X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0144160515000

Well Details

Well ID: 0144160515000
Loading map...
Location: 00/15-05-014-16W4/0
Location Alias: 00/15-05-14-16 W4M
Location Alias 2: 00/15-05-014-16 W4/00
Country: Canada
Province: Alberta
Township: 014
Meridian: 4
Range: 16
Section: 05
County/Municipality: Municipal District of Taber
Well Name: CNRL ENCHANT 15-5-14-16
Operator Name: Canadian Natural Resources Limited
License Number: 0387654
License Date: 2007-12-11
License Status: Issued
Spud Date: 2008-01-15
Final Drill Date: 2008-01-22
Well Total Depth: 1477.00 m
Surface Hole Latitude: 50.149322
Surface Hole Longitude: -112.153539

For data sources see[1][2]

Well History

Date Event
2007-12-11 Obtained License
2008-01-17 Surface Casing Operation Performed
2008-01-18 Direction Drilling Operation Performed - Deviate
2008-01-22 Finished Drilling
2008-01-22 Well Log Performed
2008-01-22 Well Mode changed to Drilled and Cased
2008-01-23 Production Casing Operation Performed
2008-01-24 Rig Released
2008-01-24 Well Log Performed
2008-01-27 Perforation Treatment Performed - Jet Perforation
2008-01-31 Perforation Treatment Performed - Fractured
2008-02-02 Perforation Treatment Performed - Jet Perforation
2008-02-02 Well Log Performed
2008-02-14 Well Began Production
2008-02-14 Well Fluid changed to Crude Oil
2008-02-14 Well Mode changed to Pumping
2016-09-26 Perforation Treatment Performed - Chemical Squeeze

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2008-01-18 430.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2008-01-27 Perforation 1428.00 1428.50 17
2008-01-27 Perforation 1436.00 1436.50 17
2008-01-27 Perforation 1441.00 1441.50 17
2008-01-31 Fracture 1428.00 1441.50 0
2008-02-02 Perforation 1426.00 1430.00 17
2008-02-02 Perforation 1435.00 1437.00 17
2008-02-02 Perforation 1441.00 1444.00 17
2016-09-26 Chemical Squeeze 1426.00 1444.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 7268 0.0 0.0 0.0
2009 8609 0.0 0.0 0.0
2010 8303 0.0 0.0 0.0
2011 8626 0.0 0.0 0.0
2012 8565 0.0 0.0 0.0
2013 8584 0.0 0.0 0.0
2014 8730 0.0 0.0 0.0
2015 8589 0.0 0.0 0.0
2016 8573 0.0 0.0 0.0
2017 8668 0.0 0.0 0.0
2018 8374 0.0 0.0 0.0
2019 6950 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-09-26 No Incident Encountered 0.00 0.00

For data sources see[7]

References