X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0134151104000

Well Details

Well ID: 0134151104000
Loading map...
Location: 00/04-11-013-15W4/0
Location Alias: 00/04-11-13-15 W4M
Location Alias 2: 00/04-11-013-15 W4/00
Country: Canada
Province: Alberta
Township: 013
Meridian: 4
Range: 15
Section: 11
County/Municipality: Municipal District of Taber
Well Name: CNRL HAYS 4-11-13-15
Operator Name: Canadian Natural Resources Limited
License Number: 0286459
License Date: 2003-04-29
License Status: Issued
Spud Date: 2003-05-21
Final Drill Date: 2003-05-28
Well Total Depth: 1360.00 m
Surface Hole Latitude: 50.064236
Surface Hole Longitude: -111.957357

For data sources see[1][2]

Well History

Date Event
2003-04-29 Obtained License
2003-05-22 Surface Casing Operation Performed
2003-05-28 Finished Drilling
2003-05-28 Well Mode changed to Drilled and Cased
2003-05-29 Drill Stem Test Performed
2003-05-29 Well Log Performed
2003-05-30 Production Casing Operation Performed
2003-05-31 Rig Released
2003-06-04 Well Log Performed
2003-06-09 Perforation Treatment Performed - Jet Perforation
2003-06-09 Well Log Performed
2003-06-11 Perforation Treatment Performed - Fractured
2003-06-19 Well Began Production
2003-06-19 Well Fluid changed to Crude Oil
2003-06-19 Well Mode changed to Pumping
2004-02-25 Perforation Treatment Performed - Jet Perforation
2004-02-25 Well Log Performed
2004-02-26 Perforation Treatment Performed - Remedial Casing
2004-07-27 Well Fluid changed to Crude Oil
2004-07-27 Well Mode changed to Suspended
2004-07-29 Perforation Treatment Performed - Jet Perforation
2004-07-29 Well Log Performed
2004-07-31 Perforation Treatment Performed - Fractured
2005-04-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-04-08 Well Fluid changed to Crude Oil
2005-04-08 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2003-06-09 Perforation 1330.00 1332.50 17
2004-07-31 Fracture 1317.00 1322.00 0
2005-04-05 Acid Treatment 1317.00 1322.00 0
2003-06-09 Perforation 1335.50 1336.80 17
2003-06-09 Perforation 1337.50 1339.50 17
2003-06-11 Fracture 1330.00 1332.50 0
2003-06-11 Fracture 1335.50 1336.80 0
2003-06-11 Fracture 1337.50 1339.50 0
2004-02-25 Perforation 475.00 475.20 20
2004-02-26 Remedial Casing Cementing 475.00 475.20 0
2004-07-29 Perforation 1317.00 1322.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 4205 0.0 0.0 0.0
2004 4722 0.0 0.0 0.0
2005 5880 0.0 0.0 0.0
2006 8096 0.0 0.0 0.0
2007 7692 0.0 0.0 0.0
2008 8655 0.0 0.0 0.0
2009 8661 0.0 0.0 0.0
2010 8386 0.0 0.0 0.0
2011 8739 0.0 0.0 0.0
2012 8699 0.0 0.0 0.0
2013 8669 0.0 0.0 0.0
2014 8737 0.0 0.0 0.0
2015 8182 0.0 0.0 0.0
2016 7993 0.0 0.0 0.0
2017 8419 0.0 0.0 0.0
2018 8508 0.0 0.0 0.0
2019 5189 0.0 0.0 0.0

For data sources see[5]

References