X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0084202807000

Well Details

Well ID: 0084202807000
Loading map...
Location: 00/07-28-008-20W4/0
Location Alias: 00/07-28-08-20 W4M
Location Alias 2: 00/07-28-008-20 W4/00
Country: Canada
Province: Alberta
Township: 008
Meridian: 4
Range: 20
Section: 28
County/Municipality: Lethbridge County
Well Name: SOC COALDALE 7-28-8-20
Operator Name: AlphaBow Energy Ltd.
License Number: 0044671
License Date: 1972-12-29
License Status: Abandoned
Spud Date: 1973-01-13
Final Drill Date: 1973-01-18
Well Total Depth: 952.50 m
Surface Hole Latitude: 49.672928
Surface Hole Longitude: -112.650911

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1972-12-29 Obtained License
1973-01-18 Finished Drilling
1973-01-19 Drill Stem Test Performed
1973-01-19 Production Casing Operation Performed
1973-02-01 Perforation Treatment Performed - Jet Perforation
1973-02-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-02-10 Well Mode changed to Drilled and Cased
1976-09-01 Well Began Production
1976-09-01 Well Fluid changed to Gas
1976-09-01 Well Mode changed to Flowing
2004-09-27 Well Fluid changed to Gas
2004-09-27 Well Mode changed to Suspended
2009-11-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-11-22 Plug Back Performed
2009-11-22 Well Fluid changed to Gas
2009-11-22 Well Log Performed
2009-11-22 Well Mode changed to Abandoned Zone
2010-06-07 Perforation Treatment Performed - Abrasa-Jet Perforation
2010-06-09 Perforation Treatment Performed - Cement Squeeze
2010-06-09 Plug Back Performed
2010-08-25 Well Abandoned
2010-08-25 Well Fluid changed to Gas
2010-08-25 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1973-02-01 Perforation 829.40 830.60 7
1973-02-02 Acid Treatment 829.40 830.60 0
2009-11-22 Packing Device Capped w/Cement 812.00 820.00 0
2010-06-07 Hydra Jet Perforation 230.00 235.00 6
2010-06-09 Cement Squeeze 230.00 235.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 2922 0.0 0.0 0.0
1977 5793 0.0 0.0 0.0
1978 5228 0.0 0.0 0.0
1979 7226 0.0 0.0 0.0
1980 7839 0.0 0.0 0.0
1981 6620 0.0 0.0 0.0
1982 8359 0.0 0.0 0.0
1983 7233 0.0 0.0 0.0
1984 7574 0.0 0.0 0.0
1985 8666 0.0 0.0 0.0
1986 8569 0.0 0.0 0.0
1987 7090 0.0 0.0 0.0
1988 8585 0.0 0.0 0.0
1989 6368 0.0 0.0 0.0
1990 5553 0.0 0.0 0.0
1991 5276 0.0 0.0 0.0
1992 5576 0.0 0.0 0.0
1993 5876 0.0 0.0 0.0
1994 5921 0.0 0.0 0.0
1995 5970 0.0 0.0 0.0
1996 5789 0.0 0.0 0.0
1997 5951 0.0 0.0 0.0
1998 6254 0.0 0.0 0.0
1999 7802 0.0 0.0 0.0
2000 8626 0.0 0.0 0.0
2001 8729 0.0 0.0 0.0
2002 6504 0.0 0.0 0.0
2003 6238 0.0 0.0 0.0
2004 5879 0.0 0.0 0.0

For data sources see[5]

References