X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0034081712002

Well Details

Well ID: 0034081712002
Loading map...
Location: 00/12-17-003-08W4/2
Location Alias: 00/12-17-03-08 W4M
Location Alias 2: 00/12-17-003-08 W4/02
Country: Canada
Province: Alberta
Township: 003
Meridian: 4
Range: 08
Section: 17
County/Municipality: County of Forty Mile No. 8
Well Name: PINE CLIFF PENDOR 12-17-3-8
Operator Name: Pine Cliff Energy Ltd.
License Number: 0378122
License Date: 2007-06-13
License Status: Issued
Spud Date: 2007-07-03
Final Drill Date: 2007-07-04
Well Total Depth: 718.00 m
Surface Hole Latitude: 49.211431
Surface Hole Longitude: -111.054840

For data sources see[1][2]

Well History

Date Event
2007-06-13 Obtained License
2007-07-03 Surface Casing Operation Performed
2007-07-04 Finished Drilling
2007-07-04 Production Casing Operation Performed
2007-07-04 Rig Released
2007-07-04 Well Log Performed
2007-07-04 Well Mode changed to Drilled and Cased
2007-07-19 Perforation Treatment Performed - Jet Perforation
2007-07-19 Well Log Performed
2008-02-15 Perforation Treatment Performed - Jet Perforation
2008-02-22 Perforation Treatment Performed - Jet Perforation
2008-03-19 Perforation Treatment Performed - Jet Perforation
2008-04-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-04-09 Perforation Treatment Performed - Jet Perforation
2008-04-09 Plug Back Performed
2008-04-10 Perforation Treatment Performed - Fractured
2008-04-17 Well Began Production
2008-04-17 Well Fluid changed to Gas
2008-04-17 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2007-07-19 Perforation 678.50 680.00 13
2008-02-15 Perforation 648.50 650.00 13
2008-02-22 Perforation 624.00 627.50 13
2008-03-19 Perforation 613.00 614.00 13
2008-04-09 Packing Device Capped w/Cement 599.00 607.00 0
2008-04-09 Perforation 508.00 513.00 13
2008-04-09 Perforation 504.00 507.00 13
2008-04-10 Fracture 504.00 513.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 3096 0.0 0.0 0.0
2009 6864 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8519 0.0 0.0 0.0
2014 8445 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References