X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0134150608000

Well Details

Well ID: 0134150608000
Loading map...
Location: 00/08-06-013-15W4/0
Location Alias: 00/08-06-13-15 W4M
Location Alias 2: 00/08-06-013-15 W4/00
Country: Canada
Province: Alberta
Township: 013
Meridian: 4
Range: 15
Section: 06
County/Municipality: Municipal District of Taber
Well Name: NORCEN ET AL ENCHANT 8-6-13-15
Operator Name: Canadian Natural Resources Limited
License Number: 0150891
License Date: 1991-12-05
License Status: Suspension
Spud Date: 1991-12-09
Final Drill Date: 1991-12-12
Well Total Depth: 998.00 m
Surface Hole Latitude: 50.052487
Surface Hole Longitude: -112.030481

For data sources see[1][2]

Well History

Date Event
1991-12-05 Obtained License
1991-12-10 Surface Casing Operation Performed
1991-12-12 Finished Drilling
1991-12-12 Well Log Performed
1991-12-12 Well Mode changed to Drilled and Cased
1991-12-13 Production Casing Operation Performed
1991-12-13 Rig Released
1992-01-02 Well Log Performed
1992-01-03 Well Log Performed
1992-01-04 Perforation Treatment Performed - Jet Perforation
1992-01-10 Well Began Production
1992-01-10 Well Fluid changed to Crude Oil
1992-01-10 Well Mode changed to Pumping
1997-10-01 Well Fluid changed to Crude Oil
1997-10-01 Well Mode changed to Suspended
2005-10-03 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-10-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-10-04 Plug Back Performed
2005-10-04 Well Fluid changed to Crude Oil
2005-10-04 Well Log Performed
2005-10-04 Well Mode changed to Abandoned Zone
2005-10-05 Perforation Treatment Performed - Jet Perforation
2005-10-06 Perforation Treatment Performed - Jet Perforation
2006-01-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-01-26 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1992-01-04 Perforation 966.00 966.80 14
2005-10-03 Acid Treatment 966.00 966.80 0
2005-10-04 Packing Device Capped w/Cement 952.00 960.00 0
2005-10-05 Perforation 703.90 704.90 17
2005-10-06 Perforation 711.00 712.00 17
2006-01-26 Packing Device Capped w/Cement 690.00 698.00 0
2006-01-26 Perforation 609.00 611.00 14

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1992 5726 0.0 0.0 0.0
1993 2362 0.0 0.0 0.0
1994 5045 0.0 0.0 0.0
1995 2131 0.0 0.0 0.0

For data sources see[5]

References