X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0064150404000

Well Details

Well ID: 0064150404000
Loading map...
Location: 00/04-04-006-15W4/0
Location Alias: 00/04-04-06-15 W4M
Location Alias 2: 00/04-04-006-15 W4/00
Country: Canada
Province: Alberta
Township: 006
Meridian: 4
Range: 15
Section: 04
County/Municipality: County of Warner No. 5
Well Name: STRATEGIC CONRAD 4-4-6-15
Operator Name: Strategic Oil & Gas Ltd.
License Number: B0000884
License Date: 1945-03-08
License Status: Suspension
Spud Date: 1945-03-19
Final Drill Date: 1945-04-06
Well Total Depth: 899.10 m
Surface Hole Latitude: 49.436841
Surface Hole Longitude: -111.974330

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1945-03-08 Obtained License
1945-04-06 Drill Stem Test Performed
1945-04-06 Finished Drilling
1945-04-06 Perforation Treatment Performed - Open-Hole Completion
1945-04-06 Production Casing Operation Performed
1945-04-06 Well Mode changed to Drilled and Cased
1945-05-03 Well Began Production
1945-05-03 Well Fluid changed to Crude Oil
1945-05-03 Well Mode changed to Pumping
1971-05-26 Perforation Treatment Performed - Condensate Squeeze
1979-07-21 Well Fluid changed to Crude Oil
1979-07-21 Well Mode changed to Suspended
1988-07-10 Perforation Treatment Performed - Abrasa-Jet Perforation
1988-07-30 Well Fluid changed to Crude Oil
1988-07-30 Well Mode changed to Pumping
1992-12-01 Well Fluid changed to Crude Oil
1992-12-01 Well Mode changed to Suspended
1995-10-01 Perforation Treatment Performed - Jet Perforation
1995-10-25 Well Fluid changed to Crude Oil
1995-10-25 Well Mode changed to Pumping
2020-03-15 Well Fluid changed to Crude Oil
2020-03-15 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1945-04-06 Open Hole/Barefoot Completion 892.80 899.10 0
1971-05-26 Condensate Squeeze 894.30 899.10 0
1988-07-10 Hydra Jet Perforation 896.70 898.20 0
1995-10-01 Perforation 893.50 896.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 6450 0.0 0.0 0.0
1968 7166 0.0 0.0 0.0
1969 5406 0.0 0.0 0.0
1970 4571 0.0 0.0 0.0
1971 7865 0.0 0.0 0.0
1972 8469 0.0 0.0 0.0
1973 8406 0.0 0.0 0.0
1974 8543 0.0 0.0 0.0
1975 8175 0.0 0.0 0.0
1976 7181 0.0 0.0 0.0
1977 7944 0.0 0.0 0.0
1978 3017 0.0 0.0 0.0
1979 1486 0.0 0.0 0.0
1988 3206 0.0 0.0 0.0
1989 6656 0.0 0.0 0.0
1990 7754 0.0 0.0 0.0
1991 5828 0.0 0.0 0.0
1992 1401 0.0 0.0 0.0
1995 330 0.0 0.0 0.0
1996 6781 0.0 0.0 0.0
1997 8314 0.0 0.0 0.0
1998 6984 0.0 0.0 0.0
1999 5681 0.0 0.0 0.0
2000 8444 0.0 0.0 0.0
2001 4356 0.0 0.0 0.0
2002 7055 0.0 0.0 0.0
2003 2820 0.0 0.0 0.0
2004 5348 0.0 0.0 0.0
2005 2928 0.0 0.0 0.0
2006 8723 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8591 0.0 0.0 0.0
2010 8267 0.0 0.0 0.0
2011 1896 0.0 0.0 0.0
2012 8711 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8591 0.0 0.0 0.0
2015 8731 0.0 0.0 0.0
2016 1300 0.0 0.0 0.0

For data sources see[5]

References