X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0134161404000

Well Details

Well ID: 0134161404000
Loading map...
Location: 00/04-14-013-16W4/0
Location Alias: 00/04-14-13-16 W4M
Location Alias 2: 00/04-14-013-16 W4/00
Country: Canada
Province: Alberta
Township: 013
Meridian: 4
Range: 16
Section: 14
County/Municipality: Municipal District of Taber
Well Name: NORCEN ENCHANT 4-14-13-16
Operator Name: Canadian Natural Resources Limited
License Number: 0184138
License Date: 1996-01-04
License Status: Issued
Spud Date: 1996-01-08
Final Drill Date: 1996-01-16
Well Total Depth: 1478.00 m
Surface Hole Latitude: 50.081803
Surface Hole Longitude: -112.093532

For data sources see[1][2]

Well History

Date Event
1996-01-04 Obtained License
1996-01-09 Surface Casing Operation Performed
1996-01-10 Direction Drilling Operation Performed - Deviate
1996-01-16 Finished Drilling
1996-01-16 Well Mode changed to Drilled and Cased
1996-01-17 Well Log Performed
1996-01-18 Production Casing Operation Performed
1996-01-18 Well Log Performed
1996-01-19 Rig Released
1996-04-18 Well Log Performed
1996-05-08 Perforation Treatment Performed - Jet Perforation
1996-05-10 Perforation Treatment Performed - Fractured
1996-08-03 Well Began Production
1996-08-03 Well Fluid changed to Crude Oil
1996-08-03 Well Mode changed to Pumping
1998-04-21 Well Log Performed
1998-04-22 Perforation Treatment Performed - Cement Squeeze
1998-04-22 Perforation Treatment Performed - Jet Perforation
1998-04-26 Perforation Treatment Performed - Jet Perforation
1998-04-28 Well Log Performed
1998-06-02 Well Began Injection
1998-06-02 Well Fluid changed to Water
1998-06-02 Well Type changed to Injection
2004-03-10 Perforation Treatment Performed - Fractured
2004-03-11 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-07-31 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1996-01-10 368.50 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-05-08 Perforation 1420.00 1424.50 13
1996-05-08 Perforation 1435.50 1439.00 13
1996-05-10 Fracture 1420.00 1439.00 0
1998-04-22 Perforation 1455.00 1456.00 7
1998-04-22 Cement Squeeze 1420.00 1456.00 0
1998-04-26 Perforation 1435.50 1439.00 13
1998-04-26 Perforation 1420.00 1424.50 13
2004-03-10 Fracture 1420.00 1439.00 0
2004-03-11 Acid Treatment 1420.00 1439.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 3366 0.0 0.0 0.0
1997 6086 0.0 0.0 0.0
1998 2628 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[6]

References