If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0024072703005 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.144941,"lon":-110.869106,"icon":""}]} |
Location: 00/03-27-002-07W4/5 | |
Location Alias: 00/03-27-02-07 W4M | |
Location Alias 2: 00/03-27-002-07 W4/05 | |
Country: Canada | |
Province: Alberta | |
Township: 002 | |
Meridian: 4 | |
Range: 07 | |
Section: 27 | |
County/Municipality: County of Forty Mile No. 8 | |
Well Name: PINE CLIFF PENDOR 3-27-2-7 | |
Operator Name: Pine Cliff Energy Ltd. | |
License Number: 0411937 | |
License Date: 2009-08-21 | |
License Status: Suspension | |
Spud Date: 2009-08-23 | |
Final Drill Date: 2009-08-25 | |
Well Total Depth: 991.00 m | |
Surface Hole Latitude: 49.144941 | |
Surface Hole Longitude: -110.869106 |
Date | Event |
---|---|
2009-08-21 | Obtained License |
2009-08-24 | Direction Drilling Operation Performed - Deviate |
2009-08-24 | Surface Casing Operation Performed |
2009-08-25 | Finished Drilling |
2009-08-25 | Production Casing Operation Performed |
2009-08-25 | Well Log Performed |
2009-08-25 | Well Mode changed to Drilled and Cased |
2009-08-26 | Rig Released |
2009-09-15 | Perforation Treatment Performed - Jet Perforation |
2009-09-15 | Well Log Performed |
2009-09-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2009-09-25 | Perforation Treatment Performed - Jet Perforation |
2009-09-25 | Plug Back Performed |
2009-10-22 | Perforation Treatment Performed - Jet Perforation |
2009-11-02 | Perforation Treatment Performed - Jet Perforation |
2009-11-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2009-11-08 | Perforation Treatment Performed - Jet Perforation |
2009-11-08 | Plug Back Performed |
2009-11-12 | Perforation Treatment Performed - Jet Perforation |
2009-12-13 | Well Log Performed |
2010-01-06 | Perforation Treatment Performed - Jet Perforation |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2009-08-24 | 145.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2009-09-15 | Perforation | 943.00 | 946.00 | 23 |
2009-11-12 | Perforation | 395.00 | 400.00 | 13 |
2009-11-12 | Perforation | 358.50 | 361.00 | 13 |
2010-01-06 | Perforation | 217.00 | 218.00 | 13 |
2010-01-06 | Perforation | 213.00 | 214.00 | 13 |
2010-01-06 | Perforation | 204.00 | 206.00 | 13 |
2009-09-25 | Packing Device Capped w/Cement | 932.00 | 940.00 | 0 |
2009-09-25 | Perforation | 718.50 | 720.00 | 23 |
2009-09-25 | Perforation | 704.00 | 707.00 | 23 |
2009-10-22 | Perforation | 692.00 | 693.00 | 23 |
2009-11-02 | Perforation | 687.50 | 688.50 | 13 |
2009-11-08 | Packing Device Capped w/Cement | 674.00 | 682.00 | 0 |
2009-11-08 | Perforation | 574.00 | 577.00 | 13 |
2009-11-08 | Perforation | 569.00 | 573.00 | 13 |
For data sources see[5]