X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0425043215000

Well Details

Well ID: 0425043215000
Loading map...
Location: 00/15-32-042-04W5/0
Location Alias: 00/15-32-42-04 W5M
Location Alias 2: 00/15-32-042-04 W5/00
Province: Alberta
County/Municipality: Ponoka County
Well Name: GEAR HZ PEMBINA 15-32-42-4
Operator Name: Gear Energy Ltd.
License Number: 0482581
License Date: 2017-01-25
License Status: Issued
Spud Date: 2017-02-14
Final Drill Date: 2017-02-22
Well Total Depth: 2862 m
Surface Hole Latitude: 52.652145
Surface Hole Longitude: -114.54078

For data sources see[1][2]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
14 Feb 2017 Bonanza Drilling Inc. 6 N/A Drill To LD

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2017-02-17 1032
2017-02-18 1428 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-03-20 Multi-Stage Fracture 2809.6 2810.7 0
2017-03-20 Multi-Stage Fracture 2648 2648.3 0
2017-03-21 Multi-Stage Fracture 2586 2586.3 0
2017-03-21 Multi-Stage Fracture 2529 2529.3 0
2017-03-21 Multi-Stage Fracture 2472 2472.3 0
2017-03-21 Multi-Stage Fracture 2415 2415.3 0
2017-03-21 Multi-Stage Fracture 2345 2345.3 0
2017-03-21 Multi-Stage Fracture 2283 2283.3 0
2017-03-21 Multi-Stage Fracture 2222 2222.3 0
2017-03-21 Multi-Stage Fracture 2156 2156.3 0
2017-03-21 Multi-Stage Fracture 2097 2097.3 0
2017-03-21 Multi-Stage Fracture 2044 2044.3 0
2017-03-21 Multi-Stage Fracture 1980 1980.3 0
2017-03-21 Multi-Stage Fracture 1923 1923.3 0
2017-03-21 Multi-Stage Fracture 1858 1858.3 0
2017-03-21 Multi-Stage Fracture 1800 1800.3 0
2017-03-21 Multi-Stage Fracture 1737 1737.3 0
2017-03-22 Multi-Stage Fracture 1678 1678.3 0
2017-03-22 Multi-Stage Fracture 1613 1613.3 0
2017-03-22 Multi-Stage Fracture 1555 1555.3 0
2017-03-22 Multi-Stage Fracture 1495 1495.3 0

For data sources see[5]

Fracking Activities

Start Date End Date Chemical Name CAS Number Purpose Job Percentage Supplier
03/20/2017 03/22/2017 Petroleum distillates 64742-47-8 Friction Reducer 0.2213 BJ Services
2-Propyn-1-ol. compd w methyloxirane 38172-91-7 Corrosion Inhibitor 0.0064 BJ Services
Sulphuric acid 7664-93-9 Demulsifier 0.0054 BJ Services
Sulphonic acid. alkyl aryl derivative 147732-59-0 Demulsifier 0.0013 BJ Services
Sulphuric acid 7664-93-9 Demulsifier 0.0013 BJ Services
Methanol 67-56-1 Bactericide/Biocide 0.0332 BJ Services
Water 7732-18-5 Bactericide/Biocide 0.0332 BJ Services
Sodium persulphate 7775-27-1 Breaker 0.0092 BJ Services
Choline chloride 67-48-1 Clay Control 0.1412 BJ Services
Complex polyamine salt 138879-94-4 Clay Control 0.1412 BJ Services
Non-hazardous Not Available Clay Control 0.1412 BJ Services
Water 7732-18-5 Clay Control 0.1412 BJ Services
Methanol 67-56-1 Corrosion Inhibitor 0.0051 BJ Services
Non-hazardous Not Available Corrosion Inhibitor 0.0051 BJ Services
Potassium iodide 7681-11-0 Corrosion Inhibitor 0.0051 BJ Services
2-Propyn-1-ol. compd w methyloxirane 38172-91-7 Corrosion Inhibitor 0.0064 BJ Services
Non-hazardous Not Available Corrosion Inhibitor 0.0064 BJ Services
Propargyl alcohol 107-19-7 Corrosion Inhibitor 0.0064 BJ Services
Methylcellulose 9004-67-5 Defoamer 0.0001 BJ Services
Non-hazardous Not Available Defoamer 0.0001 BJ Services
Octamethylcyclotetrasiloxane 556-67-2 Defoamer 0.0001 BJ Services
Polydimethylsiloxane 63148-62-9 Defoamer 0.0001 BJ Services
Water 7732-18-5 Defoamer 0.0001 BJ Services
Alkyl benzene sulphonic acid 27176-87-0 Demulsifier 0.0054 BJ Services
Methanol 67-56-1 Demulsifier 0.0054 BJ Services
Sulphonic acid. alkyl aryl derivative 147732-59-0 Demulsifier 0.0054 BJ Services
Sulphuric acid 7664-93-9 Demulsifier 0.0054 BJ Services
Ethoxylated alcohol. branched 78330-19-5 Demulsifier 0.053 BJ Services
Isopropanol 67-63-0 Demulsifier 0.053 BJ Services
Methanol 67-56-1 Demulsifier 0.053 BJ Services
Methanol 67-56-1 Demulsifier 0.0013 BJ Services
Sulphonic acid. alkyl aryl derivative 147732-59-0 Demulsifier 0.0013 BJ Services
Sulphuric acid 7664-93-9 Demulsifier 0.0013 BJ Services
Nitrogen 7727-37-9 Energizing Fluid 12.477 BJ Services
Non-hazardous 9014 Friction Reducer 0.2213 BJ Services
Oxyalkylated alcohol 9014 Friction Reducer 0.2213 BJ Services
Petroleum distillates 64742-47-8 Friction Reducer 0.2213 BJ Services
Polyacrylate 9014 Friction Reducer 0.2213 BJ Services
Sodium hypophosphite 10039-56-2 Iron Control 0.0271 BJ Services
Cupric sulphate. pentahydrate 7758-99-8 Iron Control 0.0016 BJ Services
1-Butoxy-2-propanol 5131-66-8 Surfactant 0.0865 BJ Services
Diethanolamine 111-42-2 Surfactant 0.0865 BJ Services
Ethanol 64-17-5 Surfactant 0.0865 BJ Services
Methanol 67-56-1 Surfactant 0.0865 BJ Services
Polyoxyalkylene sulfate 68891-29-2 Surfactant 0.0865 BJ Services

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
3/16/2017 3/16/2017 0:00 Surface Water - Runoff 863

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 5443 1232.4 0.0 2816.8
2018 7132 985.3 0.0 3229.3
2019 1851 102.1 0.0 387.6

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-02-23 No Incident N/A N/A
2017-03-22 No Incident N/A N/A

For data sources see[9]

References