If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0134173606000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.125993,"lon":-112.202883,"icon":""}]} |
Location: 00/06-36-013-17W4/0 | |
Location Alias: 00/06-36-13-17 W4M | |
Location Alias 2: 00/06-36-013-17 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 013 | |
Meridian: 4 | |
Range: 17 | |
Section: 36 | |
County/Municipality: Municipal District of Taber | |
Well Name: LITTLE ROCK ENCHANT 6-36-13-17 | |
Operator Name: Razor Energy Corp. | |
License Number: 0050270 | |
License Date: 1974-06-27 | |
License Status: Issued | |
Spud Date: 1974-06-30 | |
Final Drill Date: 1974-07-05 | |
Well Total Depth: 1079.00 m | |
Surface Hole Latitude: 50.125993 | |
Surface Hole Longitude: -112.202883 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1974-06-27 | Obtained License |
1974-07-05 | Finished Drilling |
1974-07-06 | Drill Stem Test Performed |
1974-07-07 | Drill Stem Test Performed |
1974-07-08 | Production Casing Operation Performed |
1975-01-09 | Perforation Treatment Performed - Jet Perforation |
1975-02-05 | Well Mode changed to Drilled and Cased |
1975-07-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1975-07-10 | Perforation Treatment Performed - Fractured |
1981-10-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1981-11-03 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1981-11-03 | Well Fluid changed to Gas |
1981-11-03 | Well Mode changed to Testing |
1981-11-04 | Perforation Treatment Performed - Jet Perforation |
1981-11-04 | Well Fluid changed to Gas |
1981-11-04 | Well Mode changed to Abandoned Zone |
1982-05-11 | Perforation Treatment Performed - Jet Perforation |
1982-08-18 | Perforation Treatment Performed - Cement Squeeze |
1982-08-21 | Perforation Treatment Performed - Jet Perforation |
1982-08-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1983-09-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1983-09-06 | Perforation Treatment Performed - Cement Squeeze |
1992-08-28 | Well Log Performed |
1992-08-29 | Perforation Treatment Performed - Jet Perforation |
1995-06-11 | Perforation Treatment Performed - Fractured |
1995-09-26 | Perforation Treatment Performed - Cement Squeeze |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1975-01-09 | Perforation | 1038.80 | 1041.20 | 7 |
1982-08-21 | Perforation | 749.00 | 750.00 | 13 |
1982-08-21 | Perforation | 751.00 | 752.00 | 13 |
1982-08-25 | Acid Treatment | 749.00 | 752.00 | 0 |
1983-09-06 | Acid Treatment | 749.00 | 752.00 | 0 |
1983-09-06 | Cement Squeeze | 749.00 | 752.00 | 0 |
1992-08-29 | Perforation | 982.10 | 985.10 | 13 |
1992-08-29 | Perforation | 989.40 | 991.80 | 13 |
1995-06-11 | Fracture | 982.10 | 991.80 | 0 |
1995-09-26 | Cement Squeeze | 749.00 | 752.00 | 0 |
1975-07-09 | Acid Treatment | 1038.80 | 1041.20 | 0 |
1975-07-10 | Fracture | 1038.80 | 1041.20 | 0 |
1981-10-28 | Packing Device Capped w/Cement | 1027.00 | 1035.00 | 0 |
1981-11-03 | Packing Device Capped w/Cement | 857.00 | 865.00 | 0 |
1981-11-04 | Perforation | 749.00 | 750.00 | 6 |
1981-11-04 | Perforation | 751.00 | 752.00 | 6 |
1982-05-11 | Perforation | 757.70 | 758.00 | 13 |
1982-08-18 | Cement Squeeze | 749.00 | 758.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1975 | 18 | 0.0 | 0.0 | 0.0 |
For data sources see[5]