If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0074163105002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.605396,"lon":-112.171026,"icon":""}]} |
Location: 00/05-31-007-16W4/2 | |
Location Alias: 00/05-31-07-16 W4M | |
Location Alias 2: 00/05-31-007-16 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 007 | |
Meridian: 4 | |
Range: 16 | |
Section: 31 | |
County/Municipality: Municipal District of Taber | |
Well Name: ZARGON ET AL TABERS 5-31-7-16 | |
Operator Name: Zargon Oil & Gas Ltd. | |
License Number: 0152070 | |
License Date: 1992-03-23 | |
License Status: Issued | |
Spud Date: 1992-03-30 | |
Final Drill Date: 1992-04-16 | |
Well Total Depth: 1182.00 m | |
Surface Hole Latitude: 49.605396 | |
Surface Hole Longitude: -112.171026 |
Date | Event |
---|---|
1992-03-23 | Obtained License |
1992-03-31 | Surface Casing Operation Performed |
1992-04-11 | Direction Drilling Operation Performed - Deviate |
1992-04-16 | Finished Drilling |
1992-04-16 | Well Mode changed to Drilled and Cased |
1992-04-17 | Well Log Performed |
1992-04-18 | Production Casing Operation Performed |
1992-04-18 | Rig Released |
1992-04-21 | Well Log Performed |
1992-06-02 | Perforation Treatment Performed - Jet Perforation |
1992-06-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1992-08-27 | Well Began Injection |
1992-08-27 | Well Fluid changed to Water |
1992-08-27 | Well Type changed to Injection |
1994-04-22 | Well Began Production |
1994-04-22 | Well Fluid changed to Crude Oil |
1994-04-22 | Well Mode changed to Flowing |
1994-07-26 | Perforation Treatment Performed - Cement Squeeze |
1994-07-26 | Plug Back Performed |
1994-07-29 | Well Log Performed |
1994-07-31 | Perforation Treatment Performed - Abrasa-Jet Perforation |
1994-08-04 | Perforation Treatment Performed - Chemical Squeeze |
1994-08-06 | Perforation Treatment Performed - Chemical Squeeze |
1994-08-12 | Perforation Treatment Performed - Casing Patch (Over Perfs) |
1994-08-12 | Well Fluid changed to Crude Oil |
1994-08-12 | Well Mode changed to Abandoned Zone |
2001-11-12 | Well Log Performed |
2001-11-13 | Well Log Performed |
2001-11-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2001-11-16 | Perforation Treatment Performed - Jet Perforation |
2001-11-16 | Plug Back Performed |
2001-11-16 | Well Fluid changed to Crude Oil |
2001-11-16 | Well Mode changed to Suspended |
2001-11-20 | Perforation Treatment Performed - Chemical Squeeze |
2001-11-21 | Well Log Performed |
2002-01-01 | Well Fluid changed to Water |
2002-01-01 | Well Type changed to Injection |
2002-01-10 | Perforation Treatment Performed - Chemical Squeeze |
2003-06-23 | Well Log Performed |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1992-04-11 | 425.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1992-06-02 | Perforation | 1133.00 | 1135.50 | 13 |
1994-08-06 | Chemical Squeeze | 1153.00 | 1160.00 | 0 |
1994-08-12 | Casing Patch | 1133.00 | 1139.00 | 0 |
2001-11-16 | Packing Device Capped w/Cement | 1147.00 | 1150.00 | 0 |
2001-11-16 | Perforation | 1136.00 | 1139.00 | 17 |
2001-11-16 | Perforation | 1133.00 | 1136.00 | 17 |
2001-11-20 | Chemical Squeeze | 1133.00 | 1139.00 | 0 |
2002-01-10 | Chemical Squeeze | 1133.00 | 1139.00 | 0 |
1992-06-02 | Perforation | 1137.00 | 1139.00 | 13 |
1992-06-06 | Acid Treatment | 1133.00 | 1139.00 | 0 |
1994-07-26 | Cement Squeeze | 1133.00 | 1139.00 | 0 |
1994-07-31 | Hydra Jet Perforation | 1153.00 | 1155.00 | 0 |
1994-07-31 | Hydra Jet Perforation | 1155.50 | 1157.50 | 0 |
1994-07-31 | Hydra Jet Perforation | 1158.50 | 1160.00 | 0 |
1994-08-04 | Chemical Squeeze | 1153.00 | 1160.00 | 0 |
1994-08-06 | Chemical Squeeze | 1153.00 | 1160.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1992 | 0 | 0.0 | 0.0 | 0.0 |
1993 | 0 | 0.0 | 0.0 | 0.0 |
1994 | 2183 | 0.0 | 0.0 | 0.0 |
2002 | 0 | 0.0 | 0.0 | 0.0 |
2003 | 0 | 0.0 | 0.0 | 0.0 |
2004 | 0 | 0.0 | 0.0 | 0.0 |
2005 | 0 | 0.0 | 0.0 | 0.0 |
2006 | 0 | 0.0 | 0.0 | 0.0 |
2007 | 0 | 0.0 | 0.0 | 0.0 |
2008 | 0 | 0.0 | 0.0 | 0.0 |
2009 | 0 | 0.0 | 0.0 | 0.0 |
2010 | 0 | 0.0 | 0.0 | 0.0 |
2011 | 0 | 0.0 | 0.0 | 0.0 |
2012 | 0 | 0.0 | 0.0 | 0.0 |
2013 | 0 | 0.0 | 0.0 | 0.0 |
2014 | 0 | 0.0 | 0.0 | 0.0 |
2015 | 0 | 0.0 | 0.0 | 0.0 |
2016 | 0 | 0.0 | 0.0 | 0.0 |
2017 | 0 | 0.0 | 0.0 | 0.0 |
2018 | 0 | 0.0 | 0.0 | 0.0 |
2019 | 0 | 0.0 | 0.0 | 0.0 |
2020 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[6]