If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0014083310000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.081231,"lon":-111.013344,"icon":""}]} |
Location: 00/10-33-001-08W4/0 | |
Location Alias: 00/10-33-01-08 W4M | |
Location Alias 2: 00/10-33-001-08 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 001 | |
Meridian: 4 | |
Range: 08 | |
Section: 33 | |
County/Municipality: County of Forty Mile No. 8 | |
Well Name: PINE CLIFF COMREY 10-33-1-8 | |
Operator Name: Pine Cliff Energy Ltd. | |
License Number: 0271972 | |
License Date: 2002-07-22 | |
License Status: Issued | |
Spud Date: 2002-07-23 | |
Final Drill Date: 2002-07-24 | |
Well Total Depth: 699.00 m | |
Surface Hole Latitude: 49.081231 | |
Surface Hole Longitude: -111.013344 |
Date | Event |
---|---|
2002-07-22 | Obtained License |
2002-07-23 | Surface Casing Operation Performed |
2002-07-24 | Finished Drilling |
2002-07-24 | Production Casing Operation Performed |
2002-07-24 | Rig Released |
2002-07-24 | Well Mode changed to Drilled and Cased |
2002-08-28 | Well Log Performed |
2002-09-12 | Perforation Treatment Performed - Jet Perforation |
2002-09-25 | Perforation Treatment Performed - Fractured |
2002-12-01 | Well Began Production |
2002-12-01 | Well Fluid changed to Gas |
2002-12-01 | Well Mode changed to Flowing |
2011-08-09 | Perforation Treatment Performed - Jet Perforation |
2011-08-11 | Well Fluid changed to Gas |
2011-08-11 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2002-09-12 | Perforation | 578.00 | 581.00 | 13 |
2002-09-12 | Perforation | 573.00 | 576.00 | 13 |
2002-09-25 | Fracture | 573.00 | 581.00 | 0 |
2011-08-09 | Perforation | 671.20 | 672.20 | 17 |
2011-08-09 | Perforation | 664.00 | 665.00 | 17 |
2011-08-09 | Perforation | 660.00 | 661.00 | 17 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2002 | 744 | 0.0 | 0.0 | 0.0 |
2003 | 3622 | 0.0 | 0.0 | 0.0 |
2004 | 8705 | 0.0 | 0.0 | 0.0 |
2005 | 7989 | 0.0 | 0.0 | 0.0 |
2006 | 8367 | 0.0 | 0.0 | 0.0 |
2007 | 8629 | 0.0 | 0.0 | 0.0 |
2008 | 8759 | 0.0 | 0.0 | 0.0 |
2009 | 8371 | 0.0 | 0.0 | 0.0 |
2010 | 6047 | 0.0 | 0.0 | 0.0 |
2011 | 8500 | 0.0 | 0.0 | 0.0 |
2012 | 8783 | 0.0 | 0.0 | 0.0 |
2013 | 8027 | 0.0 | 0.0 | 0.0 |
2014 | 7244 | 0.0 | 0.0 | 0.0 |
2015 | 8759 | 0.0 | 0.0 | 0.0 |
2016 | 8783 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8639 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]