X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0114161104030

Well Details

Well ID: 0114161104030
Loading map...
Location: 03/04-11-011-16W4/0
Location Alias: 03/04-11-11-16 W4M
Location Alias 2: 03/04-11-011-16 W4/00
Country: Canada
Province: Alberta
Township: 011
Meridian: 4
Range: 16
Section: 11
County/Municipality: Municipal District of Taber
Well Name: SLE TABERN 4-11-11-16
Operator Name: SanLing Energy Ltd.
License Number: 0146266
License Date: 1990-11-09
License Status: Suspension
Spud Date: 1990-11-13
Final Drill Date: 1990-11-18
Well Total Depth: 1008.00 m
Surface Hole Latitude: 49.888373
Surface Hole Longitude: -112.095004

For data sources see[1][2]

Well History

Date Event
1990-11-09 Obtained License
1990-11-14 Surface Casing Operation Performed
1990-11-15 Direction Drilling Operation Performed - Deviate
1990-11-18 Finished Drilling
1990-11-18 Well Log Performed
1990-11-18 Well Mode changed to Drilled and Cased
1990-11-19 Drill Stem Test Performed
1990-11-19 Well Log Performed
1990-11-21 Production Casing Operation Performed
1990-11-21 Rig Released
1990-11-30 Well Log Performed
1990-12-04 Well Log Performed
1990-12-06 Perforation Treatment Performed - Jet Perforation
1991-01-19 Well Began Production
1991-01-19 Well Fluid changed to Crude Oil
1991-01-19 Well Mode changed to Flowing
1994-05-31 Perforation Treatment Performed - Cement Squeeze
1994-06-03 Perforation Treatment Performed - Jet Perforation
1994-06-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-10-31 Well Fluid changed to Crude Oil
1997-10-31 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1990-11-15 351.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-12-06 Perforation 971.00 973.00 13
1990-12-06 Perforation 975.30 978.30 13
1994-05-31 Cement Squeeze 971.00 978.30 0
1994-06-03 Perforation 985.00 992.50 13
1994-06-09 Acid Treatment 985.00 992.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1991 8231 0.0 0.0 0.0
1992 8594 0.0 0.0 0.0
1993 720 0.0 0.0 0.0
1996 24 0.0 0.0 0.0

For data sources see[6]

References