If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0144021506032 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.16989,"lon":-110.199606,"icon":""}]} |
Location: 03/06-15-014-02W4/2 | |
Location Alias: 03/06-15-14-02 W4M | |
Location Alias 2: 03/06-15-014-02 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 014 | |
Meridian: 4 | |
Range: 02 | |
Section: 15 | |
County/Municipality: Cypress County | |
Well Name: Canlin MEDHAT 6-15-14-2 | |
Operator Name: Canlin Energy Corporation | |
License Number: 0095827 | |
License Date: 1982-05-05 | |
License Status: Issued | |
Spud Date: 1982-05-07 | |
Final Drill Date: 1982-05-08 | |
Well Total Depth: 853.00 m | |
Surface Hole Latitude: 50.169890 | |
Surface Hole Longitude: -110.199606 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1982-05-05 | Obtained License |
1982-05-08 | Finished Drilling |
1982-05-08 | Production Casing Operation Performed |
1982-05-08 | Well Mode changed to Drilled and Cased |
1982-05-18 | Perforation Treatment Performed - Jet Perforation |
1982-05-26 | Perforation Treatment Performed - Jet Perforation |
1982-05-31 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1982-05-31 | Perforation Treatment Performed - Jet Perforation |
1982-06-01 | Perforation Treatment Performed - Fractured |
1982-06-03 | Perforation Treatment Performed - Jet Perforation |
1982-06-07 | Perforation Treatment Performed - Fractured |
1982-07-16 | Well Began Production |
1982-07-16 | Well Fluid changed to Gas |
1982-07-16 | Well Mode changed to Flowing |
2007-06-30 | Well Log Performed |
2007-07-08 | Perforation Treatment Performed - Jet Perforation |
2007-07-14 | Perforation Treatment Performed - Fractured |
2007-07-26 | Well Structure changed to Commingled |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1982-05-18 | Perforation | 765.50 | 767.00 | 7 |
2007-07-08 | Perforation | 642.50 | 643.50 | 13 |
2007-07-08 | Perforation | 640.50 | 641.50 | 13 |
2007-07-08 | Perforation | 638.00 | 639.00 | 13 |
2007-07-08 | Perforation | 462.00 | 464.00 | 13 |
2007-07-08 | Perforation | 428.00 | 429.00 | 13 |
2007-07-08 | Perforation | 424.00 | 426.00 | 13 |
2007-07-08 | Perforation | 417.00 | 418.00 | 13 |
2007-07-08 | Perforation | 396.00 | 397.00 | 13 |
2007-07-08 | Perforation | 384.50 | 385.50 | 13 |
2007-07-08 | Perforation | 381.50 | 382.50 | 13 |
1982-05-26 | Perforation | 757.20 | 758.80 | 7 |
2007-07-14 | Fracture | 642.50 | 643.50 | 0 |
2007-07-14 | Fracture | 640.50 | 641.50 | 0 |
2007-07-14 | Fracture | 638.00 | 639.00 | 0 |
2007-07-14 | Fracture | 462.00 | 464.00 | 0 |
2007-07-14 | Fracture | 428.00 | 429.00 | 0 |
2007-07-14 | Fracture | 424.00 | 426.00 | 0 |
2007-07-14 | Fracture | 417.00 | 418.00 | 0 |
2007-07-14 | Fracture | 396.00 | 397.00 | 0 |
2007-07-14 | Fracture | 384.50 | 385.50 | 0 |
2007-07-14 | Fracture | 381.50 | 382.50 | 0 |
1982-05-26 | Perforation | 751.20 | 752.80 | 7 |
1982-05-31 | Packing Device Capped w/Cement | 760.00 | 763.00 | 0 |
1982-05-31 | Packing Device Capped w/Cement | 727.00 | 735.00 | 0 |
1982-05-31 | Perforation | 670.00 | 673.50 | 5 |
1982-06-01 | Fracture | 670.00 | 673.50 | 0 |
1982-06-03 | Perforation | 492.00 | 495.00 | 15 |
1982-06-07 | Fracture | 492.00 | 495.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1982 | 3970 | 0.0 | 0.0 | 0.0 |
1983 | 4060 | 0.0 | 0.0 | 0.0 |
1984 | 8290 | 0.0 | 0.0 | 0.0 |
1985 | 8251 | 0.0 | 0.0 | 0.0 |
1986 | 8308 | 0.0 | 0.0 | 0.0 |
1987 | 8255 | 0.0 | 0.0 | 0.0 |
1988 | 8267 | 0.0 | 0.0 | 0.0 |
1989 | 8368 | 0.0 | 0.0 | 0.0 |
1990 | 6844 | 0.0 | 0.0 | 0.0 |
1991 | 743 | 0.0 | 0.0 | 0.0 |
1992 | 963 | 0.0 | 0.0 | 0.0 |
For data sources see[5]