If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0124280606000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.966109,"lon":-113.815967,"icon":""}]} |
Location: 00/06-06-012-28W4/0 | |
Location Alias: 00/06-06-12-28 W4M | |
Location Alias 2: 00/06-06-012-28 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 012 | |
Meridian: 4 | |
Range: 28 | |
Section: 06 | |
County/Municipality: Municipal District of Willow Creek No. 26 | |
Well Name: 979968 AB MONTY 6-6-12-28 | |
Operator Name: 979968 Alberta Ltd. | |
License Number: 0034156 | |
License Date: 1968-05-24 | |
License Status: Amended | |
Spud Date: 1968-05-29 | |
Final Drill Date: 1968-08-08 | |
Well Total Depth: 3615.50 m | |
Surface Hole Latitude: 49.966109 | |
Surface Hole Longitude: -113.815967 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1968-05-24 | Obtained License |
1968-08-08 | Finished Drilling |
1968-08-08 | Well Mode changed to Drilled and Cased |
1968-08-12 | Drill Stem Test Performed |
1968-08-14 | Production Casing Operation Performed |
1968-08-24 | Perforation Treatment Performed - Jet Perforation |
1968-08-26 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1968-08-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1968-08-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1968-08-27 | Perforation Treatment Performed - Jet Perforation |
1968-08-28 | Perforation Treatment Performed - Cement Squeeze |
1968-08-30 | Perforation Treatment Performed - Cement Squeeze |
1968-08-30 | Perforation Treatment Performed - Jet Perforation |
1968-09-01 | Perforation Treatment Performed - Jet Perforation |
1968-09-02 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1968-09-02 | Well Began Production |
1968-09-02 | Well Fluid changed to Crude Oil |
1968-09-02 | Well Mode changed to Flowing |
1984-03-07 | Well Fluid changed to Crude Oil |
1984-03-07 | Well Mode changed to Pumping |
1994-08-20 | Perforation Treatment Performed - Jet Perforation |
1994-08-20 | Well Log Performed |
1995-11-06 | Perforation Treatment Performed - Cement Squeeze |
1995-11-14 | Perforation Treatment Performed - Jet Perforation |
1995-11-14 | Well Log Performed |
1995-11-17 | Perforation Treatment Performed - Fractured |
1995-11-23 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1995-11-23 | Plug Back Performed |
1995-11-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1995-11-24 | Perforation Treatment Performed - Jet Perforation |
1995-11-24 | Perforation Treatment Performed - Remedial Casing |
1995-11-24 | Well Fluid changed to Crude Oil |
1995-11-24 | Well Log Performed |
1995-11-24 | Well Mode changed to Abandoned and Re-entered |
1995-11-25 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1968-08-24 | Perforation | 2974.80 | 2984.00 | 7 |
1968-08-30 | Cement Squeeze | 2468.60 | 2468.90 | 0 |
1968-09-01 | Perforation | 2557.60 | 2561.80 | 7 |
1968-09-02 | Acid Treatment | 2557.60 | 2561.80 | 0 |
1994-08-20 | Perforation | 2559.80 | 2561.80 | 13 |
1995-11-06 | Cement Squeeze | 2557.60 | 2561.80 | 0 |
1995-11-14 | Perforation | 2615.20 | 2618.20 | 18 |
1995-11-17 | Fracture | 2615.20 | 2618.20 | 0 |
1995-11-23 | Packing Device Capped w/Cement | 2597.00 | 2605.00 | 0 |
1995-11-24 | Packing Device Capped w/Cement | 2535.00 | 2543.00 | 0 |
1995-11-24 | Perforation | 514.00 | 515.00 | 13 |
1968-08-26 | Acid Treatment | 2974.80 | 2984.00 | 0 |
1995-11-24 | Remedial Casing Cementing | 514.00 | 515.00 | 0 |
1968-08-27 | Packing Device Capped w/Cement | 2962.40 | 2962.40 | 0 |
1968-08-27 | Perforation | 947.90 | 955.50 | 7 |
1968-08-27 | Acid Treatment | 947.90 | 955.50 | 0 |
1968-08-28 | Cement Squeeze | 947.90 | 955.50 | 0 |
1968-08-30 | Perforation | 2590.50 | 2590.80 | 16 |
1968-08-30 | Perforation | 2468.60 | 2468.90 | 16 |
1968-08-30 | Cement Squeeze | 2590.50 | 2590.80 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1968 | 144 | 0.0 | 0.0 | 0.0 |
1969 | 1178 | 0.0 | 0.0 | 0.0 |
1970 | 2351 | 0.0 | 0.0 | 0.0 |
1971 | 2414 | 0.0 | 0.0 | 0.0 |
1972 | 4699 | 0.0 | 0.0 | 0.0 |
1973 | 8395 | 0.0 | 0.0 | 0.0 |
1974 | 8316 | 0.0 | 0.0 | 0.0 |
1975 | 7580 | 0.0 | 0.0 | 0.0 |
1976 | 7380 | 0.0 | 0.0 | 0.0 |
1977 | 6798 | 0.0 | 0.0 | 0.0 |
1978 | 7467 | 0.0 | 0.0 | 0.0 |
1979 | 7673 | 0.0 | 0.0 | 0.0 |
1980 | 6586 | 0.0 | 0.0 | 0.0 |
1981 | 6321 | 0.0 | 0.0 | 0.0 |
1982 | 6627 | 0.0 | 0.0 | 0.0 |
1983 | 7448 | 0.0 | 0.0 | 0.0 |
1984 | 6111 | 0.0 | 0.0 | 0.0 |
1985 | 4152 | 0.0 | 0.0 | 0.0 |
1986 | 6120 | 0.0 | 0.0 | 0.0 |
1987 | 6149 | 0.0 | 0.0 | 0.0 |
1988 | 7916 | 0.0 | 0.0 | 0.0 |
1989 | 6112 | 0.0 | 0.0 | 0.0 |
1990 | 7670 | 0.0 | 0.0 | 0.0 |
1991 | 7827 | 0.0 | 0.0 | 0.0 |
1992 | 8686 | 0.0 | 0.0 | 0.0 |
1993 | 8737 | 0.0 | 0.0 | 0.0 |
1994 | 2790 | 0.0 | 0.0 | 0.0 |
For data sources see[5]