If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0024122508004 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.150495,"lon":-111.479917,"icon":""}]} |
| Location: 00/08-25-002-12W4/4 | |
| Location Alias: 00/08-25-02-12 W4M | |
| Location Alias 2: 00/08-25-002-12 W4/04 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 002 | |
| Meridian: 4 | |
| Range: 12 | |
| Section: 25 | |
| County/Municipality: County of Warner No. 5 | |
| Well Name: CNRES PHILP 8-25-2-12 | |
| Operator Name: Canadian Natural Resources Limited | |
| License Number: 0267736 | |
| License Date: 2002-02-14 | |
| License Status: Suspension | |
| Spud Date: 2002-02-25 | |
| Final Drill Date: 2002-02-28 | |
| Well Total Depth: 858.00 m | |
| Surface Hole Latitude: 49.150495 | |
| Surface Hole Longitude: -111.479917 |
| Date | Event |
|---|---|
| 2002-02-14 | Obtained License |
| 2002-02-26 | Surface Casing Operation Performed |
| 2002-02-28 | Finished Drilling |
| 2002-02-28 | Production Casing Operation Performed |
| 2002-02-28 | Well Log Performed |
| 2002-02-28 | Well Mode changed to Drilled and Cased |
| 2002-03-01 | Rig Released |
| 2002-03-08 | Perforation Treatment Performed - Jet Perforation |
| 2002-03-08 | Well Log Performed |
| 2002-03-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2002-03-12 | Perforation Treatment Performed - Jet Perforation |
| 2002-03-12 | Plug Back Performed |
| 2002-03-12 | Well Log Performed |
| 2002-03-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2002-03-13 | Perforation Treatment Performed - Jet Perforation |
| 2002-03-13 | Plug Back Performed |
| 2002-03-13 | Well Log Performed |
| 2002-03-15 | Perforation Treatment Performed - Fractured |
| 2002-03-17 | Perforation Treatment Performed - Jet Perforation |
| 2002-03-17 | Well Log Performed |
| 2002-03-18 | Perforation Treatment Performed - Fractured |
| 2002-04-19 | Well Began Production |
| 2002-04-19 | Well Fluid changed to Gas |
| 2002-04-19 | Well Mode changed to Flowing |
| 2002-12-20 | Perforation Treatment Performed - Jet Perforation |
| 2002-12-21 | Perforation Treatment Performed - Cement Squeeze |
| 2002-12-21 | Plug Back Performed |
| 2002-12-21 | Well Log Performed |
| 2002-12-27 | Perforation Treatment Performed - Jet Perforation |
| 2002-12-28 | Well Log Performed |
| 2002-12-29 | Perforation Treatment Performed - Fractured |
| 2003-03-01 | Well Fluid changed to Gas |
| 2003-03-01 | Well Mode changed to Flowing |
| 2013-06-30 | Well Fluid changed to Gas |
| 2013-06-30 | Well Mode changed to Suspended |
| 2013-10-01 | Well Fluid changed to Gas |
| 2013-10-01 | Well Mode changed to Flowing |
| 2019-06-01 | Well Fluid changed to Gas |
| 2019-06-01 | Well Mode changed to Suspended |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2002-03-08 | Perforation | 811.00 | 813.00 | 13 |
| 2002-12-20 | Perforation | 524.50 | 525.50 | 13 |
| 2002-12-21 | Cement Squeeze | 524.50 | 525.50 | 0 |
| 2002-12-27 | Perforation | 811.00 | 813.00 | 13 |
| 2002-12-29 | Fracture | 811.00 | 813.00 | 0 |
| 2002-03-12 | Packing Device Capped w/Cement | 779.00 | 807.50 | 0 |
| 2002-03-12 | Perforation | 524.50 | 525.50 | 13 |
| 2002-03-13 | Packing Device Capped w/Cement | 517.50 | 525.50 | 0 |
| 2002-03-13 | Perforation | 481.50 | 482.50 | 7 |
| 2002-03-15 | Fracture | 481.50 | 482.50 | 0 |
| 2002-03-17 | Perforation | 413.00 | 416.00 | 7 |
| 2002-03-17 | Perforation | 429.00 | 431.00 | 7 |
| 2002-03-18 | Fracture | 413.00 | 431.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2002 | 5505 | 0.0 | 0.0 | 0.0 |
| 2003 | 6981 | 0.0 | 0.0 | 0.0 |
| 2004 | 6575 | 0.0 | 0.0 | 0.0 |
| 2005 | 1460 | 0.0 | 0.0 | 0.0 |
| 2006 | 7295 | 0.0 | 0.0 | 0.0 |
| 2007 | 3648 | 0.0 | 0.0 | 0.0 |
| 2008 | 4377 | 0.0 | 0.0 | 0.0 |
| 2009 | 8710 | 0.0 | 0.0 | 0.0 |
| 2010 | 8752 | 0.0 | 0.0 | 0.0 |
| 2011 | 8755 | 0.0 | 0.0 | 0.0 |
| 2012 | 8782 | 0.0 | 0.0 | 0.0 |
| 2013 | 1460 | 0.0 | 0.0 | 0.0 |
| 2014 | 2924 | 0.0 | 0.0 | 0.0 |
| 2015 | 8759 | 0.0 | 0.0 | 0.0 |
| 2016 | 8777 | 0.0 | 0.0 | 0.0 |
| 2017 | 8748 | 0.0 | 0.0 | 0.0 |
| 2018 | 8759 | 0.0 | 0.0 | 0.0 |
| 2019 | 720 | 0.0 | 0.0 | 0.0 |
For data sources see[5]