If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0414223507020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.569825,"lon":-113.058634,"icon":""}]} |
Location: 02/07-35-041-22W4/0 | |
Location Alias: 02/07-35-41-22 W4M | |
Location Alias 2: 02/07-35-041-22 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 041 | |
Meridian: 4 | |
Range: 22 | |
Section: 35 | |
County/Municipality: Camrose County | |
Well Name: EMBER 102 BASHAW 7-35-41-22 | |
Operator Name: Ember Resources Inc. | |
License Number: 0421410 | |
License Date: 2010-06-25 | |
License Status: Issued | |
Spud Date: 2010-11-14 | |
Final Drill Date: 2010-11-21 | |
Well Total Depth: 688.00 m | |
Surface Hole Latitude: 52.569825 | |
Surface Hole Longitude: -113.058634 |
Date | Event |
---|---|
2010-06-25 | Obtained License |
2010-11-15 | Surface Casing Operation Performed |
2010-11-21 | Finished Drilling |
2010-11-21 | Production Casing Operation Performed |
2010-11-21 | Rig Released |
2010-11-21 | Well Mode changed to Drilled and Cased |
2010-11-28 | Well Log Performed |
2010-12-14 | Perforation Treatment Performed - Jet Perforation |
2010-12-14 | Well Fluid changed to Gas |
2010-12-14 | Well Mode changed to Testing |
2010-12-22 | Well Began Production |
2010-12-22 | Well Fluid changed to Gas |
2010-12-22 | Well Mode changed to Flowing |
2011-01-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2011-01-04 | Plug Back Performed |
2011-01-04 | Well Fluid changed to Gas |
2011-01-04 | Well Mode changed to Abandoned Zone |
2011-01-25 | Perforation Treatment Performed - Jet Perforation |
2011-01-27 | Perforation Treatment Performed - Fractured |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-12-14 | Perforation | 660.00 | 663.00 | 13 |
2011-01-25 | Perforation | 195.50 | 197.00 | 13 |
2011-01-25 | Perforation | 222.50 | 225.00 | 13 |
2011-01-25 | Perforation | 210.50 | 212.00 | 13 |
2011-01-25 | Perforation | 203.00 | 205.00 | 13 |
2011-01-25 | Perforation | 186.90 | 187.90 | 13 |
2011-01-25 | Perforation | 184.50 | 186.00 | 13 |
2011-01-25 | Perforation | 309.50 | 311.50 | 13 |
2011-01-25 | Perforation | 352.50 | 354.00 | 13 |
2011-01-25 | Perforation | 339.50 | 341.00 | 13 |
2011-01-25 | Perforation | 334.50 | 335.50 | 13 |
2010-12-14 | Perforation | 660.00 | 663.00 | 13 |
2011-01-25 | Perforation | 426.90 | 427.90 | 13 |
2011-01-25 | Perforation | 394.00 | 398.00 | 13 |
2011-01-25 | Perforation | 358.90 | 359.90 | 13 |
2011-01-25 | Perforation | 302.50 | 305.50 | 13 |
2011-01-25 | Perforation | 305.50 | 308.00 | 13 |
2011-01-25 | Perforation | 268.20 | 269.20 | 13 |
2011-01-25 | Perforation | 277.50 | 279.00 | 13 |
2011-01-25 | Perforation | 322.80 | 324.30 | 13 |
2011-01-25 | Perforation | 308.50 | 309.50 | 13 |
2011-01-27 | Fracture | 203.00 | 311.50 | 0 |
2011-01-04 | Packing Device Capped w/Cement | 647.00 | 655.00 | 0 |
2011-01-27 | Fracture | 352.50 | 359.90 | 0 |
2011-01-27 | Fracture | 238.00 | 341.00 | 0 |
2011-01-25 | Perforation | 253.70 | 256.20 | 13 |
2011-01-25 | Perforation | 241.50 | 242.50 | 13 |
2011-01-25 | Perforation | 238.00 | 240.50 | 13 |
2011-01-25 | Perforation | 264.20 | 265.20 | 13 |
2011-01-25 | Perforation | 260.50 | 262.00 | 13 |
2011-01-25 | Perforation | 258.50 | 260.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 192 | 0.0 | 0.0 | 0.0 |
For data sources see[5]