X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0144161307000

Well Details

Well ID: 0144161307000
Loading map...
Location: 00/07-13-014-16W4/0
Location Alias: 00/07-13-14-16 W4M
Location Alias 2: 00/07-13-014-16 W4/00
Country: Canada
Province: Alberta
Township: 014
Meridian: 4
Range: 16
Section: 13
County/Municipality: Municipal District of Taber
Well Name: NORCEN ENCHANT 7-13-14-16
Operator Name: Canadian Natural Resources Limited
License Number: 0190340
License Date: 1996-08-08
License Status: Amended
Spud Date: 1996-08-25
Final Drill Date: 1996-09-05
Well Total Depth: 1476.00 m
Surface Hole Latitude: 50.171254
Surface Hole Longitude: -112.062419

For data sources see[1][2]

Well History

Date Event
1996-08-08 Obtained License
1996-08-26 Surface Casing Operation Performed
1996-08-27 Direction Drilling Operation Performed - Deviate
1996-09-05 Finished Drilling
1996-09-05 Well Log Performed
1996-09-05 Well Mode changed to Drilled and Cased
1996-09-06 Production Casing Operation Performed
1996-09-06 Rig Released
1996-09-13 Well Log Performed
1996-09-14 Perforation Treatment Performed - Jet Perforation
1996-09-15 Perforation Treatment Performed - Fractured
1996-09-23 Perforation Treatment Performed - Jet Perforation
1996-09-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-09-27 Perforation Treatment Performed - Remedial Casing
1996-10-13 Well Began Production
1996-10-13 Well Fluid changed to Crude Oil
1996-10-13 Well Mode changed to Pumping
1996-10-23 Well Log Performed
1997-06-13 Well Log Performed
1997-06-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-06-19 Well Began Injection
1997-06-19 Well Fluid changed to Water
1997-06-19 Well Type changed to Injection

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1996-08-27 498.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-09-14 Perforation 1418.00 1424.50 13
1996-09-14 Perforation 1430.00 1431.00 13
1996-09-14 Perforation 1436.00 1439.00 13
1996-09-15 Fracture 1418.00 1439.00 0
1996-09-23 Perforation 332.00 333.00 7
1996-09-27 Acid Treatment 332.00 333.00 0
1996-09-27 Remedial Casing Cementing 332.00 333.00 0
1997-06-14 Acid Treatment 1418.00 1439.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 444 0.0 0.0 0.0
1997 48 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[6]

References