X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0084221612022

Well Details

Well ID: 0084221612022
Loading map...
Location: 02/12-16-008-22W4/2
Location Alias: 02/12-16-08-22 W4M
Location Alias 2: 02/12-16-008-22 W4/02
Country: Canada
Province: Alberta
Township: 008
Meridian: 4
Range: 22
Section: 16
County/Municipality: Lethbridge
Well Name: TAC 13-10 HZ PENNY 7-16-8-22
Operator Name: Tamarack Acquisition Corp.
License Number: 0489620
License Date: 2018-06-20
License Status: Amended
Spud Date: 2018-07-02
Final Drill Date: 2018-07-14
Well Total Depth: 2825.00 m
Surface Hole Latitude: 49.636609
Surface Hole Longitude: -112.912906

For data sources see[1][2]

Well History

Date Event
2018-06-20 Obtained License
2018-07-03 Surface Casing Operation Performed
2018-07-04 Well Log Performed
2018-07-05 Direction Drilling Operation Performed - Deviate
2018-07-06 Direction Drilling Operation Performed - Horizontal
2018-07-06 Intermediate Casing Operation Performed
2018-07-12 Direction Drilling Operation Performed - Horizontal
2018-07-14 Finished Drilling
2018-07-14 Well Log Performed
2018-07-14 Well Mode changed to Drilled and Cased
2018-07-15 Liner Casing Operation Performed
2018-07-16 Rig Released
2018-07-28 Perforation Treatment Performed - Multi-Stage Fracture
2018-07-29 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-04 Well Began Production
2018-08-04 Well Fluid changed to Crude Oil
2018-08-04 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2018-07-05 656.00 Deviate (5 - 79 degrees)
2018-07-06 1159.60 Horizontal
2018-07-12 2046.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-07-28 Multi-Stage Fracture 2781.40 2781.50 0
2018-07-29 Multi-Stage Fracture 2321.20 2321.30 0
2018-07-29 Multi-Stage Fracture 2269.90 2270.00 0
2018-07-29 Multi-Stage Fracture 2218.70 2218.80 0
2018-07-29 Multi-Stage Fracture 2167.40 2167.50 0
2018-07-29 Multi-Stage Fracture 2116.20 2116.30 0
2018-07-29 Multi-Stage Fracture 2065.00 2065.10 0
2018-07-29 Multi-Stage Fracture 2013.70 2013.80 0
2018-07-29 Multi-Stage Fracture 1962.40 1962.50 0
2018-07-29 Multi-Stage Fracture 1911.20 1911.30 0
2018-07-29 Multi-Stage Fracture 1860.40 1860.50 0
2018-07-28 Multi-Stage Fracture 2730.10 2730.20 0
2018-07-29 Multi-Stage Fracture 1809.10 1809.20 0
2018-07-29 Multi-Stage Fracture 1758.00 1758.10 0
2018-07-29 Multi-Stage Fracture 1706.80 1706.90 0
2018-07-29 Multi-Stage Fracture 1655.50 1655.60 0
2018-07-29 Multi-Stage Fracture 1604.70 1604.80 0
2018-07-29 Multi-Stage Fracture 1554.10 1554.20 0
2018-07-29 Multi-Stage Fracture 1502.80 1502.90 0
2018-07-29 Multi-Stage Fracture 1451.50 1451.60 0
2018-07-29 Multi-Stage Fracture 1400.30 1400.40 0
2018-07-29 Multi-Stage Fracture 1349.20 1349.30 0
2018-07-28 Multi-Stage Fracture 2679.30 2679.40 0
2018-07-29 Multi-Stage Fracture 1297.90 1298.00 0
2018-07-29 Multi-Stage Fracture 1246.70 1246.80 0
2018-07-29 Multi-Stage Fracture 1195.50 1195.60 0
2018-07-28 Multi-Stage Fracture 2628.10 2628.20 0
2018-07-28 Multi-Stage Fracture 2576.80 2576.90 0
2018-07-28 Multi-Stage Fracture 2525.70 2525.80 0
2018-07-29 Multi-Stage Fracture 2474.50 2474.60 0
2018-07-29 Multi-Stage Fracture 2423.30 2423.40 0
2018-07-29 Multi-Stage Fracture 2372.00 2372.10 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-07-28 2018-07-29 973 2,741 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water 7732-18-5 100 92.3339 N/A
Frac Sand - Regular Iron Horse Energy Services Crystalline Silica 14808-60-7 100 7.846 N/A
Tolcide PS75LT Fusion Technologies Inc. Bactericide/Biocide Tetrakis(Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.0578 N/A
water 7732-18-5 100 0.0578 N/A
IH-BEZ-6D Fusion Technologies Inc. Breaker Ethylene glycol 107-21-1 100 0.0443 N/A
IH-CS-4 Fusion Technologies Inc. Clay Control Non-Whimis Regulated Not Available 100 0.0909 N/A
IH-CBX-5 Fusion Technologies Inc. Crosslinker Boric Acid 10043-35-3 100 0.1556 N/A
Ethylene glycol 107-21-1 100 0.1556 N/A
Potassium Carbonate 584-08-7 100 0.1556 N/A
Potassium Hydroxide 1310-58-3 100 0.1556 N/A
IH-FR-1C Fusion Technologies Inc. Friction Reducer Non-Whimis Regulated Not Available 100 0.0215 N/A
IH-GA-1 Fusion Technologies Inc. Gelling Agent Low toxicity mineral oil 8042-47-5 100 0.3579 N/A
IH-NE-7 Fusion Technologies Inc. Surfactant Methanol 67-56-1 100 0.0726 N/A
Trimethylopropane ethoxylated 52624-57-4 100 0.0726 N/A
water 7732-18-5 100 0.0726 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-07-20 2018-07-20 Surface Water - River 3300
2018-07-20 2018-07-20 Central Water Distribution Facility 282

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 3492 0.0 0.0 0.0
2019 8602 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-07-16 No Incident Encountered 0.00 0.00
2018-07-29 No Incident Encountered 0.00 0.00

For data sources see[9]

References