If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0144030608000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.140712,"lon":-110.39261,"icon":""}]} |
Location: 00/08-06-014-03W4/0 | |
Location Alias: 00/08-06-14-03 W4M | |
Location Alias 2: 00/08-06-014-03 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 014 | |
Meridian: 4 | |
Range: 03 | |
Section: 06 | |
County/Municipality: Cypress County | |
Well Name: Canlin MEDHAT 8-6-14-3 | |
Operator Name: Canlin Energy Corporation | |
License Number: 0054014 | |
License Date: 1975-06-24 | |
License Status: Issued | |
Spud Date: 1975-08-20 | |
Final Drill Date: 1975-08-21 | |
Well Total Depth: 577.90 m | |
Surface Hole Latitude: 50.140712 | |
Surface Hole Longitude: -110.392610 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1975-06-24 | Obtained License |
1975-08-21 | Finished Drilling |
1975-08-21 | Production Casing Operation Performed |
1975-08-21 | Well Mode changed to Drilled and Cased |
1975-09-22 | Perforation Treatment Performed - Selective Bullet Perforations |
1975-10-24 | Perforation Treatment Performed - Fractured |
1975-11-08 | Well Began Production |
1975-11-08 | Well Fluid changed to Gas |
1975-11-08 | Well Mode changed to Flowing |
1977-02-08 | Perforation Treatment Performed - Fractured |
1979-10-18 | Perforation Treatment Performed - Jet Perforation |
1979-10-22 | Perforation Treatment Performed - Fractured |
1987-07-31 | Well Fluid changed to Gas |
1987-07-31 | Well Mode changed to Suspended |
2017-12-01 | Well Structure changed to Commingled |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1975-09-22 | Selective Bullet Perforations | 326.10 | 330.10 | 0 |
1975-09-22 | Selective Bullet Perforations | 376.10 | 377.00 | 0 |
1975-09-22 | Selective Bullet Perforations | 378.00 | 379.80 | 0 |
1975-09-22 | Selective Bullet Perforations | 381.00 | 384.00 | 0 |
1975-09-22 | Selective Bullet Perforations | 385.30 | 386.20 | 0 |
1975-09-22 | Selective Bullet Perforations | 387.70 | 388.60 | 0 |
1975-09-22 | Selective Bullet Perforations | 392.00 | 393.20 | 0 |
1975-09-22 | Selective Bullet Perforations | 394.10 | 395.00 | 0 |
1975-09-22 | Selective Bullet Perforations | 396.80 | 398.10 | 0 |
1975-09-22 | Selective Bullet Perforations | 404.80 | 406.90 | 0 |
1975-09-22 | Selective Bullet Perforations | 458.10 | 459.00 | 0 |
1975-09-22 | Selective Bullet Perforations | 333.10 | 336.20 | 0 |
1975-09-22 | Selective Bullet Perforations | 461.80 | 463.90 | 0 |
1975-09-22 | Selective Bullet Perforations | 467.00 | 474.60 | 0 |
1975-09-22 | Selective Bullet Perforations | 476.10 | 479.80 | 0 |
1975-09-22 | Selective Bullet Perforations | 481.00 | 482.20 | 0 |
1975-09-22 | Selective Bullet Perforations | 485.50 | 486.80 | 0 |
1975-09-22 | Selective Bullet Perforations | 487.70 | 493.80 | 0 |
1975-09-22 | Selective Bullet Perforations | 498.70 | 533.70 | 0 |
1975-09-22 | Selective Bullet Perforations | 535.50 | 538.00 | 0 |
1975-09-22 | Selective Bullet Perforations | 544.10 | 566.30 | 0 |
1975-09-22 | Selective Bullet Perforations | 567.20 | 568.50 | 0 |
1975-09-22 | Selective Bullet Perforations | 337.70 | 342.00 | 0 |
1975-09-22 | Selective Bullet Perforations | 570.30 | 570.30 | 0 |
1975-10-24 | Fracture | 326.10 | 570.30 | 0 |
1977-02-08 | Fracture | 458.10 | 570.30 | 0 |
1979-10-18 | Perforation | 395.60 | 397.40 | 6 |
1979-10-22 | Fracture | 392.00 | 406.90 | 0 |
1975-09-22 | Selective Bullet Perforations | 344.40 | 346.60 | 0 |
1975-09-22 | Selective Bullet Perforations | 347.50 | 348.40 | 0 |
1975-09-22 | Selective Bullet Perforations | 350.20 | 351.10 | 0 |
1975-09-22 | Selective Bullet Perforations | 353.30 | 354.20 | 0 |
1975-09-22 | Selective Bullet Perforations | 355.10 | 357.80 | 0 |
1975-09-22 | Selective Bullet Perforations | 358.70 | 362.10 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1975 | 1248 | 0.0 | 0.0 | 0.0 |
1976 | 8387 | 0.0 | 0.0 | 0.0 |
1977 | 8458 | 0.0 | 0.0 | 0.0 |
1978 | 6496 | 0.0 | 0.0 | 0.0 |
1979 | 6281 | 0.0 | 0.0 | 0.0 |
1980 | 8361 | 0.0 | 0.0 | 0.0 |
1981 | 6286 | 0.0 | 0.0 | 0.0 |
1982 | 8100 | 0.0 | 0.0 | 0.0 |
1983 | 7291 | 0.0 | 0.0 | 0.0 |
1984 | 3464 | 0.0 | 0.0 | 0.0 |
1985 | 8284 | 0.0 | 0.0 | 0.0 |
1986 | 6370 | 0.0 | 0.0 | 0.0 |
1987 | 4604 | 0.0 | 0.0 | 0.0 |
For data sources see[5]