X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0114131710000

Well Details

Well ID: 0114131710000
Loading map...
Location: 00/10-17-011-13W4/0
Location Alias: 00/10-17-11-13 W4M
Location Alias 2: 00/10-17-011-13 W4/00
Country: Canada
Province: Alberta
Township: 011
Meridian: 4
Range: 13
Section: 17
County/Municipality: Municipal District of Taber
Well Name: COGI GRDFKS 10-17-11-13
Operator Name: Canadian Oil & Gas International Inc.
License Number: 0029301
License Date: 1965-11-02
License Status: Issued
Spud Date: 1965-11-04
Final Drill Date: 1965-11-18
Well Total Depth: 935.70 m
Surface Hole Latitude: 49.911050
Surface Hole Longitude: -111.741556

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1965-11-02 Obtained License
1965-11-06 Kick Occurred
1965-11-13 Drill Stem Test Performed
1965-11-18 Finished Drilling
1965-11-18 Well Mode changed to Drilled and Cased
1965-11-19 Production Casing Operation Performed
1965-11-21 Perforation Treatment Performed - Cement Plug
1965-11-22 Perforation Treatment Performed - Jet Perforation
1965-12-02 Well Began Production
1965-12-02 Well Fluid changed to Crude Oil
1965-12-02 Well Mode changed to Flowing
1965-12-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-08-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-08-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1976-08-18 Perforation Treatment Performed - Jet Perforation
1976-08-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-06-30 Well Fluid changed to Crude Oil
1977-06-30 Well Mode changed to Suspended
1977-07-02 Perforation Treatment Performed - Cement Squeeze
1977-07-07 Perforation Treatment Performed - Jet Perforation
1977-07-08 Perforation Treatment Performed - Jet Perforation
1977-07-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-07-12 Perforation Treatment Performed - Jet Perforation
1977-07-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-05-27 Well Log Performed
1988-07-20 Well Log Performed
1988-07-21 Perforation Treatment Performed - Cement Squeeze
1988-07-25 Perforation Treatment Performed - Jet Perforation
1988-07-26 Well Log Performed
1988-07-27 Perforation Treatment Performed - Jet Perforation
1988-07-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-07-30 Perforation Treatment Performed - Jet Perforation
1988-07-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-07-31 Perforation Treatment Performed - Jet Perforation
1988-09-28 Perforation Treatment Performed - Chemical Squeeze
1988-09-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-10-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-09-10 Perforation Treatment Performed - Jet Perforation
1990-09-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-09-12 Perforation Treatment Performed - Cement Squeeze
1990-09-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-09-14 Perforation Treatment Performed - Cement Squeeze
1990-11-01 Well Began Injection
1990-11-01 Well Fluid changed to Water
1990-11-01 Well Type changed to Disposal
2014-02-01 Well Fluid changed to Water
2014-02-01 Well Mode changed to Suspended
2014-02-01 Well Type changed to Disposal

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-11-21 Cement Plug 884.80 884.80 0
1977-07-08 Perforation 862.00 863.80 13
1977-07-09 Acid Treatment 862.00 863.80 0
1977-07-12 Perforation 862.00 863.80 13
1977-07-13 Acid Treatment 862.00 863.80 0
1988-07-21 Cement Squeeze 862.00 863.80 0
1988-07-25 Perforation 874.20 876.00 7
1988-07-27 Perforation 879.00 883.90 13
1988-07-28 Acid Treatment 879.00 883.90 0
1988-07-30 Perforation 879.00 883.90 13
1988-07-31 Acid Treatment 879.00 883.90 0
1965-11-22 Perforation 867.50 868.10 7
1988-07-31 Perforation 879.00 884.00 13
1988-09-28 Chemical Squeeze 879.00 884.00 0
1988-09-29 Acid Treatment 879.00 884.00 0
1988-10-07 Acid Treatment 874.20 884.00 0
1990-09-10 Perforation 862.00 863.80 13
1990-09-10 Perforation 867.50 868.10 7
1990-09-11 Acid Treatment 862.00 868.10 0
1990-09-12 Cement Squeeze 867.50 868.10 0
1990-09-14 Acid Treatment 862.00 863.80 0
1990-09-14 Cement Squeeze 862.00 863.80 0
1965-12-09 Acid Treatment 867.50 868.10 0
1976-08-18 Perforation 874.20 876.00 7
1976-08-18 Acid Treatment 874.20 876.00 0
1976-08-18 Packing Device Capped w/Cement 870.50 871.70 0
1976-08-19 Acid Treatment 867.50 868.10 0
1977-07-02 Cement Squeeze 867.50 868.10 0
1977-07-07 Perforation 862.00 863.80 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 8639 0.0 0.0 0.0
1968 8519 0.0 0.0 0.0
1969 8759 0.0 0.0 0.0
1970 8567 0.0 0.0 0.0
1971 8759 0.0 0.0 0.0
1972 8759 0.0 0.0 0.0
1973 8735 0.0 0.0 0.0
1974 8759 0.0 0.0 0.0
1975 6939 0.0 0.0 0.0
1976 6699 0.0 0.0 0.0
1977 4319 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1965-11-06 Kick 105.80 105.80

For data sources see[6]

References