X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0134123016000

Well Details

Well ID: 0134123016000
Loading map...
Location: 00/16-30-013-12W4/0
Location Alias: 00/16-30-13-12 W4M
Location Alias 2: 00/16-30-013-12 W4/00
Country: Canada
Province: Alberta
Township: 013
Meridian: 4
Range: 12
Section: 30
County/Municipality: Cypress County
Well Name: URL VIJAYA GRDFKS 16-30-13-12
Operator Name: Unified Resources Ltd.
License Number: 0135724
License Date: 1988-08-23
License Status: RecCertified
Spud Date: 1988-08-25
Final Drill Date: 1988-08-29
Well Total Depth: 980.00 m
Surface Hole Latitude: 50.120008
Surface Hole Longitude: -111.623724

For data sources see[1][2]

Well History

Date Event
1988-08-23 Obtained License
1988-08-26 Surface Casing Operation Performed
1988-08-29 Drill Stem Test Performed
1988-08-29 Finished Drilling
1988-08-29 Well Log Performed
1988-08-29 Well Mode changed to Drilled and Cased
1988-08-30 Production Casing Operation Performed
1988-08-31 Rig Released
1988-09-02 Well Log Performed
1988-09-05 Perforation Treatment Performed - Jet Perforation
1988-09-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-09-23 Perforation Treatment Performed - Cement Squeeze
1988-09-23 Perforation Treatment Performed - Jet Perforation
1988-09-23 Well Log Performed
1988-09-25 Perforation Treatment Performed - Jet Perforation
1988-09-25 Well Log Performed
1988-09-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-12-10 Well Began Production
1988-12-10 Well Fluid changed to Crude Oil
1988-12-10 Well Mode changed to Pumping
1989-02-18 Well Fluid changed to Crude Oil
1989-02-18 Well Mode changed to Suspended
1989-05-11 Perforation Treatment Performed - Cement Squeeze
1989-05-15 Perforation Treatment Performed - Jet Perforation
1989-05-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-05-16 Well Log Performed
1989-06-01 Well Began Injection
1989-06-01 Well Fluid changed to Water
1989-06-01 Well Type changed to Disposal
1990-02-01 Perforation Treatment Performed - Cement Squeeze
1990-02-01 Well Fluid changed to Water
1990-02-01 Well Mode changed to Suspended
1990-02-01 Well Type changed to Disposal
1992-02-14 Well Fluid changed to Water
1992-02-14 Well Mode changed to Closed
1992-02-14 Well Type changed to Disposal
1998-09-17 Well Log Performed
1998-09-22 Well Log Performed
1999-06-23 Perforation Treatment Performed - Jet Perforation
1999-06-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-06-24 Perforation Treatment Performed - Cement Plug
1999-06-24 Perforation Treatment Performed - Remedial Casing
1999-09-02 Well Abandoned
1999-09-02 Well Fluid changed to Water
1999-09-02 Well Mode changed to Abandoned
1999-09-02 Well Type changed to Disposal

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-09-05 Perforation 941.00 944.00 13
1990-02-01 Cement Squeeze 952.60 961.80 0
1999-06-23 Perforation 676.00 677.00 14
1999-06-24 Acid Treatment 676.00 677.00 0
1999-06-24 Remedial Casing Cementing 676.00 677.00 0
1999-06-24 Cement Plug 616.00 692.00 0
1988-09-06 Acid Treatment 941.00 944.00 0
1988-09-23 Perforation 947.00 948.00 13
1988-09-23 Cement Squeeze 941.00 948.00 0
1988-09-25 Perforation 941.00 944.00 13
1988-09-28 Acid Treatment 941.00 944.00 0
1989-05-11 Cement Squeeze 941.00 944.00 0
1989-05-15 Perforation 952.60 961.80 13
1989-05-16 Acid Treatment 952.60 961.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 720 0.0 0.0 0.0
1989 1020 0.0 0.0 0.0

For data sources see[5]

References