X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0385031803000"

m
m
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0385031803000
 
| Well ID: 0385031803000
| style="height=100%; align=center" rowspan="14" | {{#display_map: 52.262756, -114.421077 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 52.262756, -114.421077 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/03-18-038-03W5/0
 
| Location: 00/03-18-038-03W5/0
Line 10: Line 10:
 
|-
 
|-
 
| Location Alias 2: 00/03-18-038-03 W5/00
 
| Location Alias 2: 00/03-18-038-03 W5/00
 +
|-
 +
| Country: Canada
 
|-
 
|-
 
| Province: Alberta
 
| Province: Alberta
 +
|-
 +
| Township: 038
 +
|-
 +
| Meridian: 5
 +
|-
 +
| Range: 03
 +
|-
 +
| Section: 18
 
|-
 
|-
 
| County/Municipality: [[Red Deer County,_Alberta|Red Deer County]]
 
| County/Municipality: [[Red Deer County,_Alberta|Red Deer County]]
Line 17: Line 27:
 
| Well Name: TEXACO MCCOLL HESPERO A3-18
 
| Well Name: TEXACO MCCOLL HESPERO A3-18
 
|-
 
|-
| Operator Name:  
+
| Operator Name: [[Imperial Oil Resources Limited]]
 
|-
 
|-
 
| License Number: 0009484
 
| License Number: 0009484
Line 29: Line 39:
 
| Final Drill Date: 1955-09-16
 
| Final Drill Date: 1955-09-16
 
|-
 
|-
| Well Total Depth: 2847.4 m
+
| Well Total Depth: 2847.40 m
 
|-
 
|-
 
| Surface Hole Latitude: 52.262756
 
| Surface Hole Latitude: 52.262756
Line 38: Line 48:
 
  | title = General Well Data File - Licensing Data
 
  | title = General Well Data File - Licensing Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref><ref>{{cite web
+
  | accessdate = 2020-05-07 }}</ref><ref>{{cite web
 
  | title = General Well Data File - Drilling Data
 
  | title = General Well Data File - Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1909-09-09
 +
| Well Log Performed
 +
|-
 +
| 1955-05-25
 +
| Obtained License
 +
|-
 +
| 1955-07-25
 +
| Drill Stem Test Performed
 +
|-
 +
| 1955-08-01
 +
| Drill Stem Test Performed
 +
|-
 +
| 1955-08-03
 +
| Drill Stem Test Performed
 +
|-
 +
| 1955-09-07
 +
| Drill Stem Test Performed
 +
|-
 +
| 1955-09-11
 +
| Drill Stem Test Performed
 +
|-
 +
| 1955-09-14
 +
| Drill Stem Test Performed
 +
|-
 +
| 1955-09-16
 +
| Drill Stem Test Performed
 +
|-
 +
| 1955-09-16
 +
| Finished Drilling
 +
|-
 +
| 1955-09-20
 +
| Liner Casing Operation Performed
 +
|-
 +
| 1955-09-23
 +
| Perforation Treatment Performed - Bullet Perforation
 +
|-
 +
| 1955-09-25
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1955-09-28
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1955-09-29
 +
| Perforation Treatment Performed - Bullet Perforation
 +
|-
 +
| 1955-09-29
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1955-10-02
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1955-10-03
 +
| Perforation Treatment Performed - Bullet Perforation
 +
|-
 +
| 1955-10-05
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1955-10-09
 +
| Perforation Treatment Performed - Bullet Perforation
 +
|-
 +
| 1955-10-11
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1955-10-14
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1955-10-18
 +
| Perforation Treatment Performed - Bullet Perforation
 +
|-
 +
| 1955-10-19
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1972-03-23
 +
| Well Began Production
 +
|-
 +
| 1972-03-23
 +
| Well Fluid changed to Gas
 +
|-
 +
| 1972-03-23
 +
| Well Mode changed to Flowing
 +
|-
 +
| 1974-10-21
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 1974-11-03
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1979-06-15
 +
| Well Log Performed
 +
|-
 +
| 1980-01-01
 +
| Well Fluid changed to Gas
 +
|-
 +
| 1980-01-01
 +
| Well Mode changed to Suspended
 +
|-
 +
| 1980-11-20
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1980-11-20
 +
| Well Abandoned
 +
|-
 +
| 1980-11-20
 +
| Well Fluid changed to Gas
 +
|-
 +
| 1980-11-20
 +
| Well Mode changed to Abandoned
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-04-29 }}</ref>
 
<!--== Spud Table ==
 
<!--== Spud Table ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 74: Line 204:
 
| 1955-09-23
 
| 1955-09-23
 
| Bullet Perforation
 
| Bullet Perforation
| style="text-align: right;" | 2280.5
+
| style="text-align: right;" | 2280.50
| style="text-align: right;" | 2283.9
+
| style="text-align: right;" | 2283.90
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1955-10-09
 +
| Bullet Perforation
 +
| style="text-align: right;" | 1727.00
 +
| style="text-align: right;" | 1730.70
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1955-10-11
 +
| Acid Treatment
 +
| style="text-align: right;" | 1723.30
 +
| style="text-align: right;" | 1725.80
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1955-10-14
 +
| Cement Squeeze
 +
| style="text-align: right;" | 1723.30
 +
| style="text-align: right;" | 1730.70
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1955-10-18
 +
| Bullet Perforation
 +
| style="text-align: right;" | 2192.70
 +
| style="text-align: right;" | 2195.80
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 +
|-
 +
| 1974-10-21
 +
| Fracture
 +
| style="text-align: right;" | 2192.70
 +
| style="text-align: right;" | 2195.80
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1974-11-03
 +
| Cement Squeeze
 +
| style="text-align: right;" | 1630.70
 +
| style="text-align: right;" | 1734.90
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1980-11-20
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 2185.00
 +
| style="text-align: right;" | 2185.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1980-11-20
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1620.00
 +
| style="text-align: right;" | 1620.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1955-09-25
 
| 1955-09-25
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 2280.5
+
| style="text-align: right;" | 2280.50
| style="text-align: right;" | 2283.9
+
| style="text-align: right;" | 2283.90
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1955-09-28
 
| 1955-09-28
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 2273.8
+
| style="text-align: right;" | 2273.80
| style="text-align: right;" | 2273.8
+
| style="text-align: right;" | 2273.80
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1955-09-29
 
| 1955-09-29
 
| Bullet Perforation
 
| Bullet Perforation
| style="text-align: right;" | 1751.1
+
| style="text-align: right;" | 1751.10
| style="text-align: right;" | 1752.6
+
| style="text-align: right;" | 1752.60
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1955-09-29
 
| 1955-09-29
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1630.7
+
| style="text-align: right;" | 1630.70
| style="text-align: right;" | 1631.3
+
| style="text-align: right;" | 1631.30
 
| style="text-align: right;" | 26
 
| style="text-align: right;" | 26
 
|-
 
|-
 
| 1955-10-02
 
| 1955-10-02
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 1630.7
+
| style="text-align: right;" | 1630.70
| style="text-align: right;" | 1752.6
+
| style="text-align: right;" | 1752.60
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1955-10-03
 
| 1955-10-03
 
| Bullet Perforation
 
| Bullet Perforation
| style="text-align: right;" | 1734.3
+
| style="text-align: right;" | 1734.30
| style="text-align: right;" | 1734.9
+
| style="text-align: right;" | 1734.90
 
| style="text-align: right;" | 20
 
| style="text-align: right;" | 20
 
|-
 
|-
 
| 1955-10-05
 
| 1955-10-05
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 1734.3
+
| style="text-align: right;" | 1734.30
| style="text-align: right;" | 1734.9
+
| style="text-align: right;" | 1734.90
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1955-10-09
 
| 1955-10-09
 
| Bullet Perforation
 
| Bullet Perforation
| style="text-align: right;" | 1723.3
+
| style="text-align: right;" | 1723.30
| style="text-align: right;" | 1725.8
+
| style="text-align: right;" | 1725.80
| style="text-align: right;" | 13
 
|-
 
| 1955-10-09
 
| Bullet Perforation
 
| style="text-align: right;" | 1727
 
| style="text-align: right;" | 1730.7
 
| style="text-align: right;" | 13
 
|-
 
| 1955-10-11
 
| Acid Treatment
 
| style="text-align: right;" | 1723.3
 
| style="text-align: right;" | 1725.8
 
| style="text-align: right;" | 0
 
|-
 
| 1955-10-14
 
| Cement Squeeze
 
| style="text-align: right;" | 1723.3
 
| style="text-align: right;" | 1730.7
 
| style="text-align: right;" | 0
 
|-
 
| 1955-10-18
 
| Bullet Perforation
 
| style="text-align: right;" | 2192.7
 
| style="text-align: right;" | 2195.8
 
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
|-
 
| 1974-10-21
 
| Fracture
 
| style="text-align: right;" | 2192.7
 
| style="text-align: right;" | 2195.8
 
| style="text-align: right;" | 0
 
|-
 
| 1974-11-03
 
| Cement Squeeze
 
| style="text-align: right;" | 1630.7
 
| style="text-align: right;" | 1734.9
 
| style="text-align: right;" | 0
 
|-
 
| 1980-11-20
 
| Packing Device Capped w/Cement
 
| style="text-align: right;" | 2185
 
| style="text-align: right;" | 2185
 
| style="text-align: right;" | 0
 
|-
 
| 1980-11-20
 
| Packing Device Capped w/Cement
 
| style="text-align: right;" | 1620
 
| style="text-align: right;" | 1620
 
| style="text-align: right;" | 0
 
 
|-
 
|-
 
|}
 
|}
Line 178: Line 308:
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Start Date
+
!scope="col" | Job Number
!scope="col" | End Date
+
!scope="col" | Job Start Date
!scope="col" | Chemical Name
+
!scope="col" | Job End Date
!scope="col" style="text-align: right;" | CAS Number
+
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Purpose
!scope="col" style="text-align: right;" | Job Percentage
+
!scope="col" | Ingredient Name
!scope="col" | Supplier
+
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 
|}-->
 
|}-->
  
Line 211: Line 355:
 
| 1972
 
| 1972
 
| style="text-align: right;" | 5850
 
| style="text-align: right;" | 5850
| style="text-align: right;" | 17232.3
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 34.5
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1973
 
| 1973
 
| style="text-align: right;" | 1290
 
| style="text-align: right;" | 1290
| style="text-align: right;" | 1107.3
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 2.6
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1975
 
| 1975
 
| style="text-align: right;" | 616
 
| style="text-align: right;" | 616
| style="text-align: right;" | 496.2
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 1.1
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1977
 
| 1977
 
| style="text-align: right;" | 530
 
| style="text-align: right;" | 530
| style="text-align: right;" | 42.0
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 0.2
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1978
 
| 1978
 
| style="text-align: right;" | 4216
 
| style="text-align: right;" | 4216
| style="text-align: right;" | 384.5
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 741.1
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
|}
 
|}
Line 243: Line 387:
 
  | title = Well Production Data - All Alberta
 
  | title = Well Production Data - All Alberta
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-04-24
+
| date = 2020-04-25
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Occurences ==
 
<!--== Occurences ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 258: Line 402:
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Alberta]][[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 12:33, 18 January 2021

Well Details

Well ID: 0385031803000
Loading map...
Location: 00/03-18-038-03W5/0
Location Alias: 00/03-18-38-03 W5M
Location Alias 2: 00/03-18-038-03 W5/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 5
Range: 03
Section: 18
County/Municipality: Red Deer County
Well Name: TEXACO MCCOLL HESPERO A3-18
Operator Name: Imperial Oil Resources Limited
License Number: 0009484
License Date: 1955-05-25
License Status: Abandoned
Spud Date: 1955-06-06
Final Drill Date: 1955-09-16
Well Total Depth: 2847.40 m
Surface Hole Latitude: 52.262756
Surface Hole Longitude: -114.421077

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1955-05-25 Obtained License
1955-07-25 Drill Stem Test Performed
1955-08-01 Drill Stem Test Performed
1955-08-03 Drill Stem Test Performed
1955-09-07 Drill Stem Test Performed
1955-09-11 Drill Stem Test Performed
1955-09-14 Drill Stem Test Performed
1955-09-16 Drill Stem Test Performed
1955-09-16 Finished Drilling
1955-09-20 Liner Casing Operation Performed
1955-09-23 Perforation Treatment Performed - Bullet Perforation
1955-09-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1955-09-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1955-09-29 Perforation Treatment Performed - Bullet Perforation
1955-09-29 Perforation Treatment Performed - Jet Perforation
1955-10-02 Perforation Treatment Performed - Cement Squeeze
1955-10-03 Perforation Treatment Performed - Bullet Perforation
1955-10-05 Perforation Treatment Performed - Cement Squeeze
1955-10-09 Perforation Treatment Performed - Bullet Perforation
1955-10-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1955-10-14 Perforation Treatment Performed - Cement Squeeze
1955-10-18 Perforation Treatment Performed - Bullet Perforation
1955-10-19 Well Mode changed to Drilled and Cased
1972-03-23 Well Began Production
1972-03-23 Well Fluid changed to Gas
1972-03-23 Well Mode changed to Flowing
1974-10-21 Perforation Treatment Performed - Fractured
1974-11-03 Perforation Treatment Performed - Cement Squeeze
1979-06-15 Well Log Performed
1980-01-01 Well Fluid changed to Gas
1980-01-01 Well Mode changed to Suspended
1980-11-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-11-20 Well Abandoned
1980-11-20 Well Fluid changed to Gas
1980-11-20 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1955-09-23 Bullet Perforation 2280.50 2283.90 13
1955-10-09 Bullet Perforation 1727.00 1730.70 13
1955-10-11 Acid Treatment 1723.30 1725.80 0
1955-10-14 Cement Squeeze 1723.30 1730.70 0
1955-10-18 Bullet Perforation 2192.70 2195.80 13
1974-10-21 Fracture 2192.70 2195.80 0
1974-11-03 Cement Squeeze 1630.70 1734.90 0
1980-11-20 Packing Device Capped w/Cement 2185.00 2185.00 0
1980-11-20 Packing Device Capped w/Cement 1620.00 1620.00 0
1955-09-25 Acid Treatment 2280.50 2283.90 0
1955-09-28 Packing Device Capped w/Cement 2273.80 2273.80 0
1955-09-29 Bullet Perforation 1751.10 1752.60 13
1955-09-29 Perforation 1630.70 1631.30 26
1955-10-02 Cement Squeeze 1630.70 1752.60 0
1955-10-03 Bullet Perforation 1734.30 1734.90 20
1955-10-05 Cement Squeeze 1734.30 1734.90 0
1955-10-09 Bullet Perforation 1723.30 1725.80 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1972 5850 0.0 0.0 0.0
1973 1290 0.0 0.0 0.0
1975 616 0.0 0.0 0.0
1977 530 0.0 0.0 0.0
1978 4216 0.0 0.0 0.0

For data sources see[5]

References