X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0124142210000

Well Details

Well ID: 0124142210000
Loading map...
Location: 00/10-22-012-14W4/0
Location Alias: 00/10-22-12-14 W4M
Location Alias 2: 00/10-22-012-14 W4/00
Country: Canada
Province: Alberta
Township: 012
Meridian: 4
Range: 14
Section: 22
County/Municipality: Municipal District of Taber
Well Name: NORCEN GRAND FORKS 10-22-12-14
Operator Name: Canadian Natural Resources Limited
License Number: 0212872
License Date: 1998-01-31
License Status: Suspension
Spud Date: 1998-02-27
Final Drill Date: 1998-03-08
Well Total Depth: 1355.00 m
Surface Hole Latitude: 50.013850
Surface Hole Longitude: -111.833626

For data sources see[1][2]

Well History

Date Event
1998-01-31 Obtained License
1998-02-28 Surface Casing Operation Performed
1998-03-08 Finished Drilling
1998-03-09 Well Log Performed
1998-03-10 Production Casing Operation Performed
1998-03-10 Rig Released
1998-03-10 Well Mode changed to Drilled and Cased
1998-04-02 Perforation Treatment Performed - Jet Perforation
1998-04-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-04-06 Perforation Treatment Performed - Jet Perforation
1998-04-10 Perforation Treatment Performed - Fractured
1998-04-17 Perforation Treatment Performed - Jet Perforation
1998-04-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-04-18 Perforation Treatment Performed - Remedial Casing
1998-04-20 Perforation Treatment Performed - Jet Perforation
1998-04-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-04-24 Perforation Treatment Performed - Remedial Casing
1999-03-04 Well Began Production
1999-03-04 Well Fluid changed to Gas
1999-03-04 Well Mode changed to Flowing
2002-04-01 Well Fluid changed to Gas
2002-04-01 Well Mode changed to Pumping
2014-03-31 Well Fluid changed to Gas
2014-03-31 Well Mode changed to Suspended
2014-05-01 Well Fluid changed to Gas
2014-05-01 Well Mode changed to Flowing
2014-06-01 Well Fluid changed to Gas
2014-06-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1998-04-02 Perforation 1323.00 1327.00 17
1998-04-21 Acid Treatment 356.00 357.00 0
1998-04-24 Remedial Casing Cementing 356.00 357.00 0
1998-04-04 Acid Treatment 1323.00 1327.00 0
1998-04-06 Perforation 1304.50 1309.50 17
1998-04-06 Perforation 1319.00 1320.00 17
1998-04-10 Fracture 1304.50 1320.00 0
1998-04-17 Perforation 407.00 408.00 18
1998-04-18 Acid Treatment 407.00 408.00 0
1998-04-18 Remedial Casing Cementing 407.00 408.00 0
1998-04-20 Perforation 356.00 357.00 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 6687 0.0 0.0 0.0
2000 8343 0.0 0.0 0.0
2001 8267 0.0 0.0 0.0
2002 8674 0.0 0.0 0.0
2003 7717 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 8195 0.0 0.0 0.0
2006 8523 0.0 0.0 0.0
2007 8519 0.0 0.0 0.0
2008 8685 0.0 0.0 0.0
2009 8539 0.0 0.0 0.0
2010 8163 0.0 0.0 0.0
2011 7536 0.0 0.0 0.0
2012 2304 0.0 0.0 0.0
2013 4703 0.0 0.0 0.0

For data sources see[5]

References