X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0124190206003

Well Details

Well ID: 0124190206003
Loading map...
Location: 00/06-02-012-19W4/3
Location Alias: 00/06-02-12-19 W4M
Location Alias 2: 00/06-02-012-19 W4/03
Country: Canada
Province: Alberta
Township: 012
Meridian: 4
Range: 19
Section: 02
County/Municipality: Lethbridge County
Well Name: SLE RETLAW 6-2-12-19
Operator Name: SanLing Energy Ltd.
License Number: 0191204
License Date: 1996-09-11
License Status: Issued
Spud Date: 1996-09-13
Final Drill Date: 1996-09-18
Well Total Depth: 1177.00 m
Surface Hole Latitude: 49.968161
Surface Hole Longitude: -112.496191

For data sources see[1][2]

Well History

Date Event
1996-09-11 Obtained License
1996-09-13 Well Log Performed
1996-09-14 Surface Casing Operation Performed
1996-09-15 Direction Drilling Operation Performed - Deviate
1996-09-17 Well Log Performed
1996-09-18 Finished Drilling
1996-09-18 Well Mode changed to Drilled and Cased
1996-09-19 Drill Stem Test Performed
1996-09-19 Well Log Performed
1996-09-20 Drill Stem Test Performed
1996-09-21 Drill Stem Test Performed
1996-09-23 Production Casing Operation Performed
1996-09-23 Rig Released
1996-10-01 Well Log Performed
1996-10-02 Well Log Performed
1996-10-03 Perforation Treatment Performed - Jet Perforation
1996-10-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-10-31 Perforation Treatment Performed - Jet Perforation
1996-10-31 Plug Back Performed
1996-11-02 Perforation Treatment Performed - Jet Perforation
1996-11-02 Well Began Production
1996-11-02 Well Fluid changed to Gas
1996-11-02 Well Mode changed to Flowing
2007-06-22 Perforation Treatment Performed - Jet Perforation
2007-06-24 Perforation Treatment Performed - Fractured

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1996-09-15 365.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-10-03 Perforation 1110.70 1112.50 13
1996-10-31 Packing Device Capped w/Cement 1105.00 1109.00 0
1996-10-31 Perforation 831.20 833.00 18
1996-11-02 Perforation 1097.50 1099.00 18
2007-06-22 Perforation 1058.00 1061.00 17
2007-06-22 Perforation 1054.00 1055.50 17
2007-06-24 Fracture 1054.00 1061.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 1014 0.0 0.0 0.0
1997 8653 0.0 0.0 0.0
1998 8559 0.0 0.0 0.0
1999 8536 0.0 0.0 0.0
2000 8320 0.0 0.0 0.0
2001 8402 0.0 0.0 0.0
2002 8238 0.0 0.0 0.0
2003 8302 0.0 0.0 0.0
2004 8126 0.0 0.0 0.0
2005 6167 0.0 0.0 0.0
2006 8242 0.0 0.0 0.0
2007 7779 0.0 0.0 0.0
2008 8092 0.0 0.0 0.0
2009 8650 0.0 0.0 0.0
2010 8695 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 7990 0.0 0.0 0.0
2013 8591 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8758 0.0 0.0 0.0
2016 8782 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References