If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0024082504002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.148074,"lon":-110.95902,"icon":""}]} |
Location: 00/04-25-002-08W4/2 | |
Location Alias: 00/04-25-02-08 W4M | |
Location Alias 2: 00/04-25-002-08 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 002 | |
Meridian: 4 | |
Range: 08 | |
Section: 25 | |
County/Municipality: County of Forty Mile No. 8 | |
Well Name: PINE CLIFF PENDOR 4-25-2-8 | |
Operator Name: Pine Cliff Energy Ltd. | |
License Number: 0124521 | |
License Date: 1986-11-24 | |
License Status: Abandoned | |
Spud Date: 1986-12-07 | |
Final Drill Date: 1986-12-09 | |
Well Total Depth: 938.00 m | |
Surface Hole Latitude: 49.148074 | |
Surface Hole Longitude: -110.959020 |
Date | Event |
---|---|
1986-11-24 | Obtained License |
1986-12-07 | Surface Casing Operation Performed |
1986-12-09 | Finished Drilling |
1986-12-09 | Well Log Performed |
1986-12-10 | Drill Stem Test Performed |
1986-12-11 | Production Casing Operation Performed |
1986-12-11 | Rig Released |
1986-12-18 | Well Log Performed |
1987-01-25 | Perforation Treatment Performed - Jet Perforation |
1987-01-26 | Perforation Treatment Performed - Jet Perforation |
1987-01-27 | Perforation Treatment Performed - Jet Perforation |
1987-06-23 | Well Mode changed to Drilled and Cased |
1989-07-14 | Well Began Production |
1989-07-14 | Well Fluid changed to Gas |
1989-07-14 | Well Mode changed to Flowing |
1994-06-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1994-06-13 | Plug Back Performed |
2003-01-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2003-01-10 | Plug Back Performed |
2003-01-10 | Well Abandoned |
2003-01-10 | Well Fluid changed to Gas |
2003-01-10 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1987-01-25 | Perforation | 874.30 | 876.30 | 13 |
1987-01-26 | Perforation | 634.00 | 635.50 | 13 |
1987-01-27 | Perforation | 641.00 | 642.50 | 13 |
1994-06-13 | Packing Device Capped w/Cement | 862.00 | 870.00 | 0 |
2003-01-10 | Packing Device Capped w/Cement | 620.00 | 628.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1989 | 4044 | 0.0 | 0.0 | 0.0 |
1990 | 4484 | 0.0 | 0.0 | 0.0 |
1991 | 6183 | 0.0 | 0.0 | 0.0 |
1992 | 4686 | 0.0 | 0.0 | 0.0 |
1993 | 3683 | 0.0 | 0.0 | 0.0 |
1994 | 3762 | 0.0 | 0.0 | 0.0 |
1995 | 8136 | 0.0 | 0.0 | 0.0 |
1996 | 8339 | 0.0 | 0.0 | 0.0 |
1997 | 7433 | 0.0 | 0.0 | 0.0 |
1998 | 196 | 0.0 | 0.0 | 0.0 |
2001 | 696 | 0.0 | 0.0 | 0.0 |
2002 | 24 | 0.0 | 0.0 | 0.0 |
For data sources see[5]