If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0094073114020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.783267,"lon":-110.961413,"icon":""}]} |
Location: 02/14-31-009-07W4/0 | |
Location Alias: 02/14-31-09-07 W4M | |
Location Alias 2: 02/14-31-009-07 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 009 | |
Meridian: 4 | |
Range: 07 | |
Section: 31 | |
County/Municipality: County of Forty Mile No. 8 | |
Well Name: AVALON MEDHAT 14-31-9-7 | |
Operator Name: Avalon Energy Ltd. | |
License Number: 0431797 | |
License Date: 2011-02-23 | |
License Status: Issued | |
Spud Date: 2011-07-07 | |
Final Drill Date: 2011-07-18 | |
Well Total Depth: 2153.00 m | |
Surface Hole Latitude: 49.783267 | |
Surface Hole Longitude: -110.961413 |
Date | Event |
---|---|
2011-02-23 | Obtained License |
2011-07-08 | Surface Casing Operation Performed |
2011-07-09 | Direction Drilling Operation Performed - Horizontal |
2011-07-09 | Well Log Performed |
2011-07-12 | Intermediate Casing Operation Performed |
2011-07-18 | Finished Drilling |
2011-07-18 | Liner Casing Operation Performed |
2011-07-18 | Well Log Performed |
2011-07-18 | Well Mode changed to Drilled and Cased |
2011-07-19 | Perforation Treatment Performed - Open-Hole Completion |
2011-07-19 | Perforation Treatment Performed - Slotted Liner or Casing |
2011-07-19 | Rig Released |
2011-07-24 | Well Log Performed |
2011-08-23 | Well Began Production |
2011-08-23 | Well Fluid changed to Crude Oil |
2011-08-23 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-07-09 | 598.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-07-19 | Slotted Liner | 1069.00 | 2075.00 | 0 |
2011-07-19 | Open Hole/Barefoot Completion | 2075.00 | 2153.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 3138 | 0.0 | 0.0 | 0.0 |
2012 | 8089 | 0.0 | 0.0 | 0.0 |
2013 | 528 | 0.0 | 0.0 | 0.0 |
2014 | 8471 | 0.0 | 0.0 | 0.0 |
2015 | 8639 | 0.0 | 0.0 | 0.0 |
2016 | 8231 | 0.0 | 0.0 | 0.0 |
2017 | 8087 | 0.0 | 0.0 | 0.0 |
2018 | 8184 | 0.0 | 0.0 | 0.0 |
2019 | 7152 | 0.0 | 0.0 | 0.0 |
2020 | 1944 | 0.0 | 0.0 | 0.0 |
For data sources see[6]