X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0084171115002

Well Details

Well ID: 0084171115002
Loading map...
Location: 00/15-11-008-17W4/2
Location Alias: 00/15-11-08-17 W4M
Location Alias 2: 00/15-11-008-17 W4/02
Country: Canada
Province: Alberta
Township: 008
Meridian: 4
Range: 17
Section: 11
County/Municipality: Municipal District of Taber
Well Name: ZARGON TABERS 15-11-8-17
Operator Name: Zargon Oil & Gas Ltd.
License Number: 0274946
License Date: 2002-10-22
License Status: Suspension
Spud Date: 2002-11-11
Final Drill Date: 2002-11-15
Well Total Depth: 1034.00 m
Surface Hole Latitude: 49.638062
Surface Hole Longitude: -112.200811

For data sources see[1][2]

Well History

Date Event
2002-10-22 Obtained License
2002-11-12 Surface Casing Operation Performed
2002-11-15 Finished Drilling
2002-11-15 Well Log Performed
2002-11-15 Well Mode changed to Drilled and Cased
2002-11-16 Drill Stem Test Performed
2002-11-17 Production Casing Operation Performed
2002-11-17 Rig Released
2002-11-21 Perforation Treatment Performed - Jet Perforation
2002-11-21 Well Log Performed
2002-11-23 Perforation Treatment Performed - Jet Perforation
2002-11-23 Well Log Performed
2003-06-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-06-20 Perforation Treatment Performed - Jet Perforation
2003-06-20 Plug Back Performed
2003-06-20 Well Log Performed
2003-06-27 Well Began Production
2003-06-27 Well Fluid changed to Gas
2003-06-27 Well Mode changed to Flowing
2003-08-21 Perforation Treatment Performed - Cement Squeeze
2003-08-21 Plug Back Performed
2003-08-21 Well Fluid changed to Gas
2003-08-21 Well Mode changed to Abandoned Zone
2003-08-22 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-11-21 Perforation 985.00 991.00 17
2002-11-23 Perforation 988.00 994.00 17
2003-06-20 Packing Device Capped w/Cement 972.00 980.00 0
2003-06-20 Perforation 694.00 698.00 17
2003-08-21 Cement Squeeze 694.00 698.00 0
2003-08-22 Perforation 985.00 991.00 17
2003-08-22 Perforation 988.00 994.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 391 0.0 0.0 0.0

For data sources see[5]

References