If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0124091106000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.981873,"lon":-111.131116,"icon":""}]} |
| Location: 00/06-11-012-09W4/0 | |
| Location Alias: 00/06-11-12-09 W4M | |
| Location Alias 2: 00/06-11-012-09 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 012 | |
| Meridian: 4 | |
| Range: 09 | |
| Section: 11 | |
| County/Municipality: County of Forty Mile No. 8 | |
| Well Name: DALCO ET AL BOW ISLAND 6-11-12-9 | |
| Operator Name: Marathon Canada Limited | |
| License Number: 0087270 | |
| License Date: 1980-11-26 | |
| License Status: RecCertified | |
| Spud Date: 1980-12-14 | |
| Final Drill Date: 1980-12-15 | |
| Well Total Depth: 779.00 m | |
| Surface Hole Latitude: 49.981873 | |
| Surface Hole Longitude: -111.131116 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1980-11-26 | Obtained License |
| 1980-12-15 | Finished Drilling |
| 1980-12-16 | Production Casing Operation Performed |
| 1980-12-16 | Well Mode changed to Drilled and Cased |
| 1981-02-25 | Perforation Treatment Performed - Jet Perforation |
| 1981-04-09 | Well Began Production |
| 1981-04-09 | Well Fluid changed to Gas |
| 1981-04-09 | Well Mode changed to Flowing |
| 1991-03-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1991-03-06 | Perforation Treatment Performed - Jet Perforation |
| 1991-03-06 | Plug Back Performed |
| 1991-03-06 | Well Fluid changed to Gas |
| 1991-03-06 | Well Log Performed |
| 1991-03-06 | Well Mode changed to Abandoned Zone |
| 1991-03-07 | Perforation Treatment Performed - Fractured |
| 1991-09-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1991-09-10 | Plug Back Performed |
| 1991-09-10 | Well Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1981-02-25 | Perforation | 617.00 | 632.00 | 7 |
| 1991-03-06 | Packing Device Capped w/Cement | 595.00 | 603.00 | 0 |
| 1991-03-06 | Perforation | 297.00 | 298.00 | 14 |
| 1991-03-07 | Fracture | 297.00 | 298.00 | 0 |
| 1991-09-10 | Packing Device Capped w/Cement | 280.00 | 288.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1981 | 5632 | 0.0 | 0.0 | 0.0 |
| 1982 | 7894 | 0.0 | 0.0 | 0.0 |
| 1983 | 8031 | 0.0 | 0.0 | 0.0 |
| 1984 | 8759 | 0.0 | 0.0 | 0.0 |
| 1985 | 7928 | 0.0 | 0.0 | 0.0 |
| 1986 | 4294 | 0.0 | 0.0 | 0.0 |
| 1987 | 742 | 0.0 | 0.0 | 0.0 |
| 1988 | 8729 | 0.0 | 0.0 | 0.0 |
| 1989 | 8472 | 0.0 | 0.0 | 0.0 |
| 1990 | 8745 | 0.0 | 0.0 | 0.0 |
| 1991 | 1534 | 0.0 | 0.0 | 0.0 |
For data sources see[5]