If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0696092716000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.02682,"lon":-119.299238,"icon":""}]} |
Location: 00/16-27-069-09W6/0 | |
Location Alias: 00/16-27-69-09 W6M | |
Location Alias 2: 00/16-27-069-09 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 069 | |
Meridian: 6 | |
Range: 09 | |
Section: 27 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: SINOPEC A ELM 16-27-69-9 | |
Operator Name: Sinopec Daylight Energy Ltd. | |
License Number: 0489341 | |
License Date: 2018-05-31 | |
License Status: Issued | |
Spud Date: 2018-07-15 | |
Final Drill Date: 2018-08-09 | |
Well Total Depth: 5270.00 m | |
Surface Hole Latitude: 55.026820 | |
Surface Hole Longitude: -119.299238 |
Date | Event |
---|---|
2018-05-31 | Obtained License |
2018-07-16 | Surface Casing Operation Performed |
2018-07-22 | Direction Drilling Operation Performed - Deviate |
2018-07-26 | Intermediate Casing Operation Performed |
2018-07-27 | Direction Drilling Operation Performed - Horizontal |
2018-07-30 | Well Log Performed |
2018-08-09 | Finished Drilling |
2018-08-09 | Well Log Performed |
2018-08-09 | Well Mode changed to Drilled and Cased |
2018-08-13 | Liner Casing Operation Performed |
2018-08-14 | Perforation Treatment Performed - Open-Hole Completion |
2018-08-14 | Rig Released |
2018-12-12 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-12-13 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-12-14 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-01-03 | Well Fluid changed to Gas |
2019-01-03 | Well Mode changed to Testing |
2019-02-01 | Well Fluid changed to Gas |
2019-02-01 | Well Mode changed to Test Completed |
2019-08-19 | Well Began Production |
2019-08-19 | Well Fluid changed to Gas |
2019-08-19 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2018-07-15 | Trinidad Drilling Ltd. | 449 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2018-07-22 | 2338.50 | Deviate (5 - 79 degrees) |
2018-07-27 | 2785.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2018-08-14 | Open Hole/Barefoot Completion | 5253.00 | 5270.00 | 0 |
2018-12-12 | Multi-Stage Fracture | 4848.00 | 4848.10 | 0 |
2018-12-12 | Multi-Stage Fracture | 4800.90 | 4801.00 | 0 |
2018-12-12 | Multi-Stage Fracture | 4754.20 | 4754.30 | 0 |
2018-12-12 | Multi-Stage Fracture | 4707.20 | 4707.30 | 0 |
2018-12-12 | Multi-Stage Fracture | 4660.10 | 4660.20 | 0 |
2018-12-12 | Multi-Stage Fracture | 4612.70 | 4612.80 | 0 |
2018-12-13 | Multi-Stage Fracture | 4565.40 | 4565.50 | 0 |
2018-12-13 | Multi-Stage Fracture | 4518.40 | 4518.50 | 0 |
2018-12-13 | Multi-Stage Fracture | 4471.30 | 4471.40 | 0 |
2018-12-13 | Multi-Stage Fracture | 4424.20 | 4424.30 | 0 |
2018-12-12 | Multi-Stage Fracture | 5232.90 | 5233.00 | 0 |
2018-12-13 | Multi-Stage Fracture | 4377.30 | 4377.40 | 0 |
2018-12-13 | Multi-Stage Fracture | 4330.40 | 4330.50 | 0 |
2018-12-13 | Multi-Stage Fracture | 4283.10 | 4283.20 | 0 |
2018-12-13 | Multi-Stage Fracture | 4235.90 | 4236.00 | 0 |
2018-12-13 | Multi-Stage Fracture | 4189.10 | 4189.20 | 0 |
2018-12-13 | Multi-Stage Fracture | 4139.50 | 4139.60 | 0 |
2018-12-13 | Multi-Stage Fracture | 4088.90 | 4089.00 | 0 |
2018-12-13 | Multi-Stage Fracture | 4038.30 | 4038.40 | 0 |
2018-12-13 | Multi-Stage Fracture | 3987.70 | 3987.80 | 0 |
2018-12-13 | Multi-Stage Fracture | 3937.00 | 3937.10 | 0 |
2018-12-12 | Multi-Stage Fracture | 5178.70 | 5178.80 | 0 |
2018-12-13 | Multi-Stage Fracture | 3886.40 | 3886.50 | 0 |
2018-12-13 | Multi-Stage Fracture | 3835.80 | 3835.90 | 0 |
2018-12-13 | Multi-Stage Fracture | 3785.20 | 3785.30 | 0 |
2018-12-13 | Multi-Stage Fracture | 3735.90 | 3736.00 | 0 |
2018-12-13 | Multi-Stage Fracture | 3685.20 | 3685.30 | 0 |
2018-12-13 | Multi-Stage Fracture | 3635.60 | 3635.70 | 0 |
2018-12-13 | Multi-Stage Fracture | 3587.50 | 3587.60 | 0 |
2018-12-14 | Multi-Stage Fracture | 3539.40 | 3539.50 | 0 |
2018-12-14 | Multi-Stage Fracture | 3488.70 | 3488.80 | 0 |
2018-12-14 | Multi-Stage Fracture | 3438.70 | 3438.80 | 0 |
2018-12-12 | Multi-Stage Fracture | 5131.60 | 5131.70 | 0 |
2018-12-14 | Multi-Stage Fracture | 3388.10 | 3388.20 | 0 |
2018-12-14 | Multi-Stage Fracture | 3339.10 | 3339.20 | 0 |
2018-12-14 | Multi-Stage Fracture | 3288.40 | 3288.50 | 0 |
2018-12-14 | Multi-Stage Fracture | 3237.70 | 3237.80 | 0 |
2018-12-14 | Multi-Stage Fracture | 3187.10 | 3187.20 | 0 |
2018-12-14 | Multi-Stage Fracture | 3136.40 | 3136.50 | 0 |
2018-12-14 | Multi-Stage Fracture | 3085.70 | 3085.80 | 0 |
2018-12-14 | Multi-Stage Fracture | 3035.00 | 3035.10 | 0 |
2018-12-14 | Multi-Stage Fracture | 2984.40 | 2984.50 | 0 |
2018-12-14 | Multi-Stage Fracture | 2933.70 | 2933.80 | 0 |
2018-12-12 | Multi-Stage Fracture | 5083.90 | 5084.00 | 0 |
2018-12-14 | Multi-Stage Fracture | 2883.50 | 2883.60 | 0 |
2018-12-14 | Multi-Stage Fracture | 2832.80 | 2832.90 | 0 |
2018-12-14 | Multi-Stage Fracture | 2782.60 | 2782.70 | 0 |
2018-12-12 | Multi-Stage Fracture | 5036.80 | 5036.90 | 0 |
2018-12-12 | Multi-Stage Fracture | 4989.70 | 4989.80 | 0 |
2018-12-12 | Multi-Stage Fracture | 4942.60 | 4942.70 | 0 |
2018-12-12 | Multi-Stage Fracture | 4895.00 | 4895.10 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2018-12-12 | 2018-12-14 | 2,654 | 19,922 | N/A |
2 | 2018-12-12 | 2018-12-12 | 2,654 | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | 7732-18-5 | 100 | 86.6853 | N/A | |||
30/50 Import Sand | Step Energy Services | Crystalline Silica | 14808-60-7 | 100 | 11.0514 | N/A | ||
40/70 Import Sand | Step Energy Services | Crystalline Silica | 14808-60-7 | 100 | 2.2104 | N/A | ||
Secure BIO-10B (Biocide) | Step Energy Services | Bactericide/Biocide | 2-bromo-2-nitro.3-diol | 52-51-7 | 100 | 0.0088 | N/A | |
Methyl Alcohol | 67-56-1 | 100 | 0.0088 | N/A | ||||
Non-Hazardous Ingredients | Not Available | 100 | 0.0088 | N/A | ||||
SCS-1 (Clay Control) | Step Energy Services | Clay Control | Choline chloride | 67-48-1 | 100 | 0.1301 | N/A | |
Non-Hazardous Ingredients | Not Available | 100 | 0.1301 | N/A | ||||
SFR-106 (Friction Reducer) | Step Energy Services | Friction Reducer | Ethoxylated Alcohol | 78330-21-9 | 100 | 0.0869 | N/A | |
Non-Hazardous Ingredients | Not Available | 100 | 0.0869 | N/A | ||||
Petroleum distillates. hydrotreated light | 64742-47-8 | 100 | 0.0869 | N/A | ||||
SNE-2 (Non-Emulsifier) | Step Energy Services | Surfactant | 2-Ethylhexanol distillation residue | 68609-68-7 | 100 | 0.0852 | N/A | |
Dodecylbenzene Sulfonic Acid | 27176-87-0 | 100 | 0.0852 | N/A | ||||
Methanol | 67-56-1 | 100 | 0.0852 | N/A | ||||
Monoethanolamine | 141-43-5 | 100 | 0.0852 | N/A | ||||
Oxirane. methyl-. polymer | 11/6/9003 | 100 | 0.0852 | N/A | ||||
Poly(oxy-1.2-ethanediyl). alphaisotridecyl-omega-hydroxy- | 9043-30-5 | 100 | 0.0852 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0852 | N/A | ||||
2 | SNE-3 (Non-Emulsifier) | Step Energy Services | Demulsifier | Isopropyl Alcohol | 67-63-0 | 100 | 0.0828 | N/A |
Methyl Alcohol | 67-56-1 | 100 | 0.0828 | N/A | ||||
Non-Hazardous Ingredients | Not Available | 100 | 0.0828 | N/A | ||||
Oxydi-2.1-ethyldiyl)bis(cocoalkyl)dimethyl ammonium dichloride |
68607-28-3 | 100 | 0.0828 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2018-12-11 | 2018-12-14 | Surface Water - Runoff | 14208 |
2018-12-12 | 2018-12-13 | Surface Water - Runoff | 6424 |
2018-12-14 | 2018-12-14 | Surface Water - Runoff | 1127 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2019 | 2698 | 0.0 | 0.0 | 0.0 |
2020 | 754 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-08-14 | No Incident Encountered | 0.00 | 0.00 |
2018-12-16 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]