If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0114040511003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.88127,"lon":-110.520936,"icon":""}]} |
| Location: 00/11-05-011-04W4/3 | |
| Location Alias: 00/11-05-11-04 W4M | |
| Location Alias 2: 00/11-05-011-04 W4/03 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 011 | |
| Meridian: 4 | |
| Range: 04 | |
| Section: 05 | |
| County/Municipality: Cypress County | |
| Well Name: ICGR MEDHAT 11-5-11-4 | |
| Operator Name: Pembina NGL Corporation | |
| License Number: 0075520 | |
| License Date: 1979-05-07 | |
| License Status: RecCertified | |
| Spud Date: 1978-08-14 | |
| Final Drill Date: 1978-08-14 | |
| Well Total Depth: 1050.00 m | |
| Surface Hole Latitude: 49.881270 | |
| Surface Hole Longitude: -110.520936 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1978-08-14 | Finished Drilling |
| 1978-08-15 | Well Mode changed to Drilled and Cased |
| 1978-08-16 | Perforation Treatment Performed - Jet Perforation |
| 1978-08-17 | Perforation Treatment Performed - Jet Perforation |
| 1978-08-18 | Perforation Treatment Performed - Cement Squeeze |
| 1978-08-19 | Perforation Treatment Performed - Fractured |
| 1978-08-19 | Perforation Treatment Performed - Jet Perforation |
| 1978-08-22 | Perforation Treatment Performed - Jet Perforation |
| 1978-08-23 | Perforation Treatment Performed - Cement Squeeze |
| 1978-09-21 | Perforation Treatment Performed - Cement Squeeze |
| 1978-09-23 | Perforation Treatment Performed - Cement Squeeze |
| 1978-09-24 | Perforation Treatment Performed - Cement Squeeze |
| 1978-10-15 | Well Began Production |
| 1978-10-15 | Well Fluid changed to Gas |
| 1978-10-15 | Well Mode changed to Flowing |
| 1979-05-07 | Obtained License |
| 1995-05-01 | Well Fluid changed to Gas |
| 1995-05-01 | Well Mode changed to Suspended |
| 1997-08-23 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1997-08-23 | Perforation Treatment Performed - Jet Perforation |
| 1997-08-23 | Plug Back Performed |
| 1997-08-25 | Perforation Treatment Performed - Cement Plug |
| 1997-08-25 | Perforation Treatment Performed - Remedial Casing |
| 1997-08-26 | Well Abandoned |
| 1997-08-26 | Well Fluid changed to Gas |
| 1997-08-26 | Well Mode changed to Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1978-08-16 | Perforation | 484.30 | 484.90 | 7 |
| 1978-09-23 | Cement Squeeze | 438.90 | 439.20 | 0 |
| 1978-09-24 | Cement Squeeze | 438.90 | 439.20 | 0 |
| 1997-08-23 | Packing Device Capped w/Cement | 454.00 | 462.00 | 0 |
| 1997-08-23 | Perforation | 228.00 | 229.00 | 13 |
| 1997-08-25 | Remedial Casing Cementing | 228.00 | 229.00 | 0 |
| 1997-08-25 | Cement Plug | 200.00 | 229.00 | 0 |
| 1978-08-17 | Perforation | 467.20 | 467.90 | 7 |
| 1978-08-18 | Cement Squeeze | 467.20 | 484.90 | 0 |
| 1978-08-19 | Perforation | 472.70 | 474.90 | 3 |
| 1978-08-19 | Perforation | 476.40 | 477.00 | 3 |
| 1978-08-19 | Fracture | 472.70 | 477.00 | 0 |
| 1978-08-22 | Perforation | 438.90 | 439.20 | 13 |
| 1978-08-23 | Cement Squeeze | 438.90 | 439.20 | 0 |
| 1978-09-21 | Cement Squeeze | 438.90 | 439.20 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1978 | 1491 | 0.0 | 0.0 | 0.0 |
| 1979 | 7625 | 0.0 | 0.0 | 0.0 |
| 1980 | 7680 | 0.0 | 0.0 | 0.0 |
| 1981 | 5504 | 0.0 | 0.0 | 0.0 |
| 1982 | 5052 | 0.0 | 0.0 | 0.0 |
| 1983 | 3159 | 0.0 | 0.0 | 0.0 |
| 1984 | 4325 | 0.0 | 0.0 | 0.0 |
| 1985 | 4948 | 0.0 | 0.0 | 0.0 |
| 1987 | 72 | 0.0 | 0.0 | 0.0 |
For data sources see[5]