X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0094161912000

Well Details

Well ID: 0094161912000
Loading map...
Location: 00/12-19-009-16W4/0
Location Alias: 00/12-19-09-16 W4M
Location Alias 2: 00/12-19-009-16 W4/00
Country: Canada
Province: Alberta
Township: 009
Meridian: 4
Range: 16
Section: 19
County/Municipality: Municipal District of Taber
Well Name: RENAISSANCE TABER 12-19-9-16
Operator Name: Husky Oil Operations Limited
License Number: 0074273
License Date: 1979-02-01
License Status: RecCertified
Spud Date: 1979-02-06
Final Drill Date: 1979-02-12
Well Total Depth: 978.00 m
Surface Hole Latitude: 49.751483
Surface Hole Longitude: -112.169582

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-02-01 Obtained License
1979-02-12 Drill Stem Test Performed
1979-02-12 Finished Drilling
1979-02-12 Well Mode changed to Drilled and Cased
1979-02-13 Drill Stem Test Performed
1979-02-15 Production Casing Operation Performed
1979-02-24 Perforation Treatment Performed - Jet Perforation
1979-02-26 Perforation Treatment Performed - Visqueeze
1979-02-28 Perforation Treatment Performed - Jet Perforation
1979-03-01 Perforation Treatment Performed - Acid Wash - No Pressure
1979-03-02 Perforation Treatment Performed - Cement Squeeze
1979-03-03 Perforation Treatment Performed - Jet Perforation
1979-04-02 Well Began Production
1979-04-02 Well Fluid changed to Crude Oil
1979-04-02 Well Mode changed to Pumping
1980-09-26 Well Fluid changed to Crude Oil
1980-09-26 Well Mode changed to Suspended
1995-09-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-09-17 Plug Back Performed
1995-09-17 Well Abandoned
1995-09-17 Well Fluid changed to Crude Oil
1995-09-17 Well Log Performed
1995-09-17 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-02-24 Perforation 967.50 969.50 13
1979-02-24 Perforation 970.50 973.50 13
1979-02-26 Visqueeze 967.50 973.50 0
1979-02-28 Perforation 967.50 969.50 13
1979-03-01 Acid Wash 967.50 973.50 0
1979-03-02 Cement Squeeze 967.50 973.50 0
1979-03-03 Perforation 972.00 973.00 13
1995-09-17 Packing Device Capped w/Cement 956.00 964.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 1878 0.0 0.0 0.0

For data sources see[5]

References