If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0144021108002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.153628,"lon":-110.169795,"icon":""}]} |
Location: 00/08-11-014-02W4/2 | |
Location Alias: 00/08-11-14-02 W4M | |
Location Alias 2: 00/08-11-014-02 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 014 | |
Meridian: 4 | |
Range: 02 | |
Section: 11 | |
County/Municipality: Cypress County | |
Well Name: Canlin MEDHAT 8-11-14-2 | |
Operator Name: Canlin Energy Corporation | |
License Number: 0053587 | |
License Date: 1975-05-15 | |
License Status: Issued | |
Spud Date: 1975-06-01 | |
Final Drill Date: 1975-06-06 | |
Well Total Depth: 506.00 m | |
Surface Hole Latitude: 50.153628 | |
Surface Hole Longitude: -110.169795 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1975-05-15 | Obtained License |
1975-06-06 | Finished Drilling |
1975-06-06 | Production Casing Operation Performed |
1975-06-06 | Well Mode changed to Drilled and Cased |
1975-07-23 | Perforation Treatment Performed - Selective Bullet Perforations |
1975-10-14 | Perforation Treatment Performed - Fractured |
1978-06-20 | Perforation Treatment Performed - Fractured |
1978-09-01 | Well Began Production |
1978-09-01 | Well Fluid changed to Gas |
1978-09-01 | Well Mode changed to Flowing |
1982-10-15 | Perforation Treatment Performed - Fractured |
1990-11-19 | Well Structure changed to Commingled |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1975-07-23 | Selective Bullet Perforations | 306.00 | 306.90 | 0 |
1975-07-23 | Selective Bullet Perforations | 354.80 | 372.80 | 0 |
1975-07-23 | Selective Bullet Perforations | 373.40 | 379.20 | 0 |
1975-07-23 | Selective Bullet Perforations | 379.80 | 381.00 | 0 |
1975-07-23 | Selective Bullet Perforations | 382.20 | 384.70 | 0 |
1975-07-23 | Selective Bullet Perforations | 385.90 | 388.30 | 0 |
1975-07-23 | Selective Bullet Perforations | 389.50 | 390.40 | 0 |
1975-07-23 | Selective Bullet Perforations | 393.50 | 394.40 | 0 |
1975-07-23 | Selective Bullet Perforations | 396.80 | 397.50 | 0 |
1975-07-23 | Selective Bullet Perforations | 399.90 | 400.50 | 0 |
1975-07-23 | Selective Bullet Perforations | 402.90 | 403.60 | 0 |
1975-07-23 | Selective Bullet Perforations | 309.70 | 310.30 | 0 |
1975-07-23 | Selective Bullet Perforations | 420.60 | 421.50 | 0 |
1975-07-23 | Selective Bullet Perforations | 422.50 | 452.90 | 0 |
1975-07-23 | Selective Bullet Perforations | 453.80 | 454.80 | 0 |
1975-07-23 | Selective Bullet Perforations | 455.70 | 458.40 | 0 |
1975-07-23 | Selective Bullet Perforations | 459.30 | 460.60 | 0 |
1975-07-23 | Selective Bullet Perforations | 465.40 | 466.60 | 0 |
1975-07-23 | Selective Bullet Perforations | 468.20 | 468.80 | 0 |
1975-07-23 | Selective Bullet Perforations | 471.80 | 473.00 | 0 |
1975-07-23 | Selective Bullet Perforations | 474.00 | 475.50 | 0 |
1975-07-23 | Selective Bullet Perforations | 476.10 | 476.70 | 0 |
1975-07-23 | Selective Bullet Perforations | 313.90 | 336.80 | 0 |
1975-07-23 | Selective Bullet Perforations | 477.90 | 478.50 | 0 |
1975-07-23 | Selective Bullet Perforations | 479.80 | 480.40 | 0 |
1975-07-23 | Selective Bullet Perforations | 481.00 | 481.00 | 0 |
1975-10-14 | Fracture | 306.00 | 481.00 | 0 |
1978-06-20 | Fracture | 451.40 | 481.00 | 0 |
1982-10-15 | Fracture | 453.80 | 481.00 | 0 |
1975-07-23 | Selective Bullet Perforations | 337.70 | 338.60 | 0 |
1975-07-23 | Selective Bullet Perforations | 340.80 | 341.70 | 0 |
1975-07-23 | Selective Bullet Perforations | 345.30 | 347.50 | 0 |
1975-07-23 | Selective Bullet Perforations | 348.70 | 349.90 | 0 |
1975-07-23 | Selective Bullet Perforations | 351.40 | 352.30 | 0 |
1975-07-23 | Selective Bullet Perforations | 353.30 | 354.20 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1978 | 2478 | 0.0 | 0.0 | 0.0 |
1979 | 3830 | 0.0 | 0.0 | 0.0 |
1980 | 2883 | 0.0 | 0.0 | 0.0 |
1981 | 7939 | 0.0 | 0.0 | 0.0 |
1982 | 6296 | 0.0 | 0.0 | 0.0 |
1983 | 5514 | 0.0 | 0.0 | 0.0 |
1984 | 7565 | 0.0 | 0.0 | 0.0 |
1985 | 8220 | 0.0 | 0.0 | 0.0 |
1986 | 8300 | 0.0 | 0.0 | 0.0 |
For data sources see[5]