style="text-align: right;" | 2556.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1980-12-10
 
| 1980-12-10
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2544
+
| style="text-align: right;" | 2544.00
| style="text-align: right;" | 2549
+
| style="text-align: right;" | 2549.00
 
| style="text-align: right;" | 6
 
| style="text-align: right;" | 6
 
|-
 
|-
 
| 1980-12-11
 
| 1980-12-11
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 2544
+
| style="text-align: right;" | 2544.00
| style="text-align: right;" | 2549
+
| style="text-align: right;" | 2549.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1980-12-12
 
| 1980-12-12
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 2544
+
| style="text-align: right;" | 2544.00
| style="text-align: right;" | 2549
+
| style="text-align: right;" | 2549.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1980-12-15
 
| 1980-12-15
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 2544
+
| style="text-align: right;" | 2544.00
| style="text-align: right;" | 2549
+
| style="text-align: right;" | 2549.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1980-12-20
 
| 1980-12-20
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 2544
+
| style="text-align: right;" | 2544.00
| style="text-align: right;" | 2549
+
| style="text-align: right;" | 2549.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1981-01-16
 
| 1981-01-16
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2544
+
| style="text-align: right;" | 2544.00
| style="text-align: right;" | 2549
+
| style="text-align: right;" | 2549.00
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
 
|-
 
|-
 
| 1981-01-17
 
| 1981-01-17
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 2544
+
| style="text-align: right;" | 2544.00
| style="text-align: right;" | 2549
+
| style="text-align: right;" | 2549.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1981-01-23
 
| 1981-01-23
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 2544
+
| style="text-align: right;" | 2544.00
| style="text-align: right;" | 2549
+
| style="text-align: right;" | 2549.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1981-02-19
 
| 1981-02-19
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2544
+
| style="text-align: right;" | 2544.00
| style="text-align: right;" | 2549
+
| style="text-align: right;" | 2549.00
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
 
|-
 
|-
 
| 1981-02-21
 
| 1981-02-21
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 2544
+
| style="text-align: right;" | 2544.00
| style="text-align: right;" | 2546
+
| style="text-align: right;" | 2546.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1981-02-27
 
| 1981-02-27
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 2544
+
| style="text-align: right;" | 2544.00
| style="text-align: right;" | 2549
+
| style="text-align: right;" | 2549.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1981-02-27
 
| 1981-02-27
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 2505
+
| style="text-align: right;" | 2505.00
| style="text-align: right;" | 2533
+
| style="text-align: right;" | 2533.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1981-03-02
 
| 1981-03-02
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2200
+
| style="text-align: right;" | 2200.00
| style="text-align: right;" | 2204
+
| style="text-align: right;" | 2204.00
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
 
|-
 
|-
 
| 1981-03-02
 
| 1981-03-02
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2214
+
| style="text-align: right;" | 2214.00
| style="text-align: right;" | 2217
+
| style="text-align: right;" | 2217.00
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
 
|-
 
|-
 
| 1981-03-07
 
| 1981-03-07
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 2200
+
| style="text-align: right;" | 2200.00
| style="text-align: right;" | 2217
+
| style="text-align: right;" | 2217.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1981-03-10
 
| 1981-03-10
| Fracture  
+
| Fracture
| style="text-align: right;" | 2200
+
| style="text-align: right;" | 2200.00
| style="text-align: right;" | 2217
+
| style="text-align: right;" | 2217.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1981-07-24
 
| 1981-07-24
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 2177
+
| style="text-align: right;" | 2177.00
| style="text-align: right;" | 2185
+
| style="text-align: right;" | 2185.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1981-07-26
 
| 1981-07-26
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2103
+
| style="text-align: right;" | 2103.00
| style="text-align: right;" | 2109
+
| style="text-align: right;" | 2109.00
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
 
|-
 
|-
 
| 1981-07-31
 
| 1981-07-31
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 2103
+
| style="text-align: right;" | 2103.00
| style="text-align: right;" | 2109
+
| style="text-align: right;" | 2109.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 226: Line 344:
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Start Date
+
!scope="col" | Job Number
!scope="col" | End Date
+
!scope="col" | Job Start Date
!scope="col" | Chemical Name
+
!scope="col" | Job End Date
!scope="col" style="text-align: right;" | CAS Number
+
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Purpose
!scope="col" style="text-align: right;" | Job Percentage
+
!scope="col" | Ingredient Name
!scope="col" | Supplier
+
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 
|}-->
 
|}-->
  

Revision as of 20:26, 12 July 2020

Well Details

Well ID: 0164293608000
Loading map...
Location: 00/08-36-016-29W4/0
Location Alias: 00/08-36-16-29 W4M
Location Alias 2: 00/08-36-016-29 W4/00
Country: Canada
Province: Alberta
Township: 016
Meridian: 4
Range: 29
Section: 36
County/Municipality: Municipal District of Willow Creek No. 26
Well Name: ESSO NANTON 8-36-16-29
Operator Name: Imperial Oil Resources Limited
License Number: 0084971
License Date: 1980-08-15
License Status: Re-Entered
Spud Date: 1980-09-09
Final Drill Date: 1980-10-11
Well Total Depth: 2665.00 m
Surface Hole Latitude: 50.388969
Surface Hole Longitude: -113.855962

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-08-15 Obtained License
1980-10-07 Well Log Performed
1980-10-11 Finished Drilling
1980-10-12 Well Log Performed
1980-10-14 Production Casing Operation Performed
1980-11-30 Perforation Treatment Performed - Jet Perforation
1980-12-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-12-01 Perforation Treatment Performed - Fractured
1980-12-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-12-07 Perforation Treatment Performed - Jet Perforation
1980-12-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-12-10 Perforation Treatment Performed - Jet Perforation
1980-12-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-12-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-12-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-12-20 Perforation Treatment Performed - Cement Squeeze
1981-01-16 Perforation Treatment Performed - Jet Perforation
1981-01-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-01-23 Perforation Treatment Performed - Cement Squeeze
1981-02-19 Perforation Treatment Performed - Jet Perforation
1981-02-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-02-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-02-27 Perforation Treatment Performed - Cement Squeeze
1981-03-02 Perforation Treatment Performed - Jet Perforation
1981-03-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-03-10 Perforation Treatment Performed - Fractured
1981-07-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-07-26 Perforation Treatment Performed - Jet Perforation
1981-07-31 Perforation Treatment Performed - Cement Squeeze
1981-07-31 Well Abandoned
1981-07-31 Well Mode changed to Abandoned and Re-entered

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-11-30 Perforation 2590.00 2596.00 7
1980-12-01 Acid Treatment 2590.00 2596.00 0
1980-12-01 Fracture 2590.00 2596.00 0
1980-12-06 Packing Device Capped w/Cement 2572.00 2580.00 0
1980-12-07 Perforation 2558.00 2562.00 6
1980-12-09 Packing Device Capped w/Cement 2552.50 2556.50 0
1980-12-10 Perforation 2544.00 2549.00 6
1980-12-11 Acid Treatment 2544.00 2549.00 0
1980-12-12 Acid Treatment 2544.00 2549.00 0
1980-12-15 Acid Treatment 2544.00 2549.00 0
1980-12-20 Cement Squeeze 2544.00 2549.00 0
1981-01-16 Perforation 2544.00 2549.00 7
1981-01-17 Acid Treatment 2544.00 2549.00 0
1981-01-23 Cement Squeeze 2544.00 2549.00 0
1981-02-19 Perforation 2544.00 2549.00 7
1981-02-21 Acid Treatment 2544.00 2546.00 0
1981-02-27 Cement Squeeze 2544.00 2549.00 0
1981-02-27 Packing Device Capped w/Cement 2505.00 2533.00 0
1981-03-02 Perforation 2200.00 2204.00 7
1981-03-02 Perforation 2214.00 2217.00 7
1981-03-07 Acid Treatment 2200.00 2217.00 0
1981-03-10 Fracture 2200.00 2217.00 0
1981-07-24 Packing Device Capped w/Cement 2177.00 2185.00 0
1981-07-26 Perforation 2103.00 2109.00 7
1981-07-31 Cement Squeeze 2103.00 2109.00 0

For data sources see[4]



References