X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0134042611000

Well Details

Well ID: 0134042611000
Loading map...
Location: 00/11-26-013-04W4/0
Location Alias: 00/11-26-13-04 W4M
Location Alias 2: 00/11-26-013-04 W4/00
Country: Canada
Province: Alberta
Township: 013
Meridian: 4
Range: 04
Section: 26
County/Municipality: Cypress County
Well Name: Canlin MEDHAT 11-26-13-4
Operator Name: Canlin Energy Corporation
License Number: 0042618
License Date: 1972-05-30
License Status: Suspension
Spud Date: 1972-05-31
Final Drill Date: 1972-06-01
Well Total Depth: 379.50 m
Surface Hole Latitude: 50.116937
Surface Hole Longitude: -110.453890

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1972-05-30 Obtained License
1972-06-01 Finished Drilling
1972-06-01 Production Casing Operation Performed
1972-06-16 Perforation Treatment Performed - Selective Bullet Perforations
1972-06-17 Perforation Treatment Performed - Fractured
1972-06-20 Perforation Treatment Performed - Fractured
1973-05-04 Well Mode changed to Drilled and Cased
1974-11-19 Well Began Production
1974-11-19 Well Fluid changed to Gas
1974-11-19 Well Mode changed to Flowing
2010-04-21 Well Fluid changed to Gas
2010-04-21 Well Mode changed to Suspended
2017-12-01 Well Fluid changed to Gas
2017-12-01 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1972-06-16 Selective Bullet Perforations 292.90 293.20 3
1972-06-16 Selective Bullet Perforations 350.20 350.80 3
1972-06-16 Selective Bullet Perforations 353.90 354.50 3
1972-06-16 Selective Bullet Perforations 358.10 358.70 3
1972-06-16 Selective Bullet Perforations 359.70 360.30 3
1972-06-16 Selective Bullet Perforations 360.90 361.20 3
1972-06-16 Selective Bullet Perforations 363.00 363.60 3
1972-06-16 Selective Bullet Perforations 364.20 365.20 3
1972-06-16 Selective Bullet Perforations 366.40 366.70 3
1972-06-16 Selective Bullet Perforations 367.00 367.30 3
1972-06-16 Selective Bullet Perforations 367.90 368.20 3
1972-06-16 Selective Bullet Perforations 299.90 300.20 3
1972-06-16 Selective Bullet Perforations 370.30 370.90 3
1972-06-17 Fracture 350.20 370.90 0
1972-06-20 Fracture 292.90 347.50 0
1972-06-16 Selective Bullet Perforations 302.10 302.40 3
1972-06-16 Selective Bullet Perforations 311.80 312.10 3
1972-06-16 Selective Bullet Perforations 317.90 318.20 3
1972-06-16 Selective Bullet Perforations 319.70 320.00 3
1972-06-16 Selective Bullet Perforations 344.10 344.70 7
1972-06-16 Selective Bullet Perforations 346.30 346.60 3
1972-06-16 Selective Bullet Perforations 347.50 347.80 3

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1974 1464 0.0 0.0 0.0
1975 8187 0.0 0.0 0.0
1976 8680 0.0 0.0 0.0
1977 8747 0.0 0.0 0.0
1978 8462 0.0 0.0 0.0
1979 7581 0.0 0.0 0.0
1980 8122 0.0 0.0 0.0
1981 8704 0.0 0.0 0.0
1982 8736 0.0 0.0 0.0
1983 3382 0.0 0.0 0.0
1984 8010 0.0 0.0 0.0
1985 5802 0.0 0.0 0.0
1986 4247 0.0 0.0 0.0
1987 4449 0.0 0.0 0.0
1988 8056 0.0 0.0 0.0
1989 6480 0.0 0.0 0.0
1990 2832 0.0 0.0 0.0
1991 5821 0.0 0.0 0.0
1992 3821 0.0 0.0 0.0
1993 8397 0.0 0.0 0.0
1994 8608 0.0 0.0 0.0
1995 8750 0.0 0.0 0.0
1996 8561 0.0 0.0 0.0
1997 8683 0.0 0.0 0.0
1998 8691 0.0 0.0 0.0
1999 7262 0.0 0.0 0.0
2000 8039 0.0 0.0 0.0
2001 4343 0.0 0.0 0.0
2002 6599 0.0 0.0 0.0
2003 8582 0.0 0.0 0.0
2004 8567 0.0 0.0 0.0
2005 8601 0.0 0.0 0.0
2006 8439 0.0 0.0 0.0
2007 8493 0.0 0.0 0.0
2008 7964 0.0 0.0 0.0
2009 8735 0.0 0.0 0.0
2010 2139 0.0 0.0 0.0
2017 744 0.0 0.0 0.0
2018 8123 0.0 0.0 0.0
2019 7502 0.0 0.0 0.0
2020 1390 0.0 0.0 0.0

For data sources see[5]

References