X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0696092716000

Well Details

Well ID: 0696092716000
Loading map...
Location: 00/16-27-069-09W6/0
Location Alias: 00/16-27-69-09 W6M
Location Alias 2: 00/16-27-069-09 W6/00
Country: Canada
Province: Alberta
Township: 069
Meridian: 6
Range: 09
Section: 27
County/Municipality: Municipal District of Greenview No. 16
Well Name: SINOPEC A ELM 16-27-69-9
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0489341
License Date: 2018-05-31
License Status: Issued
Spud Date: 2018-07-15
Final Drill Date: 2018-08-09
Well Total Depth: 5270.00 m
Surface Hole Latitude: 55.026820
Surface Hole Longitude: -119.299238

For data sources see[1][2]

Well History

Date Event
2018-05-31 Obtained License
2018-07-16 Surface Casing Operation Performed
2018-07-22 Direction Drilling Operation Performed - Deviate
2018-07-26 Intermediate Casing Operation Performed
2018-07-27 Direction Drilling Operation Performed - Horizontal
2018-07-30 Well Log Performed
2018-08-09 Finished Drilling
2018-08-09 Well Log Performed
2018-08-09 Well Mode changed to Drilled and Cased
2018-08-13 Liner Casing Operation Performed
2018-08-14 Perforation Treatment Performed - Open-Hole Completion
2018-08-14 Rig Released
2018-12-12 Perforation Treatment Performed - Multi-Stage Fracture
2018-12-13 Perforation Treatment Performed - Multi-Stage Fracture
2018-12-14 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-03 Well Fluid changed to Gas
2019-01-03 Well Mode changed to Testing
2019-02-01 Well Fluid changed to Gas
2019-02-01 Well Mode changed to Test Completed
2019-08-19 Well Began Production
2019-08-19 Well Fluid changed to Gas
2019-08-19 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-07-15 Trinidad Drilling Ltd. 449 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-07-22 2338.50 Deviate (5 - 79 degrees)
2018-07-27 2785.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-08-14 Open Hole/Barefoot Completion 5253.00 5270.00 0
2018-12-12 Multi-Stage Fracture 4848.00 4848.10 0
2018-12-12 Multi-Stage Fracture 4800.90 4801.00 0
2018-12-12 Multi-Stage Fracture 4754.20 4754.30 0
2018-12-12 Multi-Stage Fracture 4707.20 4707.30 0
2018-12-12 Multi-Stage Fracture 4660.10 4660.20 0
2018-12-12 Multi-Stage Fracture 4612.70 4612.80 0
2018-12-13 Multi-Stage Fracture 4565.40 4565.50 0
2018-12-13 Multi-Stage Fracture 4518.40 4518.50 0
2018-12-13 Multi-Stage Fracture 4471.30 4471.40 0
2018-12-13 Multi-Stage Fracture 4424.20 4424.30 0
2018-12-12 Multi-Stage Fracture 5232.90 5233.00 0
2018-12-13 Multi-Stage Fracture 4377.30 4377.40 0
2018-12-13 Multi-Stage Fracture 4330.40 4330.50 0
2018-12-13 Multi-Stage Fracture 4283.10 4283.20 0
2018-12-13 Multi-Stage Fracture 4235.90 4236.00 0
2018-12-13 Multi-Stage Fracture 4189.10 4189.20 0
2018-12-13 Multi-Stage Fracture 4139.50 4139.60 0
2018-12-13 Multi-Stage Fracture 4088.90 4089.00 0
2018-12-13 Multi-Stage Fracture 4038.30 4038.40 0
2018-12-13 Multi-Stage Fracture 3987.70 3987.80 0
2018-12-13 Multi-Stage Fracture 3937.00 3937.10 0
2018-12-12 Multi-Stage Fracture 5178.70 5178.80 0
2018-12-13 Multi-Stage Fracture 3886.40 3886.50 0
2018-12-13 Multi-Stage Fracture 3835.80 3835.90 0
2018-12-13 Multi-Stage Fracture 3785.20 3785.30 0
2018-12-13 Multi-Stage Fracture 3735.90 3736.00 0
2018-12-13 Multi-Stage Fracture 3685.20 3685.30 0
2018-12-13 Multi-Stage Fracture 3635.60 3635.70 0
2018-12-13 Multi-Stage Fracture 3587.50 3587.60 0
2018-12-14 Multi-Stage Fracture 3539.40 3539.50 0
2018-12-14 Multi-Stage Fracture 3488.70 3488.80 0
2018-12-14 Multi-Stage Fracture 3438.70 3438.80 0
2018-12-12 Multi-Stage Fracture 5131.60 5131.70 0
2018-12-14 Multi-Stage Fracture 3388.10 3388.20 0
2018-12-14 Multi-Stage Fracture 3339.10 3339.20 0
2018-12-14 Multi-Stage Fracture 3288.40 3288.50 0
2018-12-14 Multi-Stage Fracture 3237.70 3237.80 0
2018-12-14 Multi-Stage Fracture 3187.10 3187.20 0
2018-12-14 Multi-Stage Fracture 3136.40 3136.50 0
2018-12-14 Multi-Stage Fracture 3085.70 3085.80 0
2018-12-14 Multi-Stage Fracture 3035.00 3035.10 0
2018-12-14 Multi-Stage Fracture 2984.40 2984.50 0
2018-12-14 Multi-Stage Fracture 2933.70 2933.80 0
2018-12-12 Multi-Stage Fracture 5083.90 5084.00 0
2018-12-14 Multi-Stage Fracture 2883.50 2883.60 0
2018-12-14 Multi-Stage Fracture 2832.80 2832.90 0
2018-12-14 Multi-Stage Fracture 2782.60 2782.70 0
2018-12-12 Multi-Stage Fracture 5036.80 5036.90 0
2018-12-12 Multi-Stage Fracture 4989.70 4989.80 0
2018-12-12 Multi-Stage Fracture 4942.60 4942.70 0
2018-12-12 Multi-Stage Fracture 4895.00 4895.10 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-12-12 2018-12-14 2,654 19,922 N/A
2 2018-12-12 2018-12-12 2,654 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 86.6853 N/A
30/50 Import Sand Step Energy Services Crystalline Silica 14808-60-7 100 11.0514 N/A
40/70 Import Sand Step Energy Services Crystalline Silica 14808-60-7 100 2.2104 N/A
Secure BIO-10B (Biocide) Step Energy Services Bactericide/Biocide 2-bromo-2-nitro.3-diol 52-51-7 100 0.0088 N/A
Methyl Alcohol 67-56-1 100 0.0088 N/A
Non-Hazardous Ingredients Not Available 100 0.0088 N/A
SCS-1 (Clay Control) Step Energy Services Clay Control Choline chloride 67-48-1 100 0.1301 N/A
Non-Hazardous Ingredients Not Available 100 0.1301 N/A
SFR-106 (Friction Reducer) Step Energy Services Friction Reducer Ethoxylated Alcohol 78330-21-9 100 0.0869 N/A
Non-Hazardous Ingredients Not Available 100 0.0869 N/A
Petroleum distillates. hydrotreated light 64742-47-8 100 0.0869 N/A
SNE-2 (Non-Emulsifier) Step Energy Services Surfactant 2-Ethylhexanol distillation residue 68609-68-7 100 0.0852 N/A
Dodecylbenzene Sulfonic Acid 27176-87-0 100 0.0852 N/A
Methanol 67-56-1 100 0.0852 N/A
Monoethanolamine 141-43-5 100 0.0852 N/A
Oxirane. methyl-. polymer 11/6/9003 100 0.0852 N/A
Poly(oxy-1.2-ethanediyl). alphaisotridecyl-omega-hydroxy- 9043-30-5 100 0.0852 N/A
Water 7732-18-5 100 0.0852 N/A
2 SNE-3 (Non-Emulsifier) Step Energy Services Demulsifier Isopropyl Alcohol 67-63-0 100 0.0828 N/A
Methyl Alcohol 67-56-1 100 0.0828 N/A
Non-Hazardous Ingredients Not Available 100 0.0828 N/A
Oxydi-2.1-ethyldiyl)bis(cocoalkyl)dimethyl
ammonium dichloride
68607-28-3 100 0.0828 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-12-11 2018-12-14 Surface Water - Runoff 14208
2018-12-12 2018-12-13 Surface Water - Runoff 6424
2018-12-14 2018-12-14 Surface Water - Runoff 1127

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 2698 0.0 0.0 0.0
2020 754 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-08-14 No Incident Encountered 0.00 0.00
2018-12-16 No Incident Encountered 0.00 0.00

For data sources see[10]

References