X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0114250113000

Well Details

Well ID: 0114250113000
Loading map...
Location: 00/13-01-011-25W4/0
Location Alias: 00/13-01-11-25 W4M
Location Alias 2: 00/13-01-011-25 W4/00
Country: Canada
Province: Alberta
Township: 011
Meridian: 4
Range: 25
Section: 01
County/Municipality: Municipal District of Willow Creek No. 26
Well Name: TORC HZ GRANUM 13-1-11-25
Operator Name: TORC Oil & Gas Ltd.
License Number: 0470640
License Date: 2014-10-15
License Status: Issued
Spud Date: 2014-10-21
Final Drill Date: 2014-11-09
Well Total Depth: 3772.00 m
Surface Hole Latitude: 49.872787
Surface Hole Longitude: -113.297080

For data sources see[1][2]

Well History

Date Event
2014-10-15 Obtained License
2014-10-22 Surface Casing Operation Performed
2014-10-27 Direction Drilling Operation Performed - Deviate
2014-10-29 Intermediate Casing Operation Performed
2014-11-02 Direction Drilling Operation Performed - Horizontal
2014-11-09 Finished Drilling
2014-11-09 Well Log Performed
2014-11-09 Well Mode changed to Drilled and Cased
2014-11-11 Liner Casing Operation Performed
2014-11-12 Rig Released
2014-11-18 Well Log Performed
2014-11-30 Perforation Treatment Performed - Multi-Stage Fracture
2014-12-01 Perforation Treatment Performed - Multi-Stage Fracture
2014-12-02 Perforation Treatment Performed - Multi-Stage Fracture
2014-12-09 Well Log Performed
2015-03-02 Well Began Production
2015-03-02 Well Fluid changed to Crude Oil
2015-03-02 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-10-21 Trinidad Drilling Ltd. 34E N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-10-27 2070.00 Deviate (5 - 79 degrees)
2014-11-02 2385.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-11-30 Multi-Stage Fracture 3746.60 3747.30 0
2014-12-01 Multi-Stage Fracture 3290.00 3290.10 0
2014-12-01 Multi-Stage Fracture 3249.40 3249.50 0
2014-12-01 Multi-Stage Fracture 3208.10 3208.20 0
2014-12-01 Multi-Stage Fracture 3167.80 3167.90 0
2014-12-01 Multi-Stage Fracture 3126.70 3126.80 0
2014-12-01 Multi-Stage Fracture 3085.30 3085.40 0
2014-12-01 Multi-Stage Fracture 3044.10 3044.20 0
2014-12-02 Multi-Stage Fracture 2938.50 2938.60 0
2014-12-02 Multi-Stage Fracture 2897.70 2897.80 0
2014-12-02 Multi-Stage Fracture 2856.90 2857.00 0
2014-11-30 Multi-Stage Fracture 3706.60 3706.70 0
2014-12-02 Multi-Stage Fracture 2814.80 2814.90 0
2014-12-02 Multi-Stage Fracture 2733.60 2733.70 0
2014-12-02 Multi-Stage Fracture 2705.20 2705.30 0
2014-12-02 Multi-Stage Fracture 2678.80 2678.90 0
2014-12-02 Multi-Stage Fracture 2650.40 2650.50 0
2014-12-02 Multi-Stage Fracture 2622.60 2622.70 0
2014-12-02 Multi-Stage Fracture 2595.40 2595.50 0
2014-12-02 Multi-Stage Fracture 2567.60 2567.70 0
2014-12-02 Multi-Stage Fracture 2540.20 2540.30 0
2014-12-02 Multi-Stage Fracture 2499.80 2499.90 0
2014-11-30 Multi-Stage Fracture 3665.20 3665.30 0
2014-12-02 Multi-Stage Fracture 2445.00 2445.10 0
2014-11-30 Multi-Stage Fracture 3637.00 3637.10 0
2014-12-01 Multi-Stage Fracture 3504.10 3504.20 0
2014-12-01 Multi-Stage Fracture 3451.00 3451.10 0
2014-12-01 Multi-Stage Fracture 3410.70 3410.80 0
2014-12-01 Multi-Stage Fracture 3370.50 3370.60 0
2014-12-01 Multi-Stage Fracture 3330.30 3330.40 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-11-30 2014-12-02 2,289 12,450 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 88.5646 N/A
Carbo-EconoProp (30/50) Canyon Mullite 1302-93-8 100 0.6464 N/A
Silica Crystalline-Cristobalite 14464-46-1 100 0.6464 N/A
Silicon Dioxide (amorphous as glass) 7631-86-9 100 0.6464 N/A
Sand (30/50) Ottawa Canyon Aluminum Oxide 1344-28-1 100 2.135 N/A
Crystalline silica. quartz 14808-60-7 100 2.135 N/A
Iron Oxide 1309-37-1 100 2.1351 N/A
Titanium Oxide 13463-67-7 100 2.1352 N/A
Sand (40/70) Ottawa Canyon Aluminum Oxide 1344-28-1 100 8.6111 N/A
Crystalline silica. quartz 14808-60-7 100 8.6111 N/A
Iron Oxide 1309-37-1 100 8.6111 N/A
Titanium Oxide 13463-67-7 100 8.6113 N/A
Tolcide PS75LT Canyon Bactericide/Biocide Tetrakis (Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.0251 N/A
Water 7732-18-5 100 0.0251 N/A
CAN-2301 Breaker (Oxidizer) Canyon Breaker Ammonium Persulfate 7727-54-0 100 0.0143 N/A
Non-hazardous base ingredient(s) Not Available 100 0.0143 N/A
CAN-1911 Clay Stabilizer Canyon Clay Control 1.6-Hexandiamine. dihydrochloride 6055-52-3 100 0.0973 N/A
Water 7732-18-5 100 0.0973 N/A
CAN-2056 Gellant (G50 Microtox EC50) Canyon Gelling Agent Ammonium Chloride 12125-02-9 100 0.1977 N/A
Hydrotreated Kerosene 64742-47-8 100 0.1977 N/A
Water 7732-18-5 100 0.1977 N/A
CAN-2403 nanoFLO Canyon Surfactant Ethanol 64-17-5 100 0.0878 N/A
Methanol 67-56-1 100 0.0878 N/A
Terpenes and Terpenoids. sweet orange-oil 68647-72-3 100 0.0878 N/A
Water 7732-18-5 100 0.0878 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2014-11-18 2014-12-01 Municipal Water 845
2014-11-18 2014-12-02 Surface Water - River 11824

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 7189 0.0 0.0 0.0
2016 8470 0.0 0.0 0.0
2017 7956 0.0 0.0 0.0
2018 8486 0.0 0.0 0.0
2019 8663 0.0 0.0 0.0
2020 1824 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-11-12 No Incident Encountered 0.00 0.00
2014-12-10 No Incident Encountered 0.00 0.00

For data sources see[10]

References