X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0134150914000

Well Details

Well ID: 0134150914000
Loading map...
Location: 00/14-09-013-15W4/0
Location Alias: 00/14-09-13-15 W4M
Location Alias 2: 00/14-09-013-15 W4/00
Country: Canada
Province: Alberta
Township: 013
Meridian: 4
Range: 15
Section: 09
County/Municipality: Municipal District of Taber
Well Name: NORCEN POR ET AL ENCHANT 14-9-13-15
Operator Name: Canadian Natural Resources Limited
License Number: 0133019
License Date: 1988-03-10
License Status: Issued
Spud Date: 1988-03-11
Final Drill Date: 1988-03-21
Well Total Depth: 1395.00 m
Surface Hole Latitude: 50.073728
Surface Hole Longitude: -111.997085

For data sources see[1][2]

Well History

Date Event
1988-03-10 Obtained License
1988-03-11 Surface Casing Operation Performed
1988-03-21 Finished Drilling
1988-03-21 Well Mode changed to Drilled and Cased
1988-03-22 Well Log Performed
1988-03-23 Production Casing Operation Performed
1988-03-24 Rig Released
1988-03-28 Perforation Treatment Performed - Jet Perforation
1988-03-29 Perforation Treatment Performed - Fractured
1988-04-07 Well Began Production
1988-04-07 Well Fluid changed to Crude Oil
1988-04-07 Well Mode changed to Pumping
1992-07-16 Perforation Treatment Performed - Jet Perforation
1992-07-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-09-05 Perforation Treatment Performed - Fractured
2002-07-24 Perforation Treatment Performed - Jet Perforation
2002-08-02 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-08-02 Perforation Treatment Performed - Fractured
2002-08-22 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-03-28 Perforation 1336.00 1338.00 13
1988-03-29 Fracture 1336.00 1338.00 0
1992-07-16 Perforation 1331.50 1335.50 17
1992-07-17 Acid Treatment 1331.50 1335.50 0
1996-09-05 Fracture 1331.50 1338.00 0
2002-07-24 Perforation 1350.00 1353.00 17
2002-08-02 Acid Treatment 1350.00 1353.00 0
2002-08-02 Fracture 1350.00 1353.00 0
2002-08-22 Acid Treatment 1350.00 1353.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 2727 0.0 0.0 0.0
1991 6924 0.0 0.0 0.0
1992 8171 0.0 0.0 0.0
1993 7563 0.0 0.0 0.0
1994 8228 0.0 0.0 0.0
1995 8402 0.0 0.0 0.0
1996 8032 0.0 0.0 0.0
1997 8242 0.0 0.0 0.0
1998 8296 0.0 0.0 0.0
1999 8317 0.0 0.0 0.0
2000 8629 0.0 0.0 0.0
2001 8227 0.0 0.0 0.0
2002 7678 0.0 0.0 0.0
2003 8357 0.0 0.0 0.0
2004 8413 0.0 0.0 0.0
2005 8539 0.0 0.0 0.0
2006 8467 0.0 0.0 0.0
2007 8421 0.0 0.0 0.0
2008 8745 0.0 0.0 0.0
2009 8695 0.0 0.0 0.0
2010 8251 0.0 0.0 0.0
2011 8620 0.0 0.0 0.0
2012 8375 0.0 0.0 0.0
2013 8598 0.0 0.0 0.0
2014 8652 0.0 0.0 0.0
2015 8611 0.0 0.0 0.0
2016 8669 0.0 0.0 0.0
2017 8666 0.0 0.0 0.0
2018 8589 0.0 0.0 0.0
2019 8641 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References