X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0144151512006

Well Details

Well ID: 0144151512006
Loading map...
Location: 00/12-15-014-15W4/6
Location Alias: 00/12-15-14-15 W4M
Location Alias 2: 00/12-15-014-15 W4/06
Country: Canada
Province: Alberta
Township: 014
Meridian: 4
Range: 15
Section: 15
County/Municipality: Municipal District of Taber
Well Name: TAC ALDSON 12-15-14-15
Operator Name: Tamarack Acquisition Corp.
License Number: 0317614
License Date: 2004-10-27
License Status: Suspension
Spud Date: 2004-11-03
Final Drill Date: 2004-11-08
Well Total Depth: 1071.00 m
Surface Hole Latitude: 50.176891
Surface Hole Longitude: -111.982811

For data sources see[1][2]

Well History

Date Event
2004-10-27 Obtained License
2004-11-04 Surface Casing Operation Performed
2004-11-05 Direction Drilling Operation Performed - Deviate
2004-11-07 Well Log Performed
2004-11-08 Finished Drilling
2004-11-08 Well Log Performed
2004-11-08 Well Mode changed to Drilled and Cased
2004-11-09 Production Casing Operation Performed
2004-11-09 Rig Released
2004-12-15 Perforation Treatment Performed - Jet Perforation
2004-12-15 Well Log Performed
2004-12-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-12-18 Perforation Treatment Performed - Jet Perforation
2004-12-18 Well Log Performed
2005-08-13 Perforation Treatment Performed - Jet Perforation
2006-12-08 Perforation Treatment Performed - Jet Perforation
2006-12-08 Well Log Performed
2008-05-07 Perforation Treatment Performed - Jet Perforation
2008-05-09 Well Began Production
2008-05-09 Well Fluid changed to Gas
2008-05-09 Well Mode changed to Flowing
2008-07-05 Well Log Performed
2014-10-01 Well Fluid changed to Gas
2014-10-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2004-11-05 187.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2004-12-15 Perforation 1033.00 1034.50 17
2004-12-18 Packing Device Capped w/Cement 1019.00 1027.00 0
2004-12-18 Perforation 903.50 906.50 17
2005-08-13 Perforation 826.00 827.00 17
2005-08-13 Perforation 810.00 811.50 17
2006-12-08 Perforation 769.00 773.00 17
2008-05-07 Perforation 755.00 758.50 17
2008-05-07 Perforation 746.00 747.00 17

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 5650 0.0 0.0 0.0
2009 1798 0.0 0.0 0.0
2010 2545 0.0 0.0 0.0
2011 571 0.0 0.0 0.0
2012 2510 0.0 0.0 0.0

For data sources see[6]

References