0144022410000

Well Details

Well ID: 0144022410000
Loading map...
Location: 00/10-24-014-02W4/0
Location Alias: 00/10-24-14-02 W4M
Location Alias 2: 00/10-24-014-02 W4/00
Country: Canada
Province: Alberta
Township: 014
Meridian: 4
Range: 02
Section: 24
County/Municipality: Cypress County
Well Name: Canlin MEDHAT 10-24-14-2
Operator Name: Canlin Energy Corporation
License Number: 0054558
License Date: 1975-08-11
License Status: Abandoned
Spud Date: 1975-08-29
Final Drill Date: 1975-08-31
Well Total Depth: 746.80 m
Surface Hole Latitude: 50.189113
Surface Hole Longitude: -110.150741

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-08-11 Obtained License
1975-08-29 Lost Circulation Occurred
1975-08-31 Finished Drilling
1975-08-31 Production Casing Operation Performed
1975-08-31 Well Mode changed to Drilled and Cased
1975-09-25 Perforation Treatment Performed - Selective Bullet Perforations
1975-10-09 Perforation Treatment Performed - Selective Bullet Perforations
1975-10-21 Perforation Treatment Performed - Selective Bullet Perforations
1975-11-11 Perforation Treatment Performed - Fractured
1975-11-15 Perforation Treatment Performed - Fractured
1976-01-27 Well Began Production
1976-01-27 Well Fluid changed to Gas
1976-01-27 Well Mode changed to Flowing
1978-06-23 Perforation Treatment Performed - Fractured
1978-07-01 Well Fluid changed to Gas
1978-07-01 Well Mode changed to Flowing
1980-01-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-01-25 Plug Back Performed
1980-01-25 Well Fluid changed to Gas
1980-01-25 Well Mode changed to Abandoned Zone
1985-05-16 Perforation Treatment Performed - Acid Wash - No Pressure
2008-11-18 Perforation Treatment Performed - Cement Squeeze
2008-11-18 Plug Back Performed
2008-11-19 Perforation Treatment Performed - Cement Plug
2008-11-19 Plug Back Performed
2008-12-03 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-09-25 Selective Bullet Perforations 390.40 391.70 0
1975-09-25 Selective Bullet Perforations 442.00 442.90 0
1975-09-25 Selective Bullet Perforations 443.80 445.90 0
1975-09-25 Selective Bullet Perforations 446.50 447.40 0
1975-09-25 Selective Bullet Perforations 452.30 453.50 0
1975-09-25 Selective Bullet Perforations 454.80 458.40 0
1975-09-25 Selective Bullet Perforations 466.30 470.60 0
1975-09-25 Selective Bullet Perforations 473.40 473.40 0
1975-10-09 Selective Bullet Perforations 456.00 457.20 0
1975-10-09 Selective Bullet Perforations 467.30 471.50 0
1975-10-09 Selective Bullet Perforations 474.30 474.30 0
1975-09-25 Selective Bullet Perforations 396.50 399.30 0
1975-10-21 Selective Bullet Perforations 521.20 522.10 0
1975-10-21 Selective Bullet Perforations 523.00 524.60 0
1975-10-21 Selective Bullet Perforations 528.50 529.40 0
1975-10-21 Selective Bullet Perforations 531.00 531.90 0
1975-10-21 Selective Bullet Perforations 536.10 537.40 0
1975-10-21 Selective Bullet Perforations 539.20 542.50 0
1975-10-21 Selective Bullet Perforations 543.50 545.90 0
1975-10-21 Selective Bullet Perforations 547.40 551.70 0
1975-10-21 Selective Bullet Perforations 553.20 558.70 0
1975-10-21 Selective Bullet Perforations 567.20 568.50 0
1975-09-25 Selective Bullet Perforations 401.70 403.90 0
1975-10-21 Selective Bullet Perforations 569.10 570.30 0
1975-10-21 Selective Bullet Perforations 576.70 591.60 0
1975-10-21 Selective Bullet Perforations 593.40 600.50 0
1975-10-21 Selective Bullet Perforations 601.40 602.60 0
1975-10-21 Selective Bullet Perforations 603.20 618.40 0
1975-10-21 Selective Bullet Perforations 622.10 623.00 0
1975-10-21 Selective Bullet Perforations 627.60 628.80 0
1975-10-21 Selective Bullet Perforations 663.20 663.90 0
1975-10-21 Selective Bullet Perforations 666.60 666.90 0
1975-10-21 Selective Bullet Perforations 669.60 671.80 0
1975-09-25 Selective Bullet Perforations 407.80 408.40 0
1975-10-21 Selective Bullet Perforations 673.60 677.30 0
1975-10-21 Selective Bullet Perforations 678.50 695.90 0
1975-10-21 Selective Bullet Perforations 696.80 697.70 0
1975-10-21 Selective Bullet Perforations 698.90 698.90 0
1975-11-11 Fracture 521.20 698.90 0
1975-11-15 Fracture 390.40 474.30 0
1978-06-23 Fracture 521.20 628.80 0
1980-01-25 Packing Device Capped w/Cement 543.80 551.10 0
1985-05-16 Acid Wash 390.40 474.30 0
2008-11-18 Cement Squeeze 390.40 457.20 0
1975-09-25 Selective Bullet Perforations 410.00 410.90 0
2008-11-19 Cement Plug 45.00 390.40 0
1975-09-25 Selective Bullet Perforations 412.40 413.60 0
1975-09-25 Selective Bullet Perforations 415.40 423.10 0
1975-09-25 Selective Bullet Perforations 424.00 424.90 0
1975-09-25 Selective Bullet Perforations 425.80 426.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 3694 0.0 0.0 0.0
1977 7960 0.0 0.0 0.0
1978 1461 0.0 0.0 0.0
1979 6537 0.0 0.0 0.0
1980 8185 0.0 0.0 0.0
1981 7805 0.0 0.0 0.0
1982 8268 0.0 0.0 0.0
1983 4059 0.0 0.0 0.0
1984 8268 0.0 0.0 0.0
1985 8016 0.0 0.0 0.0
1986 8302 0.0 0.0 0.0
1987 8245 0.0 0.0 0.0
1988 5652 0.0 0.0 0.0
1989 7579 0.0 0.0 0.0
1990 6847 0.0 0.0 0.0
1992 964 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1975-08-29 Lost Circulation 38.10 54.90

For data sources see[6]

References