X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0144021108002

Well Details

Well ID: 0144021108002
Loading map...
Location: 00/08-11-014-02W4/2
Location Alias: 00/08-11-14-02 W4M
Location Alias 2: 00/08-11-014-02 W4/02
Country: Canada
Province: Alberta
Township: 014
Meridian: 4
Range: 02
Section: 11
County/Municipality: Cypress County
Well Name: Canlin MEDHAT 8-11-14-2
Operator Name: Canlin Energy Corporation
License Number: 0053587
License Date: 1975-05-15
License Status: Issued
Spud Date: 1975-06-01
Final Drill Date: 1975-06-06
Well Total Depth: 506.00 m
Surface Hole Latitude: 50.153628
Surface Hole Longitude: -110.169795

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-05-15 Obtained License
1975-06-06 Finished Drilling
1975-06-06 Production Casing Operation Performed
1975-06-06 Well Mode changed to Drilled and Cased
1975-07-23 Perforation Treatment Performed - Selective Bullet Perforations
1975-10-14 Perforation Treatment Performed - Fractured
1978-06-20 Perforation Treatment Performed - Fractured
1978-09-01 Well Began Production
1978-09-01 Well Fluid changed to Gas
1978-09-01 Well Mode changed to Flowing
1982-10-15 Perforation Treatment Performed - Fractured
1990-11-19 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-07-23 Selective Bullet Perforations 306.00 306.90 0
1975-07-23 Selective Bullet Perforations 354.80 372.80 0
1975-07-23 Selective Bullet Perforations 373.40 379.20 0
1975-07-23 Selective Bullet Perforations 379.80 381.00 0
1975-07-23 Selective Bullet Perforations 382.20 384.70 0
1975-07-23 Selective Bullet Perforations 385.90 388.30 0
1975-07-23 Selective Bullet Perforations 389.50 390.40 0
1975-07-23 Selective Bullet Perforations 393.50 394.40 0
1975-07-23 Selective Bullet Perforations 396.80 397.50 0
1975-07-23 Selective Bullet Perforations 399.90 400.50 0
1975-07-23 Selective Bullet Perforations 402.90 403.60 0
1975-07-23 Selective Bullet Perforations 309.70 310.30 0
1975-07-23 Selective Bullet Perforations 420.60 421.50 0
1975-07-23 Selective Bullet Perforations 422.50 452.90 0
1975-07-23 Selective Bullet Perforations 453.80 454.80 0
1975-07-23 Selective Bullet Perforations 455.70 458.40 0
1975-07-23 Selective Bullet Perforations 459.30 460.60 0
1975-07-23 Selective Bullet Perforations 465.40 466.60 0
1975-07-23 Selective Bullet Perforations 468.20 468.80 0
1975-07-23 Selective Bullet Perforations 471.80 473.00 0
1975-07-23 Selective Bullet Perforations 474.00 475.50 0
1975-07-23 Selective Bullet Perforations 476.10 476.70 0
1975-07-23 Selective Bullet Perforations 313.90 336.80 0
1975-07-23 Selective Bullet Perforations 477.90 478.50 0
1975-07-23 Selective Bullet Perforations 479.80 480.40 0
1975-07-23 Selective Bullet Perforations 481.00 481.00 0
1975-10-14 Fracture 306.00 481.00 0
1978-06-20 Fracture 451.40 481.00 0
1982-10-15 Fracture 453.80 481.00 0
1975-07-23 Selective Bullet Perforations 337.70 338.60 0
1975-07-23 Selective Bullet Perforations 340.80 341.70 0
1975-07-23 Selective Bullet Perforations 345.30 347.50 0
1975-07-23 Selective Bullet Perforations 348.70 349.90 0
1975-07-23 Selective Bullet Perforations 351.40 352.30 0
1975-07-23 Selective Bullet Perforations 353.30 354.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1978 2478 0.0 0.0 0.0
1979 3830 0.0 0.0 0.0
1980 2883 0.0 0.0 0.0
1981 7939 0.0 0.0 0.0
1982 6296 0.0 0.0 0.0
1983 5514 0.0 0.0 0.0
1984 7565 0.0 0.0 0.0
1985 8220 0.0 0.0 0.0
1986 8300 0.0 0.0 0.0

For data sources see[5]

References