X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0124153210034

Well Details

Well ID: 0124153210034
Loading map...
Location: 03/10-32-012-15W4/4
Location Alias: 03/10-32-12-15 W4M
Location Alias 2: 03/10-32-012-15 W4/04
Country: Canada
Province: Alberta
Township: 012
Meridian: 4
Range: 15
Section: 32
County/Municipality: Municipal District of Taber
Well Name: CNRL ENCHANT 10-32-12-15
Operator Name: Canadian Natural Resources Limited
License Number: 0144119
License Date: 1990-05-09
License Status: Abandoned
Spud Date: 1990-05-11
Final Drill Date: 1990-05-28
Well Total Depth: 1381.00 m
Surface Hole Latitude: 50.043490
Surface Hole Longitude: -112.013224

For data sources see[1][2]

Well History

Date Event
1990-05-09 Obtained License
1990-05-12 Surface Casing Operation Performed
1990-05-13 Kick Occurred
1990-05-16 Kick Occurred
1990-05-26 Kick Occurred
1990-05-28 Finished Drilling
1990-05-28 Well Log Performed
1990-05-28 Well Mode changed to Drilled and Cased
1990-05-31 Production Casing Operation Performed
1990-05-31 Rig Released
1990-06-09 Well Log Performed
1990-06-10 Perforation Treatment Performed - Jet Perforation
1990-06-10 Well Log Performed
1990-06-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-06-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-07-28 Well Log Performed
1990-07-29 Perforation Treatment Performed - Jet Perforation
1990-07-29 Well Log Performed
1990-07-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-09-01 Perforation Treatment Performed - Fractured
1997-06-11 Well Log Performed
1997-06-14 Perforation Treatment Performed - Fractured
2004-11-08 Perforation Treatment Performed - Jet Perforation
2009-11-17 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-04-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-04-21 Perforation Treatment Performed - Jet Perforation
2010-04-21 Plug Back Performed
2010-04-22 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-09-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-09-01 Perforation Treatment Performed - Jet Perforation
2010-09-01 Plug Back Performed
2010-09-02 Well Began Production
2010-09-02 Well Fluid changed to Crude Oil
2010-09-02 Well Mode changed to Pumping
2011-09-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-09-25 Plug Back Performed
2011-09-25 Well Fluid changed to Crude Oil
2011-09-25 Well Mode changed to Abandoned Zone
2011-11-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-11-01 Perforation Treatment Performed - Jet Perforation
2011-11-01 Plug Back Performed
2011-11-02 Perforation Treatment Performed - Cement Squeeze
2011-11-02 Perforation Treatment Performed - Jet Perforation
2011-11-02 Plug Back Performed
2011-11-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-11-14 Plug Back Performed
2011-11-14 Well Abandoned
2011-11-14 Well Fluid changed to Crude Oil
2011-11-14 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-06-10 Perforation 1349.00 1351.50 13
2009-11-17 Acid Treatment 1346.50 1351.50 0
2009-11-17 Acid Treatment 1328.00 1336.00 0
2010-04-21 Packing Device Capped w/Cement 1312.00 1320.00 0
2010-04-21 Perforation 1244.00 1247.00 17
2010-04-22 Acid Treatment 1244.00 1247.00 0
2010-09-01 Packing Device Capped w/Cement 1230.00 1238.00 0
2010-09-01 Perforation 973.50 977.00 17
2010-09-01 Perforation 970.00 973.50 17
2011-09-25 Packing Device Capped w/Cement 957.00 965.00 0
2011-11-01 Perforation 525.00 526.00 17
1990-06-11 Acid Treatment 1349.00 1351.50 0
2011-11-01 Packing Device Capped w/Cement 510.00 518.00 0
2011-11-01 Perforation 323.00 324.00 17
2011-11-01 Packing Device Capped w/Cement 309.00 317.00 0
2011-11-01 Perforation 225.00 226.00 17
2011-11-02 Perforation 304.00 305.00 17
2011-11-02 Perforation 300.00 301.00 17
2011-11-02 Cement Squeeze 304.00 305.00 0
2011-11-02 Cement Squeeze 300.00 301.00 0
2011-11-14 Packing Device Capped w/Cement 212.00 220.00 0
1990-06-14 Acid Treatment 1349.00 1351.50 0
1990-07-29 Perforation 1331.00 1336.00 10
1990-07-30 Acid Treatment 1331.00 1336.00 0
1990-09-01 Fracture 1349.00 1351.00 0
1997-06-14 Fracture 1331.00 1336.00 0
2004-11-08 Perforation 1346.50 1349.00 17
2004-11-08 Perforation 1328.00 1331.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 886 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1990-05-13 Kick 237.00 237.00
1990-05-16 Kick 823.00 823.00
1990-05-16 Kick 856.00 856.00
1990-05-26 Kick 1300.00 1300.00

For data sources see[6]

References