X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0124153116020

Well Details

Well ID: 0124153116020
Loading map...
Location: 02/16-31-012-15W4/0
Location Alias: 02/16-31-12-15 W4M
Location Alias 2: 02/16-31-012-15 W4/00
Country: Canada
Province: Alberta
Township: 012
Meridian: 4
Range: 15
Section: 31
County/Municipality: Municipal District of Taber
Well Name: NORCEN POR ENCHANT 16-31S-12-15
Operator Name: Canadian Natural Resources Limited
License Number: 0148256
License Date: 1991-03-05
License Status: Suspension
Spud Date: 1991-03-20
Final Drill Date: 1991-03-26
Well Total Depth: 990.00 m
Surface Hole Latitude: 50.046383
Surface Hole Longitude: -112.032090

For data sources see[1][2]

Well History

Date Event
1991-03-05 Obtained License
1991-03-20 Surface Casing Operation Performed
1991-03-26 Finished Drilling
1991-03-26 Well Mode changed to Drilled and Cased
1991-03-27 Production Casing Operation Performed
1991-03-27 Well Log Performed
1991-03-28 Rig Released
1991-04-09 Well Log Performed
1991-04-10 Perforation Treatment Performed - Jet Perforation
1991-04-10 Well Log Performed
1991-05-05 Well Began Production
1991-05-05 Well Fluid changed to Crude Oil
1991-05-05 Well Mode changed to Flowing
1995-11-09 Perforation Treatment Performed - Jet Perforation
1995-11-09 Well Log Performed
1996-05-01 Perforation Treatment Performed - Jet Perforation
1997-10-18 Perforation Treatment Performed - Jet Perforation
1997-10-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-10-19 Perforation Treatment Performed - Cement Squeeze
1997-10-22 Perforation Treatment Performed - Jet Perforation
1997-10-22 Well Fluid changed to Crude Oil
1997-10-22 Well Mode changed to Pumping
2003-03-20 Well Fluid changed to Crude Oil
2003-03-20 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1991-04-10 Perforation 963.50 964.00 13
1991-04-10 Perforation 964.80 965.50 13
1995-11-09 Perforation 969.00 969.80 18
1996-05-01 Perforation 965.50 968.00 18
1997-10-18 Perforation 972.00 972.50 13
1997-10-19 Acid Treatment 963.50 972.50 0
1997-10-19 Cement Squeeze 963.50 972.50 0
1997-10-22 Perforation 963.00 965.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1991 5091 0.0 0.0 0.0
1992 5500 0.0 0.0 0.0
1993 6086 0.0 0.0 0.0
1994 7586 0.0 0.0 0.0
1995 4232 0.0 0.0 0.0
1996 1287 0.0 0.0 0.0
1997 1551 0.0 0.0 0.0
1998 2419 0.0 0.0 0.0
1999 2639 0.0 0.0 0.0

For data sources see[5]

References