X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0124142516022

Well Details

Well ID: 0124142516022
Loading map...
Location: 02/16-25-012-14W4/2
Location Alias: 02/16-25-12-14 W4M
Location Alias 2: 02/16-25-012-14 W4/02
Country: Canada
Province: Alberta
Township: 012
Meridian: 4
Range: 14
Section: 25
County/Municipality: Municipal District of Taber
Well Name: OAK ET AL 03 GRDFKS 8-25UM-12-14
Operator Name: Canadian Natural Resources Limited
License Number: 0073395
License Date: 1978-12-08
License Status: Amended
Spud Date: 1978-12-14
Final Drill Date: 1981-03-19
Well Total Depth: 944.50 m
Surface Hole Latitude: 50.032303
Surface Hole Longitude: -111.781007

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-12-08 Obtained License
1979-04-07 Perforation Treatment Performed - Open-Hole Completion
1979-04-08 Perforation Treatment Performed - Jet Perforation
1981-03-19 Finished Drilling
1981-03-19 Well Mode changed to Drilled and Cased
1981-03-22 Liner Casing Operation Performed
1981-03-22 Perforation Treatment Performed - Cement Squeeze
1981-04-02 Perforation Treatment Performed - Jet Perforation
1981-04-03 Perforation Treatment Performed - Cement Squeeze
1981-04-07 Perforation Treatment Performed - Jet Perforation
1981-04-09 Perforation Treatment Performed - Cement Squeeze
1981-04-11 Perforation Treatment Performed - Jet Perforation
1981-04-12 Perforation Treatment Performed - Cement Squeeze
1981-04-17 Perforation Treatment Performed - Jet Perforation
1981-04-17 Well Began Production
1981-04-17 Well Fluid changed to Crude Oil
1981-04-17 Well Mode changed to Pumping
1989-06-08 Well Log Performed
1989-06-09 Well Log Performed
1989-06-11 Perforation Treatment Performed - Cement Squeeze
1989-06-11 Plug Back Performed
1989-06-11 Well Fluid changed to Crude Oil
1989-06-11 Well Mode changed to Abandoned Zone
1989-06-13 Well Log Performed
1989-06-14 Perforation Treatment Performed - Jet Perforation
1992-11-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-11-24 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-04-07 Open Hole/Barefoot Completion 930.00 939.30 0
1981-04-17 Perforation 942.00 943.00 13
1989-06-11 Cement Squeeze 942.00 943.00 0
1989-06-14 Perforation 936.00 938.50 13
1992-11-24 Packing Device Capped w/Cement 897.00 905.00 0
1979-04-08 Perforation 936.60 938.10 13
1981-03-22 Cement Squeeze 930.00 939.30 0
1981-04-02 Perforation 935.00 935.50 13
1981-04-03 Cement Squeeze 935.00 935.50 0
1981-04-07 Perforation 942.00 943.00 12
1981-04-09 Cement Squeeze 942.00 943.00 0
1981-04-11 Perforation 942.00 943.00 13
1981-04-12 Cement Squeeze 942.00 943.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 5834 0.0 0.0 0.0
1982 5492 0.0 0.0 0.0
1983 7497 0.0 0.0 0.0
1984 8608 0.0 0.0 0.0
1985 8661 0.0 0.0 0.0
1986 8623 0.0 0.0 0.0
1987 8723 0.0 0.0 0.0
1988 8736 0.0 0.0 0.0
1989 3589 0.0 0.0 0.0

For data sources see[5]

References