X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0144160606000

Well Details

Well ID: 0144160606000
Loading map...
Location: 00/06-06-014-16W4/0
Location Alias: 00/06-06-14-16 W4M
Location Alias 2: 00/06-06-014-16 W4/00
Country: Canada
Province: Alberta
Township: 014
Meridian: 4
Range: 16
Section: 06
County/Municipality: Municipal District of Taber
Well Name: ANADARKO 6B ENCHANT 6-6-14-16
Operator Name: Canadian Natural Resources Limited
License Number: 0260052
License Date: 2001-09-27
License Status: Suspension
Spud Date: 2001-11-25
Final Drill Date: 2001-12-03
Well Total Depth: 1504.00 m
Surface Hole Latitude: 50.143078
Surface Hole Longitude: -112.175704

For data sources see[1][2]

Well History

Date Event
2001-09-27 Obtained License
2001-11-26 Surface Casing Operation Performed
2001-11-27 Direction Drilling Operation Performed - Deviate
2001-12-03 Finished Drilling
2001-12-03 Well Log Performed
2001-12-05 Production Casing Operation Performed
2001-12-05 Rig Released
2001-12-05 Well Mode changed to Drilled and Cased
2001-12-29 Well Log Performed
2001-12-30 Perforation Treatment Performed - Jet Perforation
2002-01-02 Perforation Treatment Performed - Fractured
2002-01-14 Well Began Production
2002-01-14 Well Fluid changed to Crude Oil
2002-01-14 Well Mode changed to Pumping
2005-10-19 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-11-10 Perforation Treatment Performed - Acid Squeeze - Press Used
2013-09-30 Well Fluid changed to Crude Oil
2013-09-30 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2001-11-27 400.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-12-30 Perforation 1462.00 1480.00 17
2002-01-02 Fracture 1462.00 1480.00 0
2005-10-19 Acid Treatment 1462.00 1480.00 0
2005-11-10 Acid Treatment 1462.00 1480.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 8193 0.0 0.0 0.0
2003 8075 0.0 0.0 0.0
2004 8520 0.0 0.0 0.0
2005 7724 0.0 0.0 0.0
2006 8070 0.0 0.0 0.0
2007 8101 0.0 0.0 0.0
2008 8357 0.0 0.0 0.0
2009 8625 0.0 0.0 0.0
2010 7346 0.0 0.0 0.0
2011 7894 0.0 0.0 0.0
2012 8156 0.0 0.0 0.0
2013 264 0.0 0.0 0.0

For data sources see[6]

References