X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0124182805002

Well Details

Well ID: 0124182805002
Loading map...
Location: 00/05-28-012-18W4/2
Location Alias: 00/05-28-12-18 W4M
Location Alias 2: 00/05-28-012-18 W4/02
Country: Canada
Province: Alberta
Township: 012
Meridian: 4
Range: 18
Section: 28
County/Municipality: Municipal District of Taber
Well Name: SLE RETLAW 5-28-12-18
Operator Name: SanLing Energy Ltd.
License Number: 0077685
License Date: 1979-08-24
License Status: Suspension
Spud Date: 1979-09-05
Final Drill Date: 1979-09-10
Well Total Depth: 1144.00 m
Surface Hole Latitude: 50.023768
Surface Hole Longitude: -112.411275

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-08-24 Obtained License
1979-09-10 Finished Drilling
1979-09-10 Well Log Performed
1979-09-10 Well Mode changed to Drilled and Cased
1979-09-11 Drill Stem Test Performed
1979-09-12 Drill Stem Test Performed
1979-09-13 Production Casing Operation Performed
1979-09-26 Perforation Treatment Performed - Jet Perforation
1980-02-08 Well Began Production
1980-02-08 Well Fluid changed to Gas
1980-02-08 Well Mode changed to Flowing
1996-10-15 Well Fluid changed to Gas
1996-10-15 Well Mode changed to Suspended
1999-02-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-02-23 Plug Back Performed
1999-02-24 Well Fluid changed to Gas
1999-02-24 Well Mode changed to Abandoned Zone
1999-03-02 Perforation Treatment Performed - Jet Perforation
1999-03-02 Plug Back Performed
1999-03-02 Well Log Performed
1999-03-06 Perforation Treatment Performed - Fractured
1999-05-25 Perforation Treatment Performed - Jet Perforation
1999-06-10 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-09-26 Perforation 1062.00 1064.00 13
1979-09-26 Perforation 855.00 856.50 13
1999-02-23 Packing Device Capped w/Cement 1022.00 1052.00 0
1999-03-02 Perforation 960.00 965.00 13
1999-03-06 Fracture 960.00 965.00 0
1999-05-25 Perforation 937.50 939.50 17
1999-06-10 Fracture 937.50 939.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 2944 0.0 0.0 0.0
1981 5225 0.0 0.0 0.0
1982 5046 0.0 0.0 0.0
1983 5289 0.0 0.0 0.0
1984 5561 0.0 0.0 0.0
1985 7931 0.0 0.0 0.0
1986 8213 0.0 0.0 0.0
1987 3186 0.0 0.0 0.0
1990 3451 0.0 0.0 0.0
1991 8424 0.0 0.0 0.0
1992 8365 0.0 0.0 0.0
1993 8550 0.0 0.0 0.0
1994 8113 0.0 0.0 0.0
1995 8616 0.0 0.0 0.0
1996 2920 0.0 0.0 0.0

For data sources see[5]

References