X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0144161407000

Well Details

Well ID: 0144161407000
Loading map...
Location: 00/07-14-014-16W4/0
Location Alias: 00/07-14-14-16 W4M
Location Alias 2: 00/07-14-014-16 W4/00
Country: Canada
Province: Alberta
Township: 014
Meridian: 4
Range: 16
Section: 14
County/Municipality: Municipal District of Taber
Well Name: AMOCO ET AL SCANDIA 7-14-14-16
Operator Name: Canadian Natural Resources Limited
License Number: 0030971
License Date: 1966-09-13
License Status: Abandoned
Spud Date: 1966-09-13
Final Drill Date: 1966-09-22
Well Total Depth: 1002.80 m
Surface Hole Latitude: 50.169929
Surface Hole Longitude: -112.083194

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-09-13 Obtained License
1966-09-16 Drill Stem Test Performed
1966-09-17 Drill Stem Test Performed
1966-09-20 Drill Stem Test Performed
1966-09-21 Drill Stem Test Performed
1966-09-22 Finished Drilling
1966-09-22 Well Mode changed to Drilled and Cased
1966-09-23 Drill Stem Test Performed
1966-09-24 Drill Stem Test Performed
1966-09-25 Production Casing Operation Performed
1966-09-29 Perforation Treatment Performed - Jet Perforation
1966-10-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-10-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-10-04 Perforation Treatment Performed - Fractured
1966-10-13 Well Began Production
1966-10-13 Well Fluid changed to Crude Oil
1966-10-13 Well Mode changed to Flowing
1995-09-01 Well Fluid changed to Crude Oil
1995-09-01 Well Mode changed to Suspended
1996-06-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-06-15 Plug Back Performed
1996-06-18 Well Abandoned
1996-06-18 Well Fluid changed to Crude Oil
1996-06-18 Well Mode changed to Abandoned
2003-12-02 Well Log Performed
2004-01-20 Perforation Treatment Performed - Abrasa-Jet Perforation
2004-01-20 Perforation Treatment Performed - Remedial Casing
2004-01-21 Perforation Treatment Performed - Abrasa-Jet Perforation
2004-01-21 Perforation Treatment Performed - Remedial Casing
2004-12-07 Well Log Performed
2004-12-09 Perforation Treatment Performed - Jet Perforation
2009-01-26 Well Log Performed
2009-03-01 Well Log Performed
2009-03-04 Perforation Treatment Performed - Jet Perforation
2009-03-04 Well Log Performed
2009-03-06 Perforation Treatment Performed - Jet Perforation
2009-03-06 Perforation Treatment Performed - Remedial Casing
2009-03-06 Well Log Performed
2009-03-07 Perforation Treatment Performed - Jet Perforation
2009-03-07 Perforation Treatment Performed - Remedial Casing
2009-03-07 Well Log Performed
2009-03-09 Perforation Treatment Performed - Jet Perforation
2009-03-09 Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
2009-03-09 Perforation Treatment Performed - Remedial Casing
2009-03-10 Perforation Treatment Performed - Jet Perforation
2009-03-10 Perforation Treatment Performed - Remedial Casing
2009-03-10 Well Log Performed
2009-03-11 Perforation Treatment Performed - Remedial Casing
2010-01-27 Well Log Performed
2010-02-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-02-25 Perforation Treatment Performed - Jet Perforation
2010-02-25 Well Log Performed
2010-02-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-02-26 Perforation Treatment Performed - Remedial Casing
2010-02-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-02-27 Perforation Treatment Performed - Jet Perforation
2010-02-27 Perforation Treatment Performed - Remedial Casing
2010-02-28 Perforation Treatment Performed - Acid Squeeze - Press Used
2014-01-20 Well Log Performed
2014-02-09 Perforation Treatment Performed - Remedial Casing
2014-02-09 Well Log Performed
2014-02-11 Perforation Treatment Performed - Jet Perforation
2014-02-11 Well Log Performed
2014-02-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-02-14 Perforation Treatment Performed - Remedial Casing
2014-11-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-11-15 Perforation Treatment Performed - Jet Perforation
2014-11-15 Well Log Performed
2015-03-07 Perforation Treatment Performed - Jet Perforation
2015-03-07 Well Log Performed
2017-01-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-01-20 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1966-09-29 Perforation 960.10 965.00 13
2004-01-21 Remedial Casing Cementing 244.80 245.00 0
2004-12-09 Perforation 180.00 181.00 13
2009-03-04 Perforation 799.00 800.00 13
2009-03-06 Remedial Casing Cementing 799.00 800.00 0
2009-03-06 Perforation 767.00 768.00 13
2009-03-07 Remedial Casing Cementing 767.00 768.00 0
2009-03-07 Perforation 741.00 742.00 13
2009-03-09 Remedial Casing Cementing 741.00 742.00 0
2009-03-09 Perforation 733.50 734.50 13
2009-03-09 Packing Dev Cpd w/Res-Gyp Cem 737.00 740.00 0
1966-09-29 Perforation 966.20 966.50 13
2009-03-10 Remedial Casing Cementing 733.50 734.50 0
2009-03-10 Perforation 681.00 682.00 13
2009-03-11 Remedial Casing Cementing 681.00 682.00 0
2010-02-25 Packing Device Capped w/Cement 612.00 620.00 0
2010-02-25 Perforation 575.00 577.00 17
2010-02-25 Perforation 498.00 500.00 17
2010-02-26 Remedial Casing Cementing 575.00 577.00 0
2010-02-26 Packing Device Capped w/Cement 564.00 572.00 0
2010-02-27 Perforation 535.00 537.00 17
2010-02-27 Remedial Casing Cementing 535.00 537.00 0
1966-10-01 Acid Treatment 960.10 966.50 0
2010-02-27 Packing Device Capped w/Cement 522.00 532.00 0
2010-02-28 Acid Treatment 498.00 500.00 0
2014-02-09 Remedial Casing Cementing 180.00 181.00 0
2014-02-11 Perforation 495.00 500.00 18
2014-02-14 Remedial Casing Cementing 495.00 500.00 0
2014-02-14 Packing Device Capped w/Cement 480.00 488.00 0
2014-11-15 Packing Device Capped w/Cement 162.00 170.00 0
2014-11-15 Perforation 113.00 116.00 17
2015-03-07 Perforation 113.00 116.00 17
2017-01-20 Packing Device Capped w/Cement 92.00 100.00 0
1966-10-04 Acid Treatment 960.10 966.50 0
1966-10-04 Fracture 960.10 966.50 0
1996-06-15 Packing Device Capped w/Cement 945.30 953.30 0
2004-01-20 Hydra Jet Perforation 629.80 630.00 13
2004-01-20 Remedial Casing Cementing 629.80 630.00 0
2004-01-21 Hydra Jet Perforation 244.80 245.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 277 0.0 0.0 0.0
1969 5714 0.0 0.0 0.0
1970 5524 0.0 0.0 0.0
1971 4942 0.0 0.0 0.0
1972 8783 0.0 0.0 0.0
1973 8628 0.0 0.0 0.0
1974 8431 0.0 0.0 0.0
1975 8668 0.0 0.0 0.0
1976 8233 0.0 0.0 0.0
1977 8637 0.0 0.0 0.0
1978 8594 0.0 0.0 0.0
1979 8597 0.0 0.0 0.0
1980 6432 0.0 0.0 0.0
1982 4882 0.0 0.0 0.0
1983 8652 0.0 0.0 0.0
1984 8622 0.0 0.0 0.0
1985 8759 0.0 0.0 0.0
1986 8758 0.0 0.0 0.0
1987 8650 0.0 0.0 0.0
1988 8698 0.0 0.0 0.0
1989 8711 0.0 0.0 0.0
1990 7679 0.0 0.0 0.0
1991 8435 0.0 0.0 0.0
1992 7885 0.0 0.0 0.0
1993 8278 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-02-15 No Incident Encountered 0.00 0.00
2015-04-02 No Incident Encountered 0.00 0.00
2017-01-23 No Incident Encountered 0.00 0.00

For data sources see[6]

References