X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-015-21110

Well Details

Well ID: 37-015-21110
Loading map...
County: Bradford
Municipality: Rome Township
Operator Name: CHESAPEAKE APPALACHIA LLC
Well Pad ID: 148608
Farm/Lease Name: JACOBS 2H
First Permit Date: 2010-08-12
Last Permit Date: 2010-08-12
Spud Date: 2010-10-01
Unconventional: Yes
Horizontal: Yes
Well Status: ACTIVE
Violations: 0
Latitude: 41.878636
Longitude: -76.347675

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2010-2 0.0 0.0 0.0 0.0 0.0 0.0
2010-2 0.0 0.0 0.0 0.0 0.0 0.0
2011-1 0.0 0.0 0.0 0.0 0.0 0.0
2011-2 0.0 0.0 0.0 0.0 0.0 0.0
2012-1 142233.0 26.0 0.0 0.0 0.0 0.0
2012-2 554906.0 182.0 0.0 0.0 0.0 0.0
2013-1 259870.0 181.0 0.0 0.0 0.0 0.0
2013-2 188574.0 181.0 0.0 0.0 0.0 0.0
2014-1 172548.0 176.0 0.0 0.0 0.0 0.0
2014-2 171088.0 178.0 0.0 0.0 0.0 0.0
2015-02 21105.0 28.0 0.0 0.0 0.0 0.0
2015-01 12072.0 29.0 0.0 0.0 0.0 0.0
2015-03 9778.0 22.0 0.0 0.0 0.0 0.0

For data sources see[1]

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2011-1 FRACING FLUID WASTE 919.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119 EUREKA RESOURCES LLC WILLIAMSPORT WATER TREATMENT WILLIAMSPORT PA
2012-1 PRODUCED FLUID 1.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR HYDRAULIC FRACTURING
2012-2 PRODUCED FLUID 329.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119 EUREKA RESOURCES LLC WILLIAMSPORT WATER TREATMENT WILLIAMSPORT PA
2012-2 PRODUCED FLUID 5.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR HYDRAULIC FRACTURING
2013-1 PRODUCED FLUID 1.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR HYDRAULIC FRACTURING
2013-2 FRACING FLUID WASTE 10.0 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC008 SHARER TEMP CENTRALIZED FLUIDS PROCESSING FACILITY PA
2013-2 PRODUCED FLUID 874.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2014-1 PRODUCED FLUID 622.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2014-2 PRODUCED FLUID 291.55 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY

For data sources see[2]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
1930392 2010-11-12 No Violations Noted Foolwup of excess rainwater/fluids (mud) on location. All liquids contained - liquids sucked up, disposed of and pad excavataed. Stone currently being layed down.
1932455 2010-12-02 No Violations Noted rig just moved off of location. Currently cleaning location. Pulling mats and liner. Excessive rainwater on location. Need to revisit after location cleaned up.
2203339 2013-09-04 No Violations Noted

For data sources see[3]

References