X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0124131206000

Well Details

Well ID: 0124131206000
Loading map...
Location: 00/06-12-012-13W4/0
Location Alias: 00/06-12-12-13 W4M
Location Alias 2: 00/06-12-012-13 W4/00
Country: Canada
Province: Alberta
Township: 012
Meridian: 4
Range: 13
Section: 12
County/Municipality: Municipal District of Taber
Well Name: COGI BI 6-12-12-13
Operator Name: Canadian Oil & Gas International Inc.
License Number: 0139564
License Date: 1989-04-12
License Status: Amended
Spud Date: 1989-04-15
Final Drill Date: 1989-04-22
Well Total Depth: 930.00 m
Surface Hole Latitude: 49.981325
Surface Hole Longitude: -111.653840

For data sources see[1][2]

Well History

Date Event
1989-04-12 Obtained License
1989-04-16 Surface Casing Operation Performed
1989-04-18 Direction Drilling Operation Performed - Deviate
1989-04-22 Finished Drilling
1989-04-22 Well Mode changed to Drilled and Cased
1989-04-23 Well Log Performed
1989-04-24 Production Casing Operation Performed
1989-04-24 Rig Released
1989-04-24 Well Log Performed
1989-05-25 Perforation Treatment Performed - Jet Perforation
1989-05-25 Well Log Performed
1989-05-27 Perforation Treatment Performed - Jet Perforation
1989-05-27 Well Log Performed
1989-06-01 Well Began Production
1989-06-01 Well Fluid changed to Crude Oil
1989-06-01 Well Mode changed to Flowing
1996-05-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-05-25 Plug Back Performed
1996-05-25 Well Abandoned
1996-05-25 Well Fluid changed to Crude Oil
1996-05-25 Well Mode changed to Abandoned
1996-05-26 Well Fluid changed to Crude Oil
1996-05-26 Well Mode changed to Abandoned and Re-entered

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1989-04-18 550.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1989-05-25 Perforation 898.00 899.00 13
1989-05-27 Perforation 899.50 900.50 13
1996-05-25 Packing Device Capped w/Cement 885.60 893.60 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1989 5007 0.0 0.0 0.0
1990 6913 0.0 0.0 0.0
1991 7577 0.0 0.0 0.0
1992 8276 0.0 0.0 0.0
1993 6240 0.0 0.0 0.0
1994 8263 0.0 0.0 0.0
1995 7619 0.0 0.0 0.0

For data sources see[6]

References