X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0124153608000

Well Details

Well ID: 0124153608000
Loading map...
Location: 00/08-36-012-15W4/0
Location Alias: 00/08-36-12-15 W4M
Location Alias 2: 00/08-36-012-15 W4/00
Country: Canada
Province: Alberta
Township: 012
Meridian: 4
Range: 15
Section: 36
County/Municipality: Municipal District of Taber
Well Name: NORCEN POR ET AL HAYS 8-36-12-15
Operator Name: Canadian Natural Resources Limited
License Number: 0113586
License Date: 1985-02-25
License Status: Suspension
Spud Date: 1985-03-13
Final Drill Date: 1985-04-07
Well Total Depth: 1875.00 m
Surface Hole Latitude: 50.039111
Surface Hole Longitude: -111.918253

For data sources see[1][2]

Well History

Date Event
1985-02-25 Obtained License
1985-03-14 Surface Casing Operation Performed
1985-03-16 Kick Occurred
1985-03-29 Well Log Performed
1985-04-07 Finished Drilling
1985-04-07 Well Log Performed
1985-04-07 Well Mode changed to Drilled and Cased
1985-04-08 Well Log Performed
1985-04-09 Plug Back Performed
1985-04-10 Production Casing Operation Performed
1985-04-10 Rig Released
1985-04-23 Well Log Performed
1985-04-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-04-24 Perforation Treatment Performed - Jet Perforation
1985-04-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-04-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-04-27 Plug Back Performed
1985-04-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-04-28 Perforation Treatment Performed - Jet Perforation
1985-04-30 Perforation Treatment Performed - Jet Perforation
1985-05-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-05-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-05-08 Plug Back Performed
1985-05-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-05-09 Perforation Treatment Performed - Jet Perforation
1985-05-11 Perforation Treatment Performed - Cement Squeeze
1985-05-11 Plug Back Performed
1985-05-12 Perforation Treatment Performed - Jet Perforation
1985-05-14 Perforation Treatment Performed - Cement Squeeze
1985-05-14 Plug Back Performed
1985-05-15 Perforation Treatment Performed - Jet Perforation
1985-05-16 Perforation Treatment Performed - Jet Perforation
1985-05-17 Perforation Treatment Performed - Cement Squeeze
1985-05-22 Perforation Treatment Performed - Jet Perforation
1985-05-22 Well Began Production
1985-05-22 Well Fluid changed to Crude Oil
1985-05-22 Well Mode changed to Flowing
1985-08-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-08-27 Perforation Treatment Performed - Jet Perforation
1985-08-27 Well Log Performed
1985-08-28 Perforation Treatment Performed - Cement Squeeze
1985-09-27 Well Fluid changed to Crude Oil
1985-09-27 Well Mode changed to Suspended
1993-09-12 Perforation Treatment Performed - Jet Perforation
1993-10-01 Well Fluid changed to Crude Oil
1993-10-01 Well Mode changed to Suspended
2005-11-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-11-02 Plug Back Performed
2005-11-02 Well Log Performed
2005-11-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-11-08 Plug Back Performed
2005-11-09 Perforation Treatment Performed - Jet Perforation
2005-11-16 Perforation Treatment Performed - Fractured
2006-07-17 Perforation Treatment Performed - Acid Squeeze - Press Used
2006-07-17 Perforation Treatment Performed - Cement Squeeze
2006-07-17 Plug Back Performed
2006-07-20 Perforation Treatment Performed - Acid Squeeze - Press Used
2006-07-20 Perforation Treatment Performed - Cement Squeeze
2006-07-20 Plug Back Performed
2006-07-25 Perforation Treatment Performed - Acid Squeeze - Press Used
2006-07-25 Perforation Treatment Performed - Cement Squeeze
2006-07-25 Plug Back Performed
2006-07-27 Perforation Treatment Performed - Jet Perforation
2006-07-28 Perforation Treatment Performed - Jet Perforation
2006-07-29 Perforation Treatment Performed - Cement Squeeze
2006-07-29 Plug Back Performed
2006-07-29 Well Fluid changed to Crude Oil
2006-07-29 Well Mode changed to Abandoned Zone
2006-08-01 Perforation Treatment Performed - Jet Perforation
2006-08-06 Perforation Treatment Performed - Cement Squeeze
2006-08-06 Plug Back Performed
2006-08-28 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-04-24 Perforation 1357.00 1358.50 13
1985-05-08 Packing Device Capped w/Cement 1312.00 1320.00 0
1985-05-09 Perforation 1252.00 1253.00 13
1985-05-09 Acid Treatment 1252.00 1253.00 0
1985-05-11 Cement Squeeze 1252.00 1253.00 0
1985-05-12 Perforation 1202.00 1205.00 7
1985-05-14 Cement Squeeze 1202.00 1205.00 0
1985-05-15 Perforation 971.00 973.00 0
1985-05-16 Perforation 979.00 979.50 4
1985-05-17 Cement Squeeze 971.00 979.50 0
1985-05-22 Perforation 971.00 973.00 13
1985-04-24 Acid Treatment 1357.00 1358.50 0
1985-08-27 Perforation 975.00 975.50 7
1985-08-27 Acid Treatment 975.00 975.50 0
1985-08-28 Cement Squeeze 975.00 975.50 0
1993-09-12 Perforation 1334.00 1336.00 17
2005-11-02 Packing Device Capped w/Cement 1190.00 1198.00 0
2005-11-08 Packing Device Capped w/Cement 952.00 960.00 0
2005-11-09 Perforation 618.00 620.00 13
2005-11-09 Perforation 498.00 499.00 13
2005-11-09 Perforation 436.00 437.00 13
2005-11-16 Fracture 618.00 620.00 0
1985-04-26 Acid Treatment 1357.00 1358.50 0
2005-11-16 Fracture 436.00 499.00 0
2006-07-17 Acid Treatment 436.00 437.00 0
2006-07-17 Cement Squeeze 436.00 437.00 0
2006-07-20 Acid Treatment 498.00 499.00 0
2006-07-20 Cement Squeeze 498.00 499.00 0
2006-07-25 Acid Treatment 618.00 620.00 0
2006-07-25 Cement Squeeze 618.00 620.00 0
2006-07-27 Perforation 971.00 979.50 13
2006-07-28 Perforation 1334.00 1342.50 13
2006-07-28 Perforation 1202.00 1253.00 13
1985-04-27 Packing Device Capped w/Cement 1347.00 1355.00 0
2006-07-29 Cement Squeeze 1334.00 1342.50 0
2006-07-29 Cement Squeeze 971.00 979.50 0
2006-07-29 Cement Squeeze 1202.00 1253.00 0
2006-08-01 Perforation 1357.00 1358.50 13
2006-08-06 Cement Squeeze 1357.00 1358.50 0
2006-08-28 Perforation 1745.00 1746.50 17
1985-04-28 Perforation 1341.00 1342.50 13
1985-04-28 Acid Treatment 1341.00 1342.50 0
1985-04-30 Perforation 1334.00 1336.00 13
1985-04-30 Perforation 1337.00 1340.00 13
1985-05-02 Acid Treatment 1334.00 1342.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 2894 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1985-03-16 Kick 744.00 869.00

For data sources see[6]

References